| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹45.4 L+₹2.0 L (4.55%)Rejected-Finance | L2 | Rejected-Finance Second lowest |
Tender Value
₹39.5 L
EMD Value
₹50,000
Closing Date
27 Feb 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer PWD Roads Division Thiruvananthapuram
Nedumangadu Roads Section One Year Running Contract RC 2 2023-24 Cluster 2 Phase 1- Zone 7-4 road stretches for a length of 12.55 km
2024_PWD_661456_1
PWD/RB/TR/14814/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Thiruvananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
16 Mar 2024
20 Feb 2024
29 Feb 2024
20 Feb 2024
27 Feb 2024
20 Feb 2024
Amount
Appendix-A: Initial rectification[Reactive Maintenance]
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD102732/2023-2024:Close graded premix surfacing / Mixed Seal Surfacing -Providing, laying and rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen using VG 30 to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 22kg/10m2) by manual means.
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
Appendix B : Pre-Monsoon Works
OD102722/2023-2024:Engaging daily labour for engaging petty works
OD102723/2023-2024:Engaging wood cutter of trees and removal of fell down trees and branches etc. complete
OD102724/2023-2024:Hire Charges for wood cutting equipment's , pulleys etc.
OD102725/2023-2024:Clearing chocked up side drain by manual means and depositing the waste material for a minimum distance of 5Km lorry conveyance as per clause 305. etc complete.
OD102726/2023-2024:Engaging earth movers like JCB for cutting excess earth and other debris in Tipper and clearing culvert , drain etc.
OD102727/2023-2024:Tipper for removal of all debris, branches and waste materials away from the site.
OD102728/2023-2024:Lifting the existing pre-cast R.C.C covering slabs from drain and culvert for removal of silt and placing the same slab on position after completion of clearing work including all labour charges and miscellaneous expenses etc. complete
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Appendix-C : Proactive/Preventive Maintenance
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
OD102729/2023-2024:Filling up potholes with bituminous ready mix compound(25kg bag) and compacting by ramming to get a compact surface including of cost of materials, laying charges,transportation to site etc. complete.Rate is arrived for a bag of 25kg
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD102730/2023-2024:Close graded premix surfacing / Mixed Seal Surfacing -Providing, laying and rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen using VG 30 to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 22kg/10m2) by manual means.
Appendix D: Emergency Works
OD236305/2023-2024:Removing the old existing vinyl sticker works on the Display board of Running Contract and replacing with new vinyl sticker, including lettering , symbols and transporting to site etc as per approved drawing and directions of the engineer
RAMU RADHAKRISHNAN
Bidder Name
J SHAJI
RAMU RADHAKRISHNAN
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1024753.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .