Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.5 LAccepted-AOC 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹8.0 L+₹20,000 (2.56%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹8 L+₹20,100 (2.58%)Rejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | 3 | Rejected-Finance 3 |
Tender Value
₹6.6 L
EMD Value
₹13,150
Closing Date
21 Oct 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Chamlog in Tehsil Sadar District Bilaspur (SH Operation for pumping machinery under JSV Section Panjgain for one year).
2024_HPIPH_94109_1
BLP-BLP-00736 NIT No. 10966-11065 dated 09/10/2024
Open Tender
Civil Works
Item Rate
365 days
Sub Division Bilaspur Section Panjgain
Please refer Tender documents.
8 documents required · 8 mandatory
₹250
Yes
EE JSV Bilaspur
₹13,150
Yes
10 Feb 2025
10 Oct 2024
21 Oct 2024
10 Oct 2024
21 Oct 2024
10 Oct 2024
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Chamlog whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 2 Nos pump house, Main storage tank 1Nos, Rising main: Phase 1st: 50mm dia=2120 Rmt, 2nd phase: 65mm dia=1480Rmt Distribution system: 37Km Pumping machinery: Booster stage: 2x3=6 HP, 1st phase: 2x40=80 HP 2nd phase 2x15=30HP. No of storage tanks: 1 Nos, Total working hours 27 per day : through , 5 Nos persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 250000 ). Pumping hours per day ( 15 ) and energy consumptoin per day Unit.
vishal thakur govt contractor
Manoj Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .