Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L Quoted ₹2.5 L | L1 | Accepted-AOC Due to lowest rate |
| 2 | L2₹2.6 LRejected-Finance | ₹2.6 L | L2 | Rejected-Finance Due to highest rate |
| 3 | L3₹2.7 LRejected-Finance | ₹2.7 L | L3 | Rejected-Finance Due to highest rate |
| Sl No | Description | Qty | Unit | Vakil Singh Govt Contractor L1 | AJAY SINGH RANA L2 | RANJIT SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearance of silt, sand, pabbles, wet Malwa etc. from the eixsiting kuhal including pumping of water, slush, boulders, slit & debries including disposal of silt/ weet malwa upto alead of 20 mtrs, as per direction of Engineer-in-Charge complete within all leads and lifts. | 37.74 | Cum | 350 ₹13,209 | 350 ₹13,209 | 400 ₹15,096 |
| 2.00 | Demolition above G.L upto floor two level including stacking of servicable material and disposal of unservicable material within 20 meter leads and including cutting the necessary reinforcement and seperating from R.C.C work/R.B/ Stone Work as per entire satisfaciton of the Engineer - in - Charge. | 7.62 | Cum | 600 ₹4,572 | 800 ₹6,096 | 800 ₹6,096 |
| 3.00 | Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering,strutting and propping etc. with wooden batten and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for insitu work in:-Vertical surfaces such as walls(any thickness)bartitions and the like i/c attached,pillasters plinth and string courses and the like within all leads and lifts. | 87.92 | sqmt | 350 ₹30,772 | 400 ₹35,168 | 400 ₹35,168 |
| 3.01 | Flat surface such as soffits of suspended floors,roofs,landing and the like floors etc. upto 200mm in thickness. Within all leads and lifts. | 24.64 | Sqmt. | 350 ₹8,624 | 350 ₹8,624 | 350 ₹8,624 |
| 4.00Providing and laying cement concrete 1:1.5:3 (1 cement :1.5: Sand : 3 graded stone aggregate 20 mm nominal size and curing complete excluding cost of form work. & rein forcement for reinforces concrete work in :- | ||||||
| 4.01 | Foundation , footing, bases of columns and the like & mass concrete within all leads and lifts. | 2.28 | Cum | 8,500 ₹19,380 | 8,700 ₹19,836 | 8,700 ₹19,836 |
| 4.02 | Wall ( any thickness but not less than 0.10 mts. Thickness) attached pillasters, buttresses plinth & string courses etc. from top of found.level upto floor two level within all leads and lifts. | 7 | Cum | 8,500 ₹59,500 | 8,900 ₹62,300 | 9,000 ₹63,000 |
| 4.03 | Suspended floors roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor level within all leads and lifts. | 2.99 | Cum | 8,700 ₹26,013 | 8,900 ₹26,611 | 9,000 ₹26,910 |
| 5.00 | Providing tor /mild steel reinforcement for RCC work i/c bending,binding and placing in position complete upto floor two level within all leads and lifts. | 582.49 | Kg. | 98 ₹57,084.02 | 98 ₹57,084.02 | 98 ₹57,084.02 |
| 6.00 | Providing in RCC work smooth finishing of the exposed surface with cement mortar 1:3 (1 cement : 3 sand) within all leads and lifts. | 87.9 | Sqm | 110 ₹9,669 | 110 ₹9,669 | 110 ₹9,669 |
Tender Value
₹2.1 L
EMD Value
₹4,272
Closing Date
4 Oct 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Shahpur
Repair of existing leakage tank in village Puhara).
2025_HPIPH_115629_1
EE/JSDS/NIT/2025-5204-53 dated- 23/09/2025
Open Tender
Civil Works
90 days
Shahpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Executive Engineer
₹4,272
10 Mar 2026
23 Sept 2025
4 Oct 2025
23 Sept 2025
4 Oct 2025
23 Sept 2025
23 Sept 2025 - 4 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid