Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Finance LUDHIANA | PUNJAB | 141001 | ₹7.1 L | L1 | Admitted-Finance |
| 2 | L2₹7.5 L+₹36,127 (5.06%)Admitted-Finance | ₹7.5 L+₹36,127 (5.06%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 L+₹1.6 L (23.1%)Admitted-Finance | ₹8.8 L+₹1.6 L (23.1%) | L3 | Admitted-Finance |
| 4 | L4₹11.9 L+₹4.8 L (67.2%)Admitted-Finance | ₹11.9 L+₹4.8 L (67.2%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shambhu Ram L3 | RAKESH KUMAR L1 | ASHWANI SHARMA L4 | MAHERBAN SINGH L2 |
|---|---|---|---|---|---|---|---|
| 1.00Sub-Head : Earth Work | |||||||
| 1.01Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||||
| 1.02 | a) All kinds of soil | 13 | One Cubic Metre | 200 ₹2,600 | 150 ₹1,950 Lowest | 300 ₹3,900 | 200 ₹2,600 |
| 1.03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 5 | One Cubic Metre | 160 ₹800 Lowest | 180 ₹900 | 350 ₹1,750 | 1,200 ₹6,000 |
| 1.04 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 299 | One Square Metre | 14 ₹4,186 | 7 ₹2,093 Lowest | 150 ₹44,850 | 10 ₹2,990 |
| 2.00Sub-Head : Concrete Work | |||||||
| 2.01Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||||
| 2.02 | a) 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3 | One Cubic Metre | 7,500 ₹22,500 | 7,500 ₹22,500 | 7,800 ₹23,400 | 5,500 ₹16,500 Lowest |
| 2.03 | b) 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 9 | One Cubic Metre | 6,000 ₹54,000 | 5,500 ₹49,500 | 6,200 ₹55,800 | 4,000 ₹36,000 Lowest |
| 3.00Sub-Head : Brick Work | |||||||
Tender Value
₹12.4 L
EMD Value
₹24,749
Closing Date
8 Nov 2025, 6:00 pmClosed
Executive Engineer (Civil)
BSNL Civil Division, T.E Building, Top Floor Dhalpur Kullu HP
Construction of Bifurcation wall to Dinning Hall in JLN Govt College Campus Haripur Manali Distt Kullu HP
2025_BSNL_253512_1
EE/BSNL/CD/KLU/DB / Year 2025-26/22.
Open Tender
Civil Works - Buildings
Item Rate
45 days
Kullu
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A.O (EF) O/o The CGMT, BSNL, HP Telecom Circle
₹24,749
12 Nov 2025
27 Oct 2025
11 Nov 2025
27 Oct 2025
8 Nov 2025
27 Oct 2025
27 Oct 2025 - 7 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
NITDininningHall-22.pdf
Other Document • 0.59 MB
BOQ_291544.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .