Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-Finance 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 UDYAM GJ 05 0006749 24AACFK2418A1Z4 B R MSME STATUS AS VERIFIED | BHAVNAGAR | GUJARAT | 364001 | ₹13.2 L | L1 | Accepted-Finance Turnover Basis |
| 2 | L2₹13.2 LRejected-Finance | ₹13.2 L | L2 | Rejected-Finance Turnover Basis |
| 3 | Rejected-Technical WARD NO 4 CHORHATA REWA 486001 MADHYA PRADESH | REWA | MADHYA PRADESH | 486001 | - | - | Rejected-Technical Disqualified,bidder has not uploaded notarized affidavit on non judicial stamp paper as per NIT clause 10 (C) |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified,uploaded copy of undertaking as per annexure ix of SBD without stamp and notarized |
| 5 | Rejected-Technical OFFICE NO S 2 BUILDING NO 91B M P NAGAR BHOPAL 462021 | BHOPAL | BHOPAL | MADHYA PRADESH | 462021 | - | - | Rejected-Technical Disqualified, bidder has not uploaded undertaking as per annexure iv of SBD |
| Sl No | Description | Qty | Unit | LALIT KUMAR MISHRA L1 | KRISHNA CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00Engagement of labours (Under unskilled workers category) | |||||
| 1.01 | Work contractor for recording approach channel water level near intake area and informing to control room at PH-I (3x105MW) THP, MPPGCL, Sirmour. The rates are inclusive cost of worker payment and necessary etc. the work shall be executed as per instruction of Engineer-in-charge and according to scope of work. (For the work one Unskilled worker shall be provided in each shift with)
. | 1 | year | 11,14,453.87 ₹11.1 L | 11,14,453.87 ₹11.1 L |
Tender Value
₹13.4 L
EMD Value
₹26,800
Closing Date
11 Jul 2025, 3:30 pmClosed
ACE THC Sirmour
ACE THC Sirmour
Providing and Engaging unskilled labour for recording approach channel water level at intake and informing to control room at PH I, 3x105MW THC MPPGCL Sirmour
2025_MPPGC_424174_1
424174
Open Tender
Miscellaneous Services
720 days
Sirmour
As per NIT
12 documents required · 12 mandatory
₹1,000
Yes
₹26,800
Yes
2 Jan 2026
13 Jun 2025
14 Jul 2025
13 Jun 2025
11 Jul 2025
13 Jun 2025
Amount
Engagement of labours (Under unskilled workers category)
Work contractor for recording approach channel water level near intake area and informing to control room at PH-I (3x105MW) THP, MPPGCL, Sirmour. The rates are inclusive cost of worker payment and necessary etc. the work shall be executed as per instruction of Engineer-in-charge and according to scope of work. (For the work one Unskilled worker shall be provided in each shift with) .
KRISHNA CONSTRUCTION COMPANY (BID ID -1294574)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid