| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.0 LAccepted-Finance | ₹80.0 L | L1 | Accepted-Finance L1 LCCS |
| 2 | L2₹80.8 LRejected-Finance | ₹80.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹83.6 LRejected-Finance | ₹83.6 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Abdul Khalam L2 | MERP CONSTRUCTIONS PRIVATE LIMITED L3 | Kollam progressive labour contract co-operative society Ltd No Q1231,vengai (PO)sasthamcotta L1 |
|---|---|---|---|---|---|---|
| 1.00BUILDING PROPER | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 144.96 | cum | 359.72 ₹52,145.73 | 330 ₹47,837.46 | 339 ₹49,142.12 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 5.4 | cum | 131.02 ₹707.51 | 129 ₹696.60 | 124 ₹669.60 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 28.18 | cum | 7,850 ₹2.2 L | 7,600 ₹2.1 L | 7,487 ₹2.1 L |
| 1.00 | OD23218/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately.All work upto plinth level | 65.08 | cum | 10,650 ₹6.9 L | 11,000 ₹7.2 L | 10,278 ₹6.7 L |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 5.1 | cum | 8,364.57 ₹42,650.94 | 8,000 ₹40,792 | 7,895 ₹40,256.61 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 104.39 | cum | 318.47 ₹33,245.08 | 250 ₹26,097.50 | 300 ₹31,317 |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 62.17 | cum | 729.39 ₹45,344.72 | 1,250 ₹77,710 | 688 ₹42,771.58 |
| 1.01 | OD23219/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately.All work above plinth level upto floor V level | 126.23 | cum | 12,500 ₹15.8 L | 12,450 ₹15.7 L | 12,199 ₹15.4 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 145.52 | sqm | 386.16 ₹56,194 | 360 ₹52,387.20 | 364 ₹52,969.28 |
Tender Value
₹84.7 L
EMD Value
₹50,000
Closing Date
15 Jan 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Buildings Division Kollam
General Plan Fund 2023 24 Construction of school building for Govt LPS Varavila Karunagappally General Civil Work
2025_PWD_818772_2
PWD/BLDG/TR/12657/2022_23
Open Tender
Civil Works - Buildings
365 days
Varavila
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
4 Mar 2026
2 Jan 2026
19 Jan 2026
2 Jan 2026
15 Jan 2026
2 Jan 2026
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1383684.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid