Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹49.4 LAccepted-AOC BBMB SUNDERNAGAR HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172101 | ₹49.4 L | L-1 | Accepted-AOC work order |
| 2 | L-2₹55.2 L+₹5.8 L (11.8%)Rejected-Finance | ₹55.2 L+₹5.8 L (11.8%) | L-2 | Rejected-Finance being L-2 |
| 3 | L-3₹59.1 L+₹9.7 L (19.7%)Rejected-Finance | ₹59.1 L+₹9.7 L (19.7%) | L-3 | Rejected-Finance being L-3 |
| Sl No | Description | Qty | Unit | AKSHAY KUMAR L2 | SHIV KUMAR L1 | LEKH RAJ L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 57.7 | Cum. | 320 ₹18,464 | 350 ₹20,195 | 250 ₹14,425 Lowest |
| 2.00 | Dismantling of 8" thick H.B. Masonry in 1:5 cement Mortar in super structure | 24.48 | Cum | 550 ₹13,464 | 500 ₹12,240 | 450 ₹11,016 Lowest |
| 3.00 | Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by manual means | 20.9 | Cum | 4,250 ₹88,825 | 4,200 ₹87,780 Lowest | 4,800 ₹1,00,320 |
| 4.00 | Squared rubble masonry coursed (coursed rubble) in foundations and plinth in Cement mortar 1:4 | 16.85 | Cum | 6,600 ₹1,11,210 | 6,500 ₹1,09,525 | 6,200 ₹1,04,470 Lowest |
| 5.00 | Plum cement concrete 1:5:10 with stone ballast 40mm gauge using 20 percent plum | 6.35 | Cum | 3,900 ₹24,765 Lowest | 4,000 ₹25,400 | 4,600 ₹29,210 |
| 6.00 | ASHLAR MASONRY Fine ashlar in cement mortar (1:3) upto 6 meters above plinth level | 51.98 | Cum | 24,500 ₹12,73,510 | 24,000 ₹12,47,520 Lowest | 24,000 ₹12,47,520 Lowest |
| 7.00 | Plain cement concrete 1:8:16 with stone ballast 40mm guage using 20% plum | 6.7 | Cum | 3,600 ₹24,120 | 3,500 ₹23,450 Lowest | 4,500 ₹30,150 |
| 8.00 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 28.27 | Cum | 6,500 ₹1,83,755 | 6,300 ₹1,78,101 Lowest | 6,400 ₹1,80,928 |
| 9.00 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcment centring and shuttering in superstructure. | 12.66 | Cum | 6,650 ₹84,189 | 6,600 ₹83,556 Lowest | 7,200 ₹91,152 |
| 10.00 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) | 142.28 | Sqm | 870 ₹1,23,783.6 | 850 ₹1,20,938 | 600 ₹85,368 Lowest |
Tender Value
₹47.1 L
EMD Value
₹94,110
Closing Date
19 Jan 2026, 3:30 pmClosed
Sr. Executive Engineer
Township Division BBMB Sundernagar
Design and construction of main gate/entrance with exclusive wooden craftsmanship and installation of garden light in VVIP Rest House and Field Hostel in BBMB Colony, Sundernagar.
2025_BBMB_259556_1
NIT-13-25-26-TShipSnr
Open Tender
Civil Works
Tender cum Auction
270 days
Sundernagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹94,110
17 Jul 2026
18 Dec 2025
20 Jan 2026
18 Dec 2025
19 Jan 2026
18 Dec 2025
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Dismantling of 8" thick H.B. Masonry in 1:5 cement Mortar in super structure
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by manual means
Squared rubble masonry coursed (coursed rubble) in foundations and plinth in Cement mortar 1:4
Plum cement concrete 1:5:10 with stone ballast 40mm gauge using 20 percent plum
ASHLAR MASONRY Fine ashlar in cement mortar (1:3) upto 6 meters above plinth level
Plain cement concrete 1:8:16 with stone ballast 40mm guage using 20% plum
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcment centring and shuttering in superstructure.
Centering and shuttering for columns (Square or rectangular or poly gonal in plain)
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008), for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Kail wood wrought planed and fixed in position CSR 17.2 Where jointing is involved as in case of roof trusses composite beams etc (As per clause (v) of CHAPTER NO. 17 WOOD WORK of Punjab CSR 2020 FOURTH EDITION, The rate for item No. 17.1 to 17.6 apply to simple wood work not involving any jointing such as beams/ battens etc. Where jointing is involved as in case of roof trusses composite beams etc., increase the labour and through rate by Rs. 3600/- per cum. In case of built -in-fixtures involving jointing increase the rates by Rs. 2400/- per cum)
Teak wood wrought planed and fixed in position CSR 17.5 Where jointing is involved as in case of built -in-fixtures involving jointing (As per clause (v) of CHAPTER NO. 17 WOOD WORK of Punjab CSR 2020 FOURTH EDITION, The rate for item No. 17.1 to 17.6 apply to simple wood work not involving any jointing such as beams/ battens etc. Where jointing is involved as in case of roof trusses composite beams etc., increase the labour and through rate by Rs. 3600/- per cum. In case of built -in-fixtures involving jointing increase the rates by Rs. 2400/- per cum)
Slate roofing with lap double layer fixed on wooden batten (wood work to be paid for separately) size 30cmx15cm
Providing and fixing ridges and hips in fibre cement reinforced by organic fibres and/or inorganic synthetic fibres roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc. complete(c) Unserrated adjustable hips
Providing and fixing asbestos cement semi-corrugated sheet eaves filler piece in position etc complete
Detailed wood carvings on high-quality teak wood, with specific patterns such as floral designs, geometric motifs or nature inspired elements. The teak used must be of premium quality, free of defects such as cracks or knots and should be inspected before carving. The carving work should be done with specialized tools to achieve precise and detailed designs with no rough edges or inconsistencies in depth. The wood must be carefully sanded to remove tool marks and the final surface should be treated with a protective finish like teak oil or varnish to enhance the wood’s natural beauty and durability. Quality control is a priority, with regular checks to ensure the carvings match the approved design.
Varnishing with copal varnish one coat of sizing and two coats of varnishing on wood work including stopping a) With superior quality paint
Steel work in built up tubular pipes (round, square or rectangular hollow tubes etc. ISI Marked) for flat shed (ie. Where no truss work is involved) including cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
Steel work fixed independently without connecting plates including cutting hoisting and fixing in position Tees angles & channels
Applying priming coat with metal primer on new steel or iron work including preparation of surface.
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade.
Providing and laying, jointing, fixing and testing ISI Marked uPVC Pipe Lines as per ISI 4985-2000, including specials such as tees, bends, sockets, elbow etc., cutting, testing (including cost of specials) in the ground complete in all respects. uPVC Pipe 10 Kgf/cm2 25mm i/d
Supply and erection of Double Walled Corrugated (DWC) HDPE pipe to be laid 1mtr. below ground level including excavation placing the pipe in position and back filling with excavated soil etc. of the required size:- Double Walled Corrugated HDPE Pipe 50/38mm (Outer/ Inner dia.)
Providing and fixing All Weather PVC Multi core Copper Wires 1.5 MM x 3 Core with (ISI Mark)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
TechnicalTermsandcondition.pdf
Tender Documents • 0.06 MB
Generaltermsandcondition.pdf
Tender Documents • 0.11 MB
BOQ_300001.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .