Loading…
Loading…
Tender Value
₹7.0 L
EMD Value
₹13,940
Closing Date
31 Jul 2026, 3:00 pm5d left
Executive Engineer,P.W.Div-IV,AMC
O/O the Executive Engineer,P.W.Div-IV,AM
Construction of Boundary wall infront of 1st quater building Southern side of Harizon colony under ward no 23, AMC
2026_SAMC_74927_1
DNIET-30/Div-IV/AMC/2026-27
Open Tender
Civil Works
Percentage
60 days
under ward no-23, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹13,940
Yes
23 Jul 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work in/cl stacking of serviceable materials and disposal of unseviceable materials with all lifts and upto a lead of 50m etc complete as per direction of the Engineer-in-charge. Incement morter | 1 | cum | 1,145.4 | ₹1,144.25 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | - | cum | 231.6 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | 1,177.3 | ₹1,176.12 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: -1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 9,938.6 | - |
| 5 | First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).` | - | cum | 9,845.2 | - |
| 6 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 1 | sqm | 1,533.5 | ₹1,531.97 |
| 7 | 12 mm cement plaster of mix : In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) | 1 | sqm | 224.2 | ₹223.98 |
| 8 | 12 mm cement plaster of mix : In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) with neat cement punning. | - | sqm | 281 | - |
| 9 | 15 mm cement plaster of mix : in cement mortar 1 : 4 ( 1 cement : 4 fine sand ) | - | sqm | 260.6 | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work up to plinth level 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 12,073.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_76274.xls
BOQ • 0.31 MB
DNIET30.pdf
Tender Documents • 2.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].