Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹36.5 L
EMD Value
₹72,900
Closing Date
7 Oct 2026, 6:00 pmClosed
District Soil Conservation Officer (DSCO) Srinagar
Office of the District Soil Conservation Officer (DSCO) Srinagar, Department of Soil and Water Conservation, District Srinagar, Magarmal Bagh, Srinagar, Kashmir, Jammu and Kashmir
Laying of crates at Pehlipora A, Laying of crates at Kondbal, Laying of crates at Manigam, Laying of crates at Shaginag Vurpash, Laying of crates at Pehlipora B and Laying of crates at Margund Forest.
2026_SWCD_326290_2
E-NIT NO 04 OF 2026-27 DATED 25-09-2026
Open Tender
Civil Works
Percentage
45 days
Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Centralized Pooling Account No. 0110010200001106
₹72,900
8 Oct 2026
28 Sept 2026
8 Oct 2026
28 Sept 2026
7 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and Laying of crate wire structures at Pehlipora A upper Bakshi Mohalla N 34. 275914E 74.679338 | |||||
| 1.1 | Earth work in trenchs excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by E.I.C: all kinds of soil: | 38.06 | CUM | 256.83 | ₹9,774.95 |
| 1.2 | Supply of crate wire mesh (4 " x4 ") incl carriage upto site of work: incl knitting of crates and packing binding | 666.17 | Sqm | 250 | ₹1,66,542.5 |
| 1.3 | Handpacking stones in wire crates excluding cost of crates and stones | 98.6 | cum | 371.15 | ₹36,595.39 |
| 1.4 | Handpacking stones in wire crates excluding cost of crates | 73.95 | cum | 2,700 | ₹1,99,665 |
| 1.5 | Carriage of materials : head load 500 m ( Qty vide item number 4) | 73.95 | cum | 698.68 | ₹51,667.39 |
| 2Providing and Laying of crate wire structures at Kondbal N 34. 235176E 74.681655 | |||||
| 2.1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by E.I.C: all kinds of soil: | 18.1 | cum | 592.9 | ₹10,731.49 |
| 2.2 | Supply of crate wire mesh (4 " x4 ") incl carriage upto site of work | 238 | sqm | 250 | ₹59,500 |
| 2.3 | Handpacking stones in wire crates excluding cost of crates and stones | 61.63 | cum | 371.15 | ₹22,873.97 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1103413.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .