Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L | L1 | Accepted-AOC FIRST LOWEST |
| 2 | L2₹20.3 LRejected-AOC | ₹20.3 L | L2 | Rejected-AOC SECOND LOWEST |
| Sl No | Description | Qty | Unit | ABDUL NASAR. M L2 | Aboobacker L1 |
|---|---|---|---|---|---|
| 1.00Protection works | |||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 154.9 | cum | 60 ₹9,293.70 | 59 ₹9,138.81 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 47.17 | cum | 7,200 ₹3.4 L | 6,902 ₹3.3 L |
| 1.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 87.14 | cum | 8,100 ₹7.1 L | 7,995 ₹7.0 L |
| 1.00 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 26.51 | cum | 9,000 ₹2.4 L | 8,686 ₹2.3 L |
| 1.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 2.54 | MT | 97,000 ₹2.5 L | 94,842 ₹2.4 L |
| 1.01 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 9.7 | cum | 8,600 ₹83,420 | 8,352 ₹81,014.40 |
| 1.01 | 8.20:Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer . | 120 | RM | 3,300 ₹4.0 L | 3,252 ₹3.9 L |
| 1.01 | 13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material | 1.47 | cum | 2,880 ₹4,233.60 | 3,291 ₹4,837.77 |
| 1.01 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | 4 | each | 745 ₹2,980 | 2,718 ₹10,872 |
Updated dates
Tender Value
₹21.1 L
EMD Value
₹50,000
Closing Date
2 Mar 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer PWD Roads Division Palakka
GENERAL-Providing drainage facilities and footpath- Thottara-Construction of footpath and drainage facilities from PKM Private ITI to Karimpuzha Higher Secondary School in Ottappalam- Mannarkkad Road at km 25/520-General Civil Work
2026_PWD_838281_1
PWD/RB/TR/14739/2025_5_1_ 1/1
Open Tender
Civil Works - Roads
180 days
Mannarkkad
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
23 Mar 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
Protection works
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
8.20:Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1412090.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.12 MB
BOQ_1412090.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid