| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.0 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹21.1 Cr+₹2.5 L (0.12%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹23.3 Cr+₹2.3 Cr (10.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹24.5 Cr+₹3.5 Cr (16.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹24.9 Cr+₹3.9 Cr (18.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹27.7 Cr
EMD Value
₹55.4 L
Closing Date
9 Feb 2026, 6:00 pmClosed
Executive Engineer KDA Kota
NEAR CAD CIRCLE KOTA
Widening and renovation of the road from Raipura Circle to Thegda culvert.
2026_UITKo_526943_1
30/2025-26 (24)
Open Tender
Civil Works
Percentage
540 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
Online Through SSO Portal
₹55.4 L
Yes
30 Mar 2026
16 Jan 2026
10 Feb 2026
16 Jan 2026
9 Feb 2026
16 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 13,296 | Cum | 178 | ₹23,66,688 |
| 2 | Random rubble dry stone Kharanja under floor. | 2,394 | Cum | 932 | ₹22,31,208 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 1,057.5 | Cum | 3,847 | ₹40,68,202.5 |
| 4 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 7,736 | Cum | 4,934 | ₹3,81,69,424 |
| 5 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.
M20 grade Nominal Mix / Design Mix | 844 | Cum | 5,609 | ₹47,33,996 |
| 6 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level.
('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) | 7,47,508.4 | kg | 77 | ₹5,75,58,146.8 |
| 7 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 21,520 | Sqm. | 157 | ₹33,78,640 |
| 8 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :
Walls (any thickness) including attached pilasters, buttresses plinth and string course. | 15,870 | Sqm | 289 | ₹45,86,430 |
| 9 | Providing A.C pipe Weep holes 150mm dia in Masonry/Plain Concrete/.Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specfication as per MoRTH Specification
Clause 2205 | 2,000 | R.MTR | 220 | ₹4,40,000 |
| 10 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. | 3.96 | Hect | 12,513 | ₹49,551.48 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
corrigendum_date_nit30.pdf
Other Document • 0.41 MB
CORRIGENDUM_30_22_24.pdf
Other Document • 0.12 MB
Post_Qualification_30_24.pdf
Tender Documents • 22.36 MB
BOQ_940312.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .