Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAdmitted-Finance D NO 35 14 13 1 R P PETA KANCHARAPALEM VISAKHAPATNAM 530 008 | VISAKHAPATANAM | ANDHRA PRADESH | 530008 | L1 | Admitted-Finance | |
| 2 | L2₹32.5 L+₹2.2 L (7.33%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹37.7 L+₹7.4 L (24.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹40.6 L+₹10.3 L (34.2%)Admitted-Finance D NO 65 6 500 2 MULAGADA COLONY HIMACHALNAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L4 | Admitted-Finance | |
| 5 | L5₹43.5 L+₹13.3 L (43.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI SIDDHI VINAYAKA ENTERPRISES L3 | COOL CONTROL L5 | M/S CHANDRA ENGINEERS AND CONTRACTORS L1 | SAI ENGINEERING WORKS L2 | ANAND ENTERPRISES AND ENGINEERS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00NOTES / INSTRUCTIONS FOR STRICT COMPLIANCE :- (a) The contractor shall obtain sample approval for all materials incorporating in the work as per condition 10 of IAFW-2249 and Special Condition 11 of tender document mentioned here-in-after. (b) The Engineer-in-charge may direct the contractor in writing to procure and deposit up to 50% quantity of the material with in 30 days from the date of commencment as required at site out of quantity to complete the scope of work. Remaining 50% shall be procured as per site requirement during progress of work.The decision shall be final and binding on the contractor. (c) The contractor shall deposit the procured material to the store of concerned subdivision within 30 days from the receipt of written direction. Failing which contractor shall liable to pay a penal recovery of Rs. 5000/- per week, levied on the dues of contractor, subject to maximum up to 10% of the work done/CA Amount whichever is higher. (d)The contractor shall obtain approval of “Qualified Tradesman” as per condition 26 of IAFW-2249 before commencement of work at site and shall have sufficient manpower such as Electrician / FGM / Technician etc., readily available to meet the site requirement during emergency situation as per directions of Engineer-in-Charge. (e) The quoted rates shall be inclusive of cost of necessary Tools, Plants, Safety Equipments, Machinery etc., as per site requirement. | ||||||||
| 2.00 | M & L for de-scaling the shells and tubes of condenser units of 3 x 140TR Central AC plant by circulating the diluted hydrochloric acid at the appropriate ratio depending upon the scale deposits till removal of all the scale inside the copper tubes after removal of both the end covers, brushing with nylon/GI wire brush, removal of all scale deposits and degreasing with caustic soda, flushing out thoroughly, re-fixing the end covers with new gasket packing, nut and bolts and connecting the inlet and out let, every six month or as directed by engr-in-charge all as specified and directed. | 6 | Each Job | 7,000 ₹42,000 Lowest | 9,500 ₹57,000 | 10,200 ₹61,200 | 10,000 ₹60,000 | 9,100 ₹54,600 |
| 3.00 | All as per Sl Item No. 2.00 here in before but for 3 x 100 TR Central AC plant | 4 | Each Job | 6,000 ₹24,000 | 8,000 ₹32,000 | 9,500 ₹38,000 | 5,000 ₹20,000 Lowest | 7,200 ₹28,800 |
| 4.00 | All as per Sl Item No. 2.00 here in before but for 3 x 49 TR Central AC plant | 6 | Each Job | 4,000 ₹24,000 Lowest | 5,000 ₹30,000 | 6,000 ₹36,000 | 4,000 ₹24,000 Lowest | 5,100 ₹30,600 |
| 5.00 | M&L for servicing and cleaning of air handling unit of 48800 CFM capacity (central AC), with and including dismantling filter units, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, checking of electrical connection, cleaning of air filters, greasing of blower motor, replacement of un serviceable bearings, cleaning water drain lines, renewal of rusted sheet metal screws, every month for running AC plant at optimal condition unit all as specified and as directed by Engineer-in-Charge.
Note : There are 03 No's of 48800CFM capacity AHU and servicing of each AHU shall measured as "Each Job" | 27 | Each Job | 8,000 ₹2,16,000 | 3,000 ₹81,000 | 3,000 ₹81,000 | 2,500 ₹67,500 Lowest | 4,100 ₹1,10,700 |
| 6.00 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 35324 CFM capacity | 9 | Each Job | 7,000 ₹63,000 | 2,000 ₹18,000 Lowest | 2,800 ₹25,200 | 2,000 ₹18,000 Lowest | 3,300 ₹29,700 |
| 7.00 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 35142 CFM capacity | 9 | Each Job | 7,000 ₹63,000 | 2,000 ₹18,000 Lowest | 2,600 ₹23,400 | 2,000 ₹18,000 Lowest | 3,300 ₹29,700 |
| 8.00 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 34400 CFM capacity | 9 | Each Job | 6,500 ₹58,500 | 2,000 ₹18,000 Lowest | 2,500 ₹22,500 | 2,500 ₹22,500 | 2,400 ₹21,600 |
| 9.00 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 23000 CFM capacity | 9 | Each Job | 6,200 ₹55,800 | 1,800 ₹16,200 Lowest | 2,300 ₹20,700 | 2,300 ₹20,700 | 2,530 ₹22,770 |
| 10.00 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 17050 CFM capacity | 9 | Each Job | 6,000 ₹54,000 | 1,800 ₹16,200 Lowest | 2,000 ₹18,000 | 2,000 ₹18,000 | 6,200 ₹55,800 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
29 Sept 2026, 6:00 pmClosed
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIR / MAINT OF CENTRAL AC PLANTS/ PACKAGE AC UNITS AT MWC, TPW UNDER AGE E/M NO-III OF GE (U-I) VISAKHAPATNAM
2026_MES_785185_1
8908/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
As per NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer Utility-I
₹96,000
Yes
1 Oct 2026
19 Aug 2026
1 Oct 2026
19 Aug 2026
29 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | M & L for de-scaling the shells and tubes of condenser units of 3 x 140TR Central AC plant by circulating the diluted hydrochloric acid at the appropriate ratio depending upon the scale deposits till removal of all the scale inside the copper tubes after removal of both the end covers, brushing with nylon/GI wire brush, removal of all scale deposits and degreasing with caustic soda, flushing out thoroughly, re-fixing the end covers with new gasket packing, nut and bolts and connecting the inlet and out let, every six month or as directed by engr-in-charge all as specified and directed. | 6 | Each Job | - | - |
| 3 | All as per Sl Item No. 2.00 here in before but for 3 x 100 TR Central AC plant | 4 | Each Job | - | - |
| 4 | All as per Sl Item No. 2.00 here in before but for 3 x 49 TR Central AC plant | 6 | Each Job | - | - |
| 5 | M&L for servicing and cleaning of air handling unit of 48800 CFM capacity (central AC), with and including dismantling filter units, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, checking of electrical connection, cleaning of air filters, greasing of blower motor, replacement of un serviceable bearings, cleaning water drain lines, renewal of rusted sheet metal screws, every month for running AC plant at optimal condition unit all as specified and as directed by Engineer-in-Charge.
Note : There are 03 No's of 48800CFM capacity AHU and servicing of each AHU shall measured as "Each Job" | 27 | Each Job | - | - |
| 6 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 35324 CFM capacity | 9 | Each Job | - | - |
| 7 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 35142 CFM capacity | 9 | Each Job | - | - |
| 8 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 34400 CFM capacity | 9 | Each Job | - | - |
| 9 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 23000 CFM capacity | 9 | Each Job | - | - |
| 10 | All as per Sl Item No. 5.00 here in before but 01 No of Air handling unit of 17050 CFM capacity | 9 | Each Job | - | - |
| 11 | M&L for complete servicing of FRP cooling tower, removal of complete scales, dirt etc. by using chemicals, cleaning the sump louvers, PVC fills, fan assembly, renewal of spray nozzles, renewal of nuts and bolts, and complete painting of the cooling tower as per standard practice for 3 x 140 TR capacity cooling tower for every three months complete all as specified and directed. | 3 | Each Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
8908Tender.pdf
Tender Documents • 0.81 MB
BOQ_879819.xls
BOQ • 0.69 MB
8908Amdt2.pdf
PDF • 0.26 MB
8908Amdt2.pdf
PDF • 0.26 MB
amdt1.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .