| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹26.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹28.4 L+₹1.7 L (6.34%)Admitted-Fee/PreQual/Technical/Finance | ₹28.4 L+₹1.7 L (6.34%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹29.6 L+₹2.9 L (10.9%)Admitted-Fee/PreQual/Technical/Finance KUNZER KUNZER TANGMARG BARAMULLA JAMMU KASHMIR 193401 | BUDGAM | JAMMU AND KASHMIR | 193401 | ₹29.6 L+₹2.9 L (10.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹30.5 L+₹3.8 L (14.2%)Admitted-Fee/PreQual/Technical/Finance | ₹30.5 L+₹3.8 L (14.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹30.7 L+₹4.1 L (15.3%)Admitted-Fee/PreQual/Technical/Finance 211 KRALPORA BUDGAM JAMMU KASHMIR 191113 UDYAM JK 04 0011111 | BUDGAM | JAMMU AND KASHMIR | 191113 | ₹30.7 L+₹4.1 L (15.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | GULMARG ELECTRICALS AND SUPPLIERS L2 | M/S BHAT ELECTRICAL & ELECTRONICS L3 | M/S BILAL ELECTRICALS L6 | peerzada electricals L13 | M.I ENTERPRISES L8 | TRUE CONSTRUCTIONS L9 | JUNAID ELECTRICAL AND ELECTRONICS L15 | AFTAB ELECTRONICS L12 | KHAN AND SONS L11 | DAR ELECTRICALS L14 | m/s rahmiya electricals L7 | WAZA ELECTRICALS L10 | sun rise valley electrical co L4 | M/S SOFI SONS L1 | M/S WANI ELECTRA & SUPPLIERS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply,Carraige upto site, Installation, testing and Commissioning of 250 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Copper wound , and with LV Cable Box having detachable Aluminium Gland plate | 1 | No. | 10,50,000 ₹10,50,000 | 7,20,000 ₹7,20,000 | 7,85,900 ₹7,85,900 | 9,00,000 ₹9,00,000 | 7,70,000 ₹7,70,000 | 8,30,000 ₹8,30,000 | 4,03,700 ₹4,03,700 Lowest | 4,03,700 ₹4,03,700 Lowest | 7,80,000 ₹7,80,000 | 9,92,000 ₹9,92,000 | 9,65,000 ₹9,65,000 | 8,00,000 ₹8,00,000 | 7,10,000 ₹7,10,000 | 7,56,000 ₹7,56,000 | 10,00,000 ₹10,00,000 |
| 2.00 | Supply , Transportation and errection of 9MTR long ST Poles (410 SP-33) completely errected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) | 19 | No. | 18,000 ₹3,42,000 | 21,000 ₹3,99,000 | 24,500 ₹4,65,500 | 20,000 ₹3,80,000 | 15,000 ₹2,85,000 Lowest | 24,000 ₹4,56,000 | 20,000 ₹3,80,000 | 20,000 ₹3,80,000 | 17,000 ₹3,23,000 | 20,000 ₹3,80,000 | 20,000 ₹3,80,000 | 19,000 ₹3,61,000 | 20,000 ₹3,80,000 | 20,000 ₹3,80,000 | 15,000 ₹2,85,000 Lowest |
| 3.00 | Supply, Transportation and errection of 8MTR long ST Poles (410-SP 15) completely erected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit . (as per REC standard) | 1 | No. | 14,000 ₹14,000 | 12,000 ₹12,000 | 15,000 ₹15,000 | 11,000 ₹11,000 | 10,500 ₹10,500 | 12,500 ₹12,500 | 16,500 ₹16,500 | 16,500 ₹16,500 | 12,000 ₹12,000 | 11,000 ₹11,000 | 14,000 ₹14,000 | 14,000 ₹14,000 | 13,000 ₹13,000 | 14,500 ₹14,500 | 5,000 ₹5,000 Lowest |
| 4.00 | Earthing of 250 Kva substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | 1,000 ₹3,000 Lowest | 3,000 ₹9,000 | 3,500 ₹10,500 | 10,000 ₹30,000 | 2,000 ₹6,000 | 8,000 ₹24,000 | 3,000 ₹9,000 | 3,000 ₹9,000 | 4,500 ₹13,500 | 10,000 ₹30,000 | 2,500 ₹7,500 | 1,500 ₹4,500 | 3,500 ₹10,500 | 3,000 ₹9,000 | 2,000 ₹6,000 |
| 5.00 | Earthing of 100/63 Kva substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | 1,000 ₹3,000 Lowest | 2,000 ₹6,000 | 3,500 ₹10,500 | 9,000 ₹27,000 | 2,000 ₹6,000 | 8,000 ₹24,000 | 3,000 ₹9,000 | 3,000 ₹9,000 | 2,500 ₹7,500 | 9,000 ₹27,000 | 1,500 ₹4,500 | 1,500 ₹4,500 | 2,200 ₹6,600 | 3,000 ₹9,000 | 2,000 ₹6,000 |
| 6.00 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.48 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 9 MTR ST Pole | 19 | No. | 1,500 ₹28,500 | 1,900 ₹36,100 | 5,500 ₹1,04,500 | 2,000 ₹38,000 | 2,500 ₹47,500 | 2,500 ₹47,500 | 5,000 ₹95,000 | 5,000 ₹95,000 | 1,500 ₹28,500 | 1,900 ₹36,100 | 4,500 ₹85,500 | 1,200 ₹22,800 Lowest | 1,800 ₹34,200 | 2,800 ₹53,200 | 1,400 ₹26,600 |
| 7.00 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/pole (Pit 600x600x1433.3 mm) for 8 MTR ST Pole | 1 | No. | 1,500 ₹1,500 | 900 ₹900 | 3,500 ₹3,500 | 2,000 ₹2,000 | 2,000 ₹2,000 | 2,100 ₹2,100 | 5,000 ₹5,000 | 5,000 ₹5,000 | 1,500 ₹1,500 | 2,000 ₹2,000 | 4,500 ₹4,500 | 1,200 ₹1,200 | 400 ₹400 Lowest | 2,800 ₹2,800 | 1,000 ₹1,000 |
| 8.00 | Supply, transportation and fixing of GI Channel /Angle Iron for Cross Arms, Braces, Transformer Belt, F-Top, Collers etc for Sub Station and poles (Complete Job including Nuts & Bolts and Washers) | 900 | Kgs | 135 ₹1,21,500 | 90 ₹81,000 Lowest | 185 ₹1,66,500 | 200 ₹1,80,000 | 105 ₹94,500 | 145 ₹1,30,500 | 130 ₹1,17,000 | 130 ₹1,17,000 | 135 ₹1,21,500 | 190 ₹1,71,000 | 150 ₹1,35,000 | 115 ₹1,03,500 | 100 ₹90,000 | 100 ₹90,000 | 96 ₹86,400 |
| 9.00 | Supply and fixing of 300 mm Sq Single Phase 1.1 KV Grade , PVC Insulated stranded conductor FRLS Type including Aluminum Thimbles, PG/SL Clamps etc. as per REC standard | 50 | Mtr | 950 ₹47,500 | 800 ₹40,000 | 699 ₹34,950 | 1,500 ₹75,000 | 600 ₹30,000 | 600 ₹30,000 | 1,200 ₹60,000 | 1,200 ₹60,000 | 420 ₹21,000 | 1,400 ₹70,000 | 800 ₹40,000 | 600 ₹30,000 | 900 ₹45,000 | 550 ₹27,500 | 298 ₹14,900 Lowest |
| 10.00 | Supply, Carriage up to site, Installation, testing and Commissioning of 185 Sqmm Single core cable, 1.1KV grade,XLPE unarmoured FRLS type | 44 | Mtr | 450 ₹19,800 | 200 ₹8,800 Lowest | 499 ₹21,956 | 800 ₹35,200 | 300 ₹13,200 | 450 ₹19,800 | 500 ₹22,000 | 500 ₹22,000 | 380 ₹16,720 | 800 ₹35,200 | 600 ₹26,400 | 400 ₹17,600 | 290 ₹12,760 | 355 ₹15,620 | 281 ₹12,364 |
Tender Value
₹48.5 L
EMD Value
₹96,920
Closing Date
3 Aug 2026, 2:00 pmClosed
Assistant executive Engineer KPDCL Tangmarg
KPDCL Tangmarg
Upgradation of Electric transformer from 63 Kva to 250 Kva and shifting of existing 63 Kva Transformer to newly constructed staff quarters and underground electrification thereof at GDC Tangmarg
2026_PDD_318035_1
E-NIT No.SSDT/05 of 2026-27 dated 03.07.2026
Open Tender
Electrical Works
Turn-key
GDC Tangmarg
Please refer Tender documents.
4 documents required · 4 mandatory
₹795
Treasury Officer
₹96,920
10 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
3 Aug 2026
28 Jul 2026
27 Jul 2026 - 28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply,Carraige upto site, Installation, testing and Commissioning of 250 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Copper wound , and with LV Cable Box having detachable Aluminium Gland plate | 1 | No. | - | - |
| 2 | Supply , Transportation and errection of 9MTR long ST Poles (410 SP-33) completely errected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) | 19 | No. | - | - |
| 3 | Supply, Transportation and errection of 8MTR long ST Poles (410-SP 15) completely erected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit . (as per REC standard) | 1 | No. | - | - |
| 4 | Earthing of 250 Kva substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | - | - |
| 5 | Earthing of 100/63 Kva substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | - | - |
| 6 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.48 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 9 MTR ST Pole | 19 | No. | - | - |
| 7 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/pole (Pit 600x600x1433.3 mm) for 8 MTR ST Pole | 1 | No. | - | - |
| 8 | Supply, transportation and fixing of GI Channel /Angle Iron for Cross Arms, Braces, Transformer Belt, F-Top, Collers etc for Sub Station and poles (Complete Job including Nuts & Bolts and Washers) | 900 | Kgs | - | - |
| 9 | Supply and fixing of 300 mm Sq Single Phase 1.1 KV Grade , PVC Insulated stranded conductor FRLS Type including Aluminum Thimbles, PG/SL Clamps etc. as per REC standard | 50 | Mtr | - | - |
| 10 | Supply, Carriage up to site, Installation, testing and Commissioning of 185 Sqmm Single core cable, 1.1KV grade,XLPE unarmoured FRLS type | 44 | Mtr | - | - |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_1045580.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .