| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹30.6 L+₹79,236.75 (2.65%)Rejected-AOC MALAYATHIL HOUSE PAZHAMALLUR P O KUTTILANGADI 676506 | KUTTILANGADI | MALAPPURAM | KERALA | 676506 | L2 | Rejected-AOC L2 | |
| 3 | L3₹30.8 L+₹99,750.28 (3.34%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical L5 |
| Sl No | Description | Qty | Unit | S3 CONSTRUCTIONS L5 | Muhammed Musthafa M L2 | A P SANKARAN L3 | Mankada Labour Contract Co Operative Society ltd L1 | AHAMMED SHIHAD UT L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Building work | ||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 208 | sqm | 13.36 ₹2,778.88 | 12.62 ₹2,624.96 | 12.71 ₹2,643.68 | 12.3 ₹2,558.4 | 10 ₹2,080 Lowest |
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 60 | cum | 375.72 ₹22,543.2 | 355.26 ₹21,315.6 | 357.65 ₹21,459 | 346.08 ₹20,764.8 Lowest | 417 ₹25,020 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 23.93 | cum | 268.96 ₹6,435.14 | 254.31 ₹6,084.62 | 256.02 ₹6,125.53 | 247.74 ₹5,927.43 Lowest | 298 ₹7,129.95 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 52.75 | cum | 193.83 ₹10,224.53 | 183.27 ₹9,667.49 | 184.51 ₹9,732.9 | 178.54 ₹9,417.99 Lowest | 215 ₹11,341.25 |
| 1.00 | OD6594/2023-2024:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc.complete as per direction of Departmental officers at site. | 39.28 | cum | 3,162.02 ₹1,24,210.47 | 2,989.86 ₹1,17,447.68 | 3,009.9 ₹1,18,234.89 | 2,912.58 ₹1,14,411.97 | 2,880.66 ₹1,13,158.09 Lowest |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 1.61 | cum | 6,530.71 ₹10,514.44 | 6,175.14 ₹9,941.98 | 6,216.51 ₹10,008.58 | 6,015.51 ₹9,684.97 | 5,804.8 ₹9,345.73 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.1 | sqm | 303.68 ₹1,245.09 | 287.14 ₹1,177.27 | 289.07 ₹1,185.19 | 279.72 ₹1,146.85 Lowest | 296.56 ₹1,215.9 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 77.26 | sqm | 649.53 ₹50,182.69 | 614.16 ₹47,450 | 618.28 ₹47,768.31 | 598.29 ₹46,223.89 | 576.8 ₹44,563.57 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 64.86 | sqm | 588.49 ₹38,167.11 | 556.45 ₹36,089.12 | 560.18 ₹36,331.03 | 542.07 ₹35,156.49 Lowest | 555.05 ₹35,998.32 |
Tender Value
₹36.0 L
EMD Value
₹50,000
Closing Date
13 Mar 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
PWD BUILDINGS DIVISION MALAPPURAM
DEPOSIT Construction of Village Office at Oorakam in Vengara ConstituencyConstruction of Village Office at Oorakam in Vengara Constituency General Civil Work
2026_PWD_844049_1
BL/DN/MPM/50/2025-26
Open Tender
Civil Works - Buildings
Item Rate
MALAPPURAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
3 Jul 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building work | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | - | cum | - | - |
| 1.003 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | - | cum | - | - |
| 1.005 | OD6594/2023-2024:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc.complete as per direction of Departmental officers at site. | 1 | cum | - | - |
| 1.006 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | - | cum | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.008 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.4 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1424922.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 4.91 MB
BOQ_1424922.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .