Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.2 L
EMD Value
₹6,460
Closing Date
30 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
Office Of The Executive Engineer REW Samba
Refer as per BOQ
2026_RDPR_331995_18
185 REW Samba of 2026-27 Date 21.11.2026
Open Tender
Civil Works
Percentage
30 days
Vijaypur
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹6,460
23 Nov 2026
23 Nov 2026
1 Dec 2026
23 Nov 2026
30 Nov 2026
23 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed | 36.05 | cum | 479.25 | ₹17,276.96 |
| - | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded | 6.01 | cum | 4,826.5 | ₹29,007.27 |
| - | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 180 | cum | 276 | ₹49,680 |
| - | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size,20% boulders | 22 | cum | 5,733.6 | ₹1,26,139.2 |
| - | Centring and shuttering including strutting, propping etc. and removal of form work for:-a) Foundation, footings, bases of columns. | 110 | sqm | 286.35 | ₹31,498.5 |
| - | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring. shuttering, finishing and reinforcement-All
work upto plinth level.1.1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20mm nominal size).per direction of Engineer-in-charge | 1.05 | cum | 7,275.25 | ₹7,639.01 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level- Thermo-Mechanically Treated bars of grade Fe-500D or more. | 94 | KG | 123.2 | ₹11,580.8 |
| - | carriage of extra good earth 5 k m | - | cum | 250.47 | - |
| - | Carriage of Sand | 10 | cum | 200.47 | ₹2,004.7 |
| - | Carriage of Bajree | 19.5 | cum | 200.47 | ₹3,909.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1127004.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .