| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ABDUL SHUKOOR P H L1 |
|---|---|---|---|---|
| 1.00DEMOLISHING | ||||
| 1.01 | 15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 9.88 | cum | 3,600 ₹35,571.6 Lowest |
| 1.02 | 15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge. | 2.5 | sqm | 1,150 ₹2,875 Lowest |
| 1.03 | OD Providing, mixing and applying bonding coat of approved adhesive on chippedportion of RCC as per specifications and direction of Engineer-In-chargecomplete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2kg cement per sqm of surface area mixed with specified proportion of approvedpolymer.(Based on 26.31.1) | 2.5 | sqm | 450 ₹1,125 Lowest |
| 1.04 | OD Providing, mixing and applying SBR polymer (of approved make) modifiedCement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand withpolymer minimum 2% by wt. of cement used) as per specifications anddirections of Engineer-in-charge.Note: Measurement and payment: The premeasurement of thickness shall bedone just after the surface preparation is completed and Payment under thisitem shall be made only after proper wet curing has been done and surfacehas been satisfactorily evaluated by sounding / tapping with a blunt metalinstrument and/or the 75mm size cube crushing strength at the end of 28 daysto be not less than 30 N/Sqmm2).50 mm average thickness in 3 layers.(Based on 26.32.3) | 2.5 | sqm | 400 ₹1,000 Lowest |
| 1.05 | 15.60 Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 9.88 | cum | 275 ₹2,717.55 Lowest |
| 1.06 | 15.23.1 Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 29.75 | sqm | 75 ₹2,231.25 Lowest |
| 1.07 | 14.72 Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done | 162.5 | sqm | 345 ₹56,062.5 Lowest |
| 1.08 | od209285/2024_2025 Engaging labour for petty repair works.coolie (for cleaning works) | 8 | nos | 1,050 ₹8,400 Lowest |
Tender Value
₹1.1 L
EMD Value
₹2,900
Closing Date
12 Nov 2025, 6:00 pmClosed
Assistant Executive Engineer
GCDA OFFICE KADAVANTHRA
Demolishing work of damaged carporch at eastern entry
2025_GCDA_818618_1
E1/7510/2025/GCDA
Open Tender
Civil Works - Buildings
Item Rate
60 days
EASTRN ENTRY SOUTH RAILWAY
Please refer Tender documents.
7 documents required · 7 mandatory
₹550
₹2,900
31 Dec 2025
4 Nov 2025
14 Nov 2025
4 Nov 2025
12 Nov 2025
4 Nov 2025
Amount
DEMOLISHING
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
OD Providing, mixing and applying bonding coat of approved adhesive on chippedportion of RCC as per specifications and direction of Engineer-In-chargecomplete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2kg cement per sqm of surface area mixed with specified proportion of approvedpolymer.(Based on 26.31.1)
OD Providing, mixing and applying SBR polymer (of approved make) modifiedCement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand withpolymer minimum 2% by wt. of cement used) as per specifications anddirections of Engineer-in-charge.Note: Measurement and payment: The premeasurement of thickness shall bedone just after the surface preparation is completed and Payment under thisitem shall be made only after proper wet curing has been done and surfacehas been satisfactorily evaluated by sounding / tapping with a blunt metalinstrument and/or the 75mm size cube crushing strength at the end of 28 daysto be not less than 30 N/Sqmm2).50 mm average thickness in 3 layers.(Based on 26.32.3)
15.60 Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
15.23.1 Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
14.72 Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done
od209285/2024_2025 Engaging labour for petty repair works.coolie (for cleaning works)
Bidder Name
ABDUL SHUKOOR P H
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1372053.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.91 MB
affidavit.pdf
Tender Documents • 0.11 MB
biddocuments.pdf
Tender Documents • 1.88 MB
epayFinal.pdf
Tender Documents • 0.06 MB
preliminaryagreement.pdf
Tender Documents • 0.12 MB
IntegrityPact.pdf
Additional Documents • 0.10 MB
BOQ_1372053.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .