| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.9 L+₹2.9 L (25.9%)Rejected-Finance E I HOUSE ERTHUMKADAVU MUTATHODY POST KASARAGOD 671121 | KASARAGOD | KASARAGOD | KERALA | 671121 | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-License validity expired on 31.03.2026 | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance CHENGALA PADINHARMOOLA HOUSE KUNDADUKKAM PIN 671541 | KUNDADUKKAM | KASARAGOD | KERALA | 671541 | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Contractor's license not uploaded |
| Sl No | Description | Qty | Unit | E I MUHAMMED L2 | AHAMMED KABEER B L1 |
|---|---|---|---|---|---|
| 1.00APPENDIX-A : Demolishing | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.1 | cum | 3,796.28 ₹375.83 | 3,015.95 ₹298.58 Lowest |
| 1.00 | 15.10.1:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In lime mortar | 1.32 | cum | 1,565.43 ₹2,066.37 | 1,243.48 ₹1,641.39 Lowest |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 218.09 | sqm | 78.44 ₹17,107.37 | 62.31 ₹13,589.5 Lowest |
| 1.00 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 5.68 | cum | 284.37 ₹1,615.79 | 225.91 ₹1,283.62 Lowest |
| 2.00APPENDIX - B: Toilet repair | |||||
| 2.00 | OD23431/2026-2027:Laterate masonry with neatly dressed laterate stone of size 30x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 1.37 | cum | 7,621.81 ₹10,472.37 | 6,055.14 ₹8,319.76 Lowest |
| 2.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.22 | cum | 13,897.48 ₹3,043.55 | 11,040.85 ₹2,417.95 Lowest |
| 2.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1.27 | sqm | 788.73 ₹1,001.69 | 626.61 ₹795.79 Lowest |
| 2.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.9 | cum | 8,859.4 ₹16,824 | 7,038.35 ₹13,365.83 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,628
Closing Date
17 Jun 2026, 4:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PWD BUILDINGS SUB DIVISION KANHANGAD
GENERAL-Govt Polytechnic College Periya Kasaragod - Toilet repair work in Main block- Toilet repair work -General Civil Work
2026_PWD_855173_1
PWD/BLDG/TR/21175/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
PERIYA
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹31,628
Yes
28 Jul 2026
10 Jun 2026
20 Jun 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX-A : Demolishing | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.002 | 15.10.1:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In lime mortar | - | cum | - | - |
| 1.003 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 1 | sqm | - | - |
| 1.004 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | - | cum | - | - |
| 2APPENDIX - B: Toilet repair | |||||
| 2.001 | OD23431/2026-2027:Laterate masonry with neatly dressed laterate stone of size 30x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | - | cum | - | - |
| 2.002 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 2.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 2.004 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1445283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd_merged-10.pdf
Tender Documents • 1.67 MB
BOQ_1445283.xls
BOQ • 0.34 MB
epay.pdf
Tender Documents • 0.18 MB
preliminary.pdf
Tender Documents • 0.25 MB
certificates.pdf
Tender Documents • 0.10 MB
licenseandgst.pdf
Tender Documents • 0.08 MB
FOT.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .