Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC KALLOORKAD GRAMA PANCHAYATH | KOLLAM | KERALA | 689694 | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | L2₹5.1 L+₹37,240.29 (7.81%)Rejected-AOC KURUPPAMPADY VENDOR PRASEETHA K | PALAKKAD | KERALA | 678001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹5.2 L+₹41,955.49 (8.79%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹5.2 L+₹43,864.58 (9.19%)Rejected-Finance KALLOORKAD GRAMA PANCHAYATH KERALA KL | KOZHIKODE | KERALA | 612906 | L4 | Rejected-Finance 4th Lowest |
Tender Value
₹6.2 L
EMD Value
₹15,620
Closing Date
9 Sept 2019, 3:00 pmClosed
ASSISTANT ENGINEER
LSGD SUB DIVISION, MUVATTUPUZHA
KALLOORKADU PHC MAINTENANCE
2019_LSGD_294658_1
07/AE/LSGD/MVPA/19-20
Open Tender
Civil Works - Buildings
Item Rate
120 days
KALLOORKADU
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,250
Yes
online
₹15,620
Yes
13 May 2020
31 Aug 2019
16 Sept 2019
31 Aug 2019
9 Sept 2019
31 Aug 2019
Amount
Detailed Estimate
11.41.2 : Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm.
15.23.1 : Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
od158073/2019_2020 : Providing and laying 60mm thick factory made cement concrete interlocking paver block of M30 grade made by block making machine with strong vibratory compaction, of approved size design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of 6mm metal all complete as per the direction of Engineer - in- charge<br>for medium traffic areas
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
od158259/2019_2020 : Supplying and fixing 150mm dia PVC half cut section with brackets at ends of sheet or tiled roof or rain water collection including all cost of materials,conveyance and labour
12.51.1 : Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete:Ridges plain (500-600 mm)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
10.16.1 : Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
25.7 : Designing, fabricating, testing, installing and fixing in position Curtain Wall withAluminium Composite Panel Cladding, with open grooves for linear as well ascurvilinear portions of the building , for all heights and all levels etc. including:a) Structural analysis & design and preparation of shop drawings for pressureequalisation or rain screen principle as required, proper drainage of water to makeit watertight including checking of all the structural and functional design.b) Providing, fabricating and supplying and fixing panels of aluminium compositepanel cladding in pan shape in metalic colour of approved shades made out of4mm thick aluminium composite panel material consisting of 3mm thick FR grademineral core sandwiched between two Alumini um sheets (each0.5mm thick). Thealuminium composite panel cladding sheet shall be coil coated, with Kynar500based PVDF / Lumiflon based fluoropolymer resin coating of approved colourand shade on face # 1 and polymer (Service) coating on face # 2 as specified usingstainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backerrods etc.c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanisedwith serrations and serrated washers to arrest the wind load movement, fasteners,SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators toprevent bi-metallic contacts all complete required to perform as per specificationand drawing The item includes cost of all material & labour component, the cost ofall mock ups at site, cost of all samples of the individual components for testing inan approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wallwith aluminium composite panel cladding till the handing over of the building foroccupation. Base frame work for ACP cladding is payable under the relevantaluminium item.s The Contractor shall provide curtain wall with aluminiumcomposite panel cladding, having all the performance characteristics all complete, as per the Architectural drawings, as per item description, as specified, as per theapproved shop drawings and as directed by the Engineer-in-Charge.However, for the purpose of payment, only the actual area on the external face ofthe curtain wall with Aluminum Composite Panel Cladding (including width ofgroove) shall be measured in sqm. up to two decimal places.
21.5 : Providing and fixing powder coated aluminium work ( minimum thickness of powder coating 50 micron) consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in-Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ).
Abbas VM
Abdul Raooful Ansari
SREEJITH V S
Bidder Name
Praveen Varghese
SREEJITH V S
Abbas VM
Abdul Raooful Ansari
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_401877.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .