Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC ok |
| Sl No | Description | Qty | Unit | BIJU SKARIA L1 |
|---|---|---|---|---|
| 1.00WELL RENOVATION | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 12.13 | cum | 215 ₹2,608.6 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 70.65 | cum | 107 ₹7,559.55 Lowest |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.33 | cum | 7,413 ₹17,250.05 Lowest |
| 1.00 | 50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete | 0.95 | cum | 7,850 ₹7,496.75 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.34 | cum | 8,642 ₹2,955.56 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 7.07 | sqm | 316 ₹2,232.54 Lowest |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 128 | hour | 286 ₹36,608 Lowest |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 11.38 | kg | 169 ₹1,922.88 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 29.07 | kilogram | 98.92 ₹2,875.6 Lowest |
Tender Value
₹1.5 L
EMD Value
₹3,700
Closing Date
15 Mar 2024, 6:00 pmClosed
Assistant Engineer,LID and EW Office section Mutti
Assistant Engineer,LID and EW Office section Muttil
436-well repair near babu house ward 8
2024_LSGD_667296_1
AE/LIDEW/MTL/436/2024
Open Tender
Civil Works - Others
Item Rate
150 days
Assistant Engineer, LID and EW Office section Mutti
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,700
Yes
15 Oct 2026
6 Mar 2024
16 Mar 2024
6 Mar 2024
15 Mar 2024
6 Mar 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1036974.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .