Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC GREEN LAND RESIDENCY MANGALPADY BANDIYOD 671324 | MANGALPADY | KASARAGOD | KERALA | 671324 | ₹5.1 L | L1 | Accepted-AOC Lowest quoted bidder |
| 2 | L2₹5.3 LRejected-AOC | ₹5.3 L | L2 | Rejected-AOC second lowest bidder |
| Sl No | Description | Qty | Unit | HASSAN BASHEER L1 | BASHEER MOHAMMEED L2 |
|---|---|---|---|---|---|
| 1.00Maintenance of Canals & Overhauling of Pumpsets | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 7,945 | sqm | 17.1 ₹1.4 L | 17.1 ₹1.4 L |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 2,531.6 | sqm | 124.2 ₹3.1 L | 131 ₹3.3 L |
| 1.00 | OD12204/2025-2026: labor charge for Fitting carefully the motor and pump set unit after taking the motor from a higher place before the pumping season without any damage as directed by departmental officer at site. | 3 | each | 5,000 ₹15,000 | 5,000 ₹15,000 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2.21 | cum | 242.35 ₹534.38 | 242.35 ₹534.38 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 2.21 | cum | 3,756.8 ₹8,283.74 | 3,756.8 ₹8,283.74 |
| 1.01 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.5 | cum | 9,762.7 ₹34,169.45 | 9,762.7 ₹34,169.45 |
Tender Value
₹5.1 L
EMD Value
₹12,708
Closing Date
9 Feb 2026, 6:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Minor Irrigation Subdivision, Manjeshwar - 671323
GENERAL-AM 2025-26-Annual Maintenance of Kalpara LI Scheme in Heroor Village of Mangalpady Panchayath for the year 2025- 2026-General Civil Work
2026_Irrig_832538_1
IRR/IA/TR/3888/2025_5_2_1/1
Open Tender
Civil Works - Others
365 days
Kalpara
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,125
Yes
₹12,708
Yes
18 Mar 2026
2 Feb 2026
11 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Maintenance of Canals & Overhauling of Pumpsets
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
OD12204/2025-2026: labor charge for Fitting carefully the motor and pump set unit after taking the motor from a higher place before the pumping season without any damage as directed by departmental officer at site.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1399470.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.96 MB
BOQ_1399470.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid