Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC 00 VPO MALIKPUR BANGER TEH BILASPUR DISTT YAMUNANAGAR 135102 | MALIKPUR BANGER | YAMUNANAGAR | HARYANA | 135102 | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.2 L+₹1.3 L (10.6%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹15.0 L+₹3.0 L (25.3%)Rejected-AOC 233 12 AMARGARH GAMRI GALI NO 11 KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | L3 | Rejected-AOC L3 |
Tender Value
₹14.6 L
EMD Value
₹17,220
Closing Date
28 Jan 2026, 5:00 pmClosed
BHARAT BHUSHAN
Municipal Committee Sadhaura
Construction of nallah near Torawala pond and from wine shop to Kotla Chownk in Ward No. 06 MC Sadhaura.
2026_HRY_498705_1
20261E7EB4C1 134C 469D 8460 6F812FA7DBE81314ULB
Open Tender
Civil Works
Works
100 days
SADHAURA
nallah near Torawala pond and from wine shop to Kotla Chownk
2 documents required · 2 mandatory
₹1,000
₹17,220
Yes
10 Feb 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
28 Jan 2026
22 Jan 2026
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km]
[3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [5km]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
[6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_577270.xls
BOQ • 0.24 MB
AD0149503.pdf
Additional Documents • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .