| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 CrAccepted-AOC AMLA TOLA CHAIBASA | CHAIBASA | WEST SINGHBHUM | JHARKHAND | ₹12.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹12.2 Cr+₹15.8 L (1.32%)Rejected-Finance 30 INDUSTRIAL AREA KOKAR RANCHI 834004 JHARKHAND | RANCHI | JHARKHAND | 834004 | ₹12.2 Cr+₹15.8 L (1.32%) | L2 | Rejected-Finance L2 |
| 3 | L3₹13.0 Cr+₹96.8 L (8.04%)Rejected-Finance | ₹13.0 Cr+₹96.8 L (8.04%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical ALAKPURI NEAR DURGA MANDIR DIST GIRIDIH | GIRIDIH | JHARKHAND | 815301 | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | M/s Raj Construction L2 | M/s Satyam Builders L1 | M/s N. K. Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation trench in ordinary soil (vide classification of soil item - B ) and disposal of excavated earth as obtained to a distance up to 50 M including all lift , leveling ramming the foundation trenches removing roots of tree shrubs all complete as per approved design building specification and direction of E/I | 2,838.73 | Cum | 148 ₹4,20,132.04 | 147.55 ₹4,18,854.61 Lowest | 159.41 ₹4,52,521.95 |
| 2.00 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 641.92 | Cum | 60 ₹38,515.5 | 54.62 ₹35,061.94 Lowest | 59.01 ₹37,879.99 |
| 3.00 | Extra for earth work in hard soil as per specification & direction of engineer in charge ( vide classification of soil item B) | 1,285.28 | Cum | 20 ₹25,705.68 | 15.07 ₹19,369.23 Lowest | 16.29 ₹20,937.28 |
| 4.00 | Earth filling in foundation trenches and plinth in layer not exceeding 150 mm thick wall watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trencheed with a lead of 50mm and lift of 1.5 m all complete as per building specification and direction of E/I ( mode of measurement compacted volume ) | 2,705.49 | Cum | 60 ₹1,62,329.4 | 53.73 ₹1,45,365.98 Lowest | 58.04 ₹1,57,026.64 |
| 5.00 | Providing coarse clean local sand in filling in foundation trench or in pinth including ramming and watering in layer not exceeding 150mm thick with all lead and 1.5 m lift including cost of all material , labous , royality and taxes all complete as per building specification and direction of engineer in charge ( mode of measurement compacted volume) | 369.75 | Cum | 600 ₹2,21,847.6 | 572.94 ₹2,11,842.27 Lowest | 618.99 ₹2,28,869.08 |
| 6.00 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l | 2,481.31 | Sqm | 400 ₹9,92,522.4 | 321.06 ₹7,96,648.1 Lowest | 346.86 ₹8,60,665.8 |
| 7.00CONCRETE WORK | ||||||
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) | 0.84 | Cum | 4,200 ₹3,511.2 | 3,913.98 ₹3,272.09 Lowest | 4,228.5 ₹3,535.03 |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 mm nominal size) | 339.56 | Cum | 3,800 ₹12,90,316.6 | 3,646.22 ₹12,38,099.52 Lowest | 3,939.22 ₹13,37,589.73 |
| 10.00 | Providing and laying damp proof course 50mm thick with cement concrete 1:2:4 ( 1cement,2 coarse sand, 4 graded stone 20mm nominal size | 2.76 | Sqm | 280 ₹772.8 | 270.53 ₹746.66 Lowest | 292.27 ₹806.67 |
Tender Value
Refer Docs
EMD Value
₹12.4 L
Closing Date
2 May 2025, 5:00 pmClosed
Nodal Officer
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Beside Jharkhand Mantralaya, Dhurwa, Ranchi-834004.
Construction of Community Health Centre Building at Majhgaon Block in West Singhbhum District.
2025_JSBCC_99769_1
JSBCCL/125/2024-25
Open Tender
Civil Works - Buildings
Item Rate
365 days
West Singhbhum
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹12.4 L
13 May 2026
11 Apr 2025
5 May 2025
11 Apr 2025
2 May 2025
11 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trench in ordinary soil (vide classification of soil item - B ) and disposal of excavated earth as obtained to a distance up to 50 M including all lift , leveling ramming the foundation trenches removing roots of tree shrubs all complete as per approved design building specification and direction of E/I | - | Cum | - | - |
| - | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 1 | Cum | - | - |
| - | Extra for earth work in hard soil as per specification & direction of engineer in charge ( vide classification of soil item B) | 0.6 | Cum | - | - |
| - | Earth filling in foundation trenches and plinth in layer not exceeding 150 mm thick wall watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trencheed with a lead of 50mm and lift of 1.5 m all complete as per building specification and direction of E/I ( mode of measurement compacted volume ) | 1 | Cum | - | - |
| - | Providing coarse clean local sand in filling in foundation trench or in pinth including ramming and watering in layer not exceeding 150mm thick with all lead and 1.5 m lift including cost of all material , labous , royality and taxes all complete as per building specification and direction of engineer in charge ( mode of measurement compacted volume) | 0.4 | Cum | - | - |
| - | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l | 0.4 | Sqm | - | - |
| - | CONCRETE WORK | - | - | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) | 1 | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.8 | Cum | - | - |
| - | Providing and laying damp proof course 50mm thick with cement concrete 1:2:4 ( 1cement,2 coarse sand, 4 graded stone 20mm nominal size | 1 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
SBD-125.pdf
Tender Documents • 9.40 MB
BOQ_134568.xls
BOQ • 0.73 MB
BOQ.xls
BOQ • 0.74 MB
Tenderdocument.pdf
Tender Documents • 9.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .