Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 CrAccepted-AOC CHANDMARI HAZARAPAR TEZPUR DIST SONITPUR ASSAM PIN 784001 | TEZPUR | SONITPUR | ASSAM | 784001 | L1 | Accepted-AOC Work Order Issued | |
| 2 | L2₹13.2 Cr+₹30.7 L (2.38%)Rejected-AOC 4TH FLOOR MONAL TOWER NEAR SBI DISPUR DISPUR GUWAHATI 781006 ASSAM | KAMRUP METRO | ASSAM | 781006 | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.2 Cr+₹31.6 L (2.44%)Rejected-AOC 3RD FLOOR HARIHAR ENCLAVE CHRISTAN BASTI GS ROAD KAMRUP ASSAM 781005 | KAMRUP | KAMRUP METRO | ASSAM | 781005 | L3 | Rejected-AOC L3 | |
| 4 | L4₹13.8 Cr+₹87.3 L (6.75%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹15.3 Cr+₹2.4 Cr (18.4%)Rejected-AOC 14 GOLE MARKET MODEL TOWN PANIPAT | PANIPAT | PANIPAT | HARYANA | 132103 | L5 | Rejected-AOC L5 |
Tender Value
₹13.9 Cr
EMD Value
₹27.9 L
Closing Date
16 Sept 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE, PWD (Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
Implementation of Building Projects for Expansion of Existing Building under EWS Scheme at Tezpur University
2022_PWBNH_26756_1
CE/TB-VI/70/2022/05 Dated Guwahati 22nd Aug 2022
Open Tender
Civil Works - Building
Item Rate
545 days
Tezpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
₹27.9 L
Yes
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
12 Jan 2023
26 Aug 2022
17 Sept 2022
26 Aug 2022
16 Sept 2022
1 Sept 2022
31 Aug 2022
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) :
400 mm dia piles | 1,647 | Metre | - | - |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 91.99 | cum | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 221.65 | Cum | - | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. | 531.79 | Cum | - | - |
| 5 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre includ-ing drilling and plugging holes etc.:
With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration | 130 | Metre | - | - |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12mm diameter holes and plugging with cement mortar 1 :2(1 cement : 2 Coarse sand) to match the existing floor:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 839.28 | Sqm | - | - |
| 7 | 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 33.75 | Cum | - | - |
| 8 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) | 32.5 | Sqm | - | - |
| 9 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominalsize) over 75mm thick bed of dry brick ballast 40 mm nominal size,well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 78 | Sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete | 240.19 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_41286.xls
BOQ Document • 0.36 MB
104113935.pdf
Tender Document • 0.03 MB
FOB.pdf
Tender Document • 0.10 MB
SBDEWSTezpurUniversity.pdf
Tender Document • 0.69 MB
104113937.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .