Loading…
Loading…
Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
15 Apr 2026, 6:00 pmClosed
Ahmedabad Municipal Corporation Central Zone
Const. R.C.C. Road at Old Jamalpur area diff. Places under M.P., M.L.A., Muni.Counsillor and Other Budget in Jamalpur Ward. (ARC)
294179
CENTRAL ZONE E-Tender Notice No.17/2025-2026 Tender No.544
Open
Civil Works - Others
Ahmedabad
₹3,600
Municipal Commissioner, Ahmedabad
₹2.6 L
6 Apr 2026
6 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
Name of work: -bæg Ítullt Ntnvwh Jtuzobtk œw^uµh rJm<th, swlt Ntnvwh rJM<th <&t bnuœefwJt rJM<thbtk btl mkmœmÇg©e,
DthtmÇg©e, ftWLmejh©e îtht Vt¤Juj csux <ubs yLg csuxbtk&e yth.me.me. htuz <ubs vuJh çjtuf ftbdehe
fhtJJt ctc<.(yu.yth.me)
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 2 of
AhmedabadMunicipalCorporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate sealed tenders from
interested contractors for the following work at different locations within the limit of A.M.C.
1 Name of work bæg Ítullt Ntnvwh Jtuzobtk œw^uµh rJm<th, swlt Ntnvwh rJM<th <&t bnuœefwJt rJM<thbtk
btl mkmœmÇg©e, DthtmÇg©e, ftWLmejh©e îtht Vt¤Juj csux <ubs yLg csuxbtk&e
yth.me.me. htuz <ubs vuJh çjtuf ftbdehe fhtJJt ctc<.(yu.yth.me)
2 Estimated Tender Amount Rs. 2,59,14,334.00 (excluding of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.3600.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 18 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be down
Documents loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “B” class having in Road Works in PWD in Govt. R&B / CPWD /
AMC or equivalent register with any other state Govt. or institutions.
7 Earnest Money Deposit Rs.2,49,143.00 (Demand Draft / pay order / Bank Guarantee in favour
(Bid security) of Municipal Commissioner, Ahmedabad is to be submitted as
(1 % of Estimate put to prescribed as below. Demand Draft/Bank Guarantee shall be from
approved list of AMC of banks and the issuing branch of bank
guarantee shall be of Ahmedabad city only and it should be valid for
for 180 days. ( As
Per AMC finance Dept . Circular No. 5 Dt. 5/5/2007 & F.D.
Circular No. 29 Dt. 7/8/2010 & attched ANNEXURE - 1 finance
dept.circular No-40 Dt.05/11/2020. E.M.D. shall be submitted
physically along with the Physical Submission when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be
submitted to Assistant Manager- Central Zone, 3rd Floor, B – Wing,
Sardar Patel Bhavan, Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as
non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on www.nprocure.com
website as per Schedule mentioned in Notice inviting
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
two copies (Original & duplicate) in sealed envelope as per
Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.
Tenders. The tenders received after latest schedule date and time will not
be entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
mentioning quoted rated, else it shall be considered as rejected.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular.
and the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
18 GST condition This rate shall be without GST. As Per New slab GST 18% Deputy paid
when finally estimate approval. as per circular no.38 Dt.21.11.2022
• All the circulars which were published by Authorities of AMC time by time will be applicable on said Tender and
bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to reject any
or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case authorized
signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered non-
Seal and Signature of the Bidder Add City Engineer
Date: Ahmedabad Municipal Corporation
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Add City Engineer
Ahmedabad Municipal Corporation,
Name of Work:- bæg Ítullt Ntnvwh Jtuzobtk œw^uµh rJm<th, swlt Ntnvwh rJM<th <&t bnuœefwJt rJM<thbtk btl mkmœmÇg©e, DthtmÇg©e, ftWLmejh©e
îtht Vt¤Juj csux <ubs yLg csuxbtk&e yth.me.me. htuz <ubs vuJh çjtuf ftbdehe fhtJJt ctc<.(yu.yth.me
I/We the undersigned have carefully gone through and clearly understood the Tender documents of above
mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work, Definition of terms,
notes Instructions/Information to Bidder, Condition of Contract, special condition of contract, Appendices,
Specifications, Bill of Quantities, furnished by AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in accordance
with the specification, designs, drawing and instruction in writing referred to in the said document and with such
materials as mentioned for, at the respective rates which I/we have quoted in the Price Bid or at such other rates as may
be fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required, execute
the contract, according to your form 1 of agreement as or in default where of I/we bound myself/ourselves to forfeit the
"Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC from the
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take necessary action as
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as
mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to commence the work
specified. Otherwise the Employer shall retain the said sum, as on account of such Security Deposit as provided for in the
aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance with conditions
in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which are
received. I / We also understand & agree that Municipal Commissioner Reserves the right to allot number of tenders to
successful bidders at his sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of opening of
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the tender terms
and conditions. I am also bound to submit all supporting Genuine Original documents as and when asked and if any
discrepancy found in such documents as well as in the executed Work with respect to Quality/Quantity at any stage of
work or even after completion of work, it will be solely my Responsibility. I am bound to prove originality of all
documents submitted by me and if any Documents found false/fake then Municipal Commissioner/AMC has right to
take any action/penalty/punishment against me.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or the
construction of road is found to be of an inferior quality under this contract than in such case Municipal
Commissioner/AMC has right to debar/ blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties, Royalty on
material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items on which the
same are leviable and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal Corporation (referred to
as Employer in these documents) invites sealed bids for the construction of works (as defined in these
documents and referred to as “the work”) detailed in the table given in the Invitation for Bid (hereinafter called
as IFB.) from competent bidder. The bidders may submit bids for the works detailed in the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the Clause-14. An agency that
has been engaged by the Employer to provide consulting services for the preparation or supervision of the
works, and any of its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms those are blacklisted/
debarred for specified period by AMC, Governement of Gujarat, Government of India or any other entity
controlled by it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register as per Notice Inviting Tender having in Road Works in PWD in Govt. R&B /
CPWD / AMC or equivalent register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to be disqualified if they
• Made misleading or false representations in the forms, statements, affidavits and attachments submitted in
proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing the contract, inordinate
delays in completion, litigation history, or financial failures etc. or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the purpose of restricting
• Indulged in inducement of any official of AMC and/or their consulting engineer and other advisors in any
manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened before the due
date of opening.
• The E.M.D. is not deposited in full and in the manner as specified in the clause of Earnest Money
• The tender is in a language other than English or dose not contains its English Translation in case of
other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid. Employer will in no
case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize himself with
the site of Works and its surroundings including source of earth, water, road aggregates etc. and obtain all
information that may be necessary for preparing the Bid and entering into a contract for construction of the
Works. The costs of visiting the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total amount of
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total amount of
work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/ requirements. No claim shall be
entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle and no claim shall be
entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract data, forms, terms,
technical specifications, forms, Annexes in the bid document. Failure to comply with the requirements of bid
documents shall be at the bidder’s own risk. Bids which are not substantially responsive to the requirements of
the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by issuing
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on website
www.nprocure.com The prospective bidder shall refer to website to check any addendum before 24 hours of
opening of bids. AMC will not give any advertisement for the same.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
10.3 To give prospective bidders reasonable time in which to take an addendum into account in preparing their bids,
the Employer may, at his desecration, extend as necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also the changes
made through such addendum shall be applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these Instructions to
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and other marked as
“Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the date of physical submission of bid and
addressed to the addressee given in the NIT duly super scribed “Name of Work, Bid due date and time, Name
and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the percentage rate in the Bill
of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any other cause shall be
included in the rates, prices and total Bid Price submitted by the Bidder, except otherwise stated in the Bid
document. Employer will not compensate the bidder (contractor) for any change in duties, taxes and other
levies payable by the contractor under the contract and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of Work and shall
not be subject to adjustment on any account, except where expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for a shorter period shall
be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer may request that the
bidders may extend the period of validity for a specified Deputy period. The request and the bidders' responses
shall be made in writing or by cable. A bidder may refuse the request without forfeiting his bid security. A bidder
agreeing to the request will not be required or permitted to modify his bid, but will be required to extend the
validity of his bid security for a period of the extension.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part of his bid, in the form
of Demand Draft / pay order / Bank Guarantee in favour of Municipal Commissioner, Ahmedabad valid for
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only.
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as promptly as
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be returned when
the successful bidder has furnished the required security deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed the Agreement and
furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the bank guarantee shall
be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers of requisite value
in accordance with the stamp Act applicable to that particular state of Indian Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly indicate in (block
letters) his name, designation, Power of Attorney No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed by the executing
officers and the last page shall be signed in full, indicating the particulars as aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate envelopes and the three
sealed envelopes shall be sealed in an outer envelope. The Bid envelopes shall be marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as “Technical Bid” and sealed. This
Outer envelope should mention the name of firm of bidder, his address, contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by the Employer at the
address specified in bid information not later than the date indicated on the face sheet of the document. In the
event of the specified date for the submission of bids declared a holiday for the Employer, the Bids will be
received up to the appointed time on the next working day. The Bidder is further required to submit Documents
in Physical Form on or before the Bid Due Date and before the time of submission as specified in NIT, at the
following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure e-tendering portal on
account of delay in submission at bidder's end. Bidder shall ensure that they submit the bid well before the "Due
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Date & Time of Bid- Submission". AMC shall not be responsible if bidder is not able to submit the bid on account
of failure in network/internet connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in accordance with
respective Clause, in which case all rights and obligations of the Employer and the bidders previously subject to
the original deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and returned unopened
Any Bid received by the Employer after the deadline prescribed in NIT will be returned unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to expiration of the
Bid validity period by writing, facsimile or e-mail confirmed by registered letter. This letter (hereinafter and in
the Conditions of Contract called the “Letter of Acceptance” will state the sum that the Employer will pay the
Contractor in consideration of the execution, completion, and maintenance of the Works by the Contractor as
prescribed by the Contract (hereinafter and in the Contract called the “Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to the furnishing of a
Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the Successful Bidder. It will be
signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within 28 days after the
successful bidder (hereinafter called the Contractor) receives the Letter of Acceptance, unless they agree
otherwise, subject to furnishing the security deposit before signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly notify the other
Bidders that their Bids have been unsuccessful and release their Earnest Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to the Employer a
security deposit in the form of Bank Guarantee for an amount equivalent to 5% of the Contract Price valid for
the period of valid till 90 days beyond Date of completion of work. The Security Deposit shall be payable in
days (for tenders upto Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above)from date of receipt of
LOA failing which interest @ 4% per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the Employer, from Ahmedabad
branch of any Banks mentioned in the clause no. 16.2 of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre & post Audit.
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of security deposit or
late renewal of bank guarantee for the number of days delayed for submission or discontinuity of the bank
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same verbatim as per the
format. Bank Guarantee shall be submitted on right value of stamp paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall constitute sufficient
grounds for cancellation of the award and forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing value of the contract the BG
value shall be enhanced accordingly. Validity of BG shall be commercial terms and conditions of the tender.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
22.7 All compensation or other sums of money payable by the Contractor to the Employer under the terms of this
Contract or any other contract or on any other account whatsoever may be deducted from Security Deposit.
Also in the event of the Contractor's Security Deposit being reduced by reasons of such deductions, as aforesaid,
the Contractor shall, within 14 days of receipt of notice of demand from the Engineer-in-Charge, make good the
deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of validities of Bank Guarantees as
may have been furnished by the Contractor from time to time, are required to be extended/renewed, the
Contractor shall get the validity periods of such guarantees extended/renewed, and furnish these to the
Engineer-in- Charge one month before the expiry date of the aforesaid Guarantees originally furnished failing
which the existing Bank Guarantees shall be invoked by the Engineer – in – charge. Also in case of any deficit in
securities on any account as might occur or is noticed, the Contractor shall forthwith recoup/replace the same
with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per contract are not
completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor after 45 days of
completion date / Final Bill paid date which ever is later. No interest on the amount of Security Deposit shall be
paid to the Contractor at the time of release of Security Deposit as stated above.
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at Employer’s office within
15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be final and binding to the
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting from Contractors
completed or under execution by him over last five years. If the details of Litigation History are hidden by the
Bidder and later on it comes to the knowledge of the Employer, the Bidder shall be disqualified for the proposed
work and other appropriate actions shall be taken against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same shall be treat as null
A consistent history of arbitration awards? Judgments against the applicants or any partner of a joint venture
may result in disqualification for proposed work.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
If the details of litigation History is hidden by the applicant and later on it comes to knowledge of the employer
the bidder shall be disqualified for the proposed work and other appropriate actions shall be taken against the
Seal and Signature of the Bidder Add City Engineer
Date: Ahmedabad Municipal Corporation
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit, the Contractor shall pay
penalty of 10% of amount of actual remaining work. The amount of work for which the scope of contractor is
reduced shall not be considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date: 23/05/2017 and all latest
Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention money shall be
released in the final bill of the said work. AMC reserves right to deduct any amount to compensate the poor
performance of the contractor i.e. poor quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any portion of Work
without the approval of the Employer’s Representative. Any subcontracting shall not relieve the Contractor from
any contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the name of the
subcontractor and scope of works activities to be performed by him is already stated in the contract or supply of
material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred to in the Bid
document to carry out the functions stated in the Schedule or other personnel approved by the Engineer. The
Engineer will approve any proposed replacement of key personnel only if their qualifications, abilities, and
relevant experience are substantially equal to or better than those of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for his misconduct or
inadequacy of technical skills and experience, who is a member of the Contractor’s staff or his work force, the
Contractor shall ensure that the person leaves the Site within seven days and has no further connection with the
work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected on the site of
work and contractor shall make his own arrangements to provide such accommodations as per the rules of the
local bodies. He shall make his own arrangements for housing, stores, field office etc. He shall submit a site
layout plan indicating the location of various site facilities to be created by him at his cost for the execution of
work. The Owner shall in no way be responsible for any delay on this account and no claim on this account
whatsoever shall be entertained. All Basic amenities shall be provided by the Contractor to Labours as per the
prevailing labour Laws.
5.1 The Contractor shall have full regard throughout execution, completion and defects liability period to following
safety aspects and shall take all necessary steps to ensure that danger to safety is avoided all the time in respect
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly engaged by him for the
• Safety of all the employees including persons working on other contracts of Employer at the same site of
the Employer and Engineers employees engaged at work site.
• Any authorized third party persons on the site.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs, barricading, and
cones; when and where necessary, or required by Engineer in Charge or by any duly constituted authority for
the protection of the works or for the safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the site and avoid damage
or nuisance to persons or property of the public and others arising as a consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution, completion, and defects liability
period. The contractor shall be responsible for and to make good all injuries, damages and repairs, rendered
necessary by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the contractor.
Nothing extra shall be payable on this account. It shall be provided strictly with double scaffolding system with
all the accessories etc. with adjustable suitable working platforms to access the areas, with ease for working and
inspection. It shall be designed to take all incidental loads. It should cater to the safety features for workmen. It
shall be ensured that no damage is caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed during day as well as night time
by the contractor, wherever required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection required, by him, shall be made by
the Contractor at his own cost and also necessary permissions directly from relevant Owners shall be obtained
by him under intimation to the Owner. Also all initial and running charges and security deposit, if any in this
regard shall be borne by him. The Contractor shall abide by all the rules/ bye laws applicable in this regard and
he shall be solely responsible for any penalty on account of violation of any of the rules and byelaws in this
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions, the same shall be
completely contractor’s responsibility. All the losses due to such accidents and expenses of legal matters shall be
borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete installation and shall
also be responsible for any pilferage, theft, damage, penalty etc. in this regard. The Contractor shall indemnify
the Owner against any claim arising out of pilferage / theft, damage, penalty etc. whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary protective and
safety equipments shall be provided to them by the Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage rubbish, excess
materials, temporary works no longer required will be removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials, rubbish, temporary
works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction, installation, testing, and
commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be paid only quantities
calculated after taking measurements of executed work. The rate stated in the schedule B for each item of
work shall apply. The works shall be measured by the Contractor jointly with the authorized representative
of the Engineer and all particulars required by the representative of the Engineer shall be supplied by the
c. The work shall be measured net. No allowance for general or local custom, working space etc. is to be made.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
9.1 The Engineer in Charge shall have power to make any variation of form, quality or quantity of the works or any
part thereof that may, in his opinion, be necessary and for that purpose, or if for any other reason it shall, in his
opinion, be appropriate, he shall have the authority to instruct the Contractor to do and the Contractor shall do
any of the following:
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute Deputy work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all such variations
shall be valued in accordance with the following sub clauses. Provided that where the issue of an instruction to
vary the Works is necessitated by some default or breach of contract by contractor or for which he is
responsible, any Deputy cost attributable to such default shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the Engineer. No instruction is
required for quantities varying from those provided for the items in the contract schedule B.
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as follows in the same order of
a) Variations in the quantities of work in schedule of quantities shall not vitiate the contract.
b) The contractor shall be bound to execute extra items of work as directed by the Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where there is a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the Contractor and he
shall be paid at the rate fixed by Employer which shall be fixed as lowest of the rates derived by rate analysis
based on the following three methods. , the priority of the documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-14, the rate of extra
item shall be that rate and premium (above or below) quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and equipment, the cost of all
temporary and incidental works, the overheads and the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the cost of use of all
plant, machinery, and equipment, the cost of all temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall be taken at 10 % of
the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are, in his opinion
appropriate and shall notify the Contractor accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account payments to be included in the
Interim Payment Certificates, until rates and prices are agreed as final by the Employer, the Contractor, and the
10.6 The Contractor shall not be entitled to Deputy payment for costs, which could have been avoided by giving early
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
11.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms of the
contract and taxes at source, as applicable under the law. The Employer shall pay the Contractor the amounts
certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in previous certificates or as a
result of an award from disputes review experts, Contractor shall be paid such amount only. The Contractor shall
not be paid any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by the Employer and shall
be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local Governing bodies
prevailing on the date of award of the contract. The Contractor will have to pay all such taxes and duties for the
performance of this Contract. The Employer will deduct from the Contractor’s monthly and other payments all
taxes and duties, which he is bound to recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State and local Governing
bodies, all orders, decrees of bodies, tribunals having any jurisdiction or authority which in any manner affect
those engaged or employed, and anything related to carrying out the work. All the bye-laws lay down by
AMC/AUDA and any other local bodies while executing the work shall be adhered to. All taxes of local bodies
shall be borne by the contractor. The Contractor shall arrange to give all notices required by any authority and to
pay to such authority all the fees that may have to be paid for the material, plants, equipments etc. The
Contractor shall also adhere to all traffic restrictions notified by the local authorities. He shall protect and
indemnify the Owner and its officials & employees against any claim or liability arising out of violations of any
such laws, ordinances, orders, decree, whether by himself or by his employees or his authorized representatives.
Nothing extra shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-1831-M(3) dt.
9/12/05 issued by G.O.G. (non-refundable) shall be deducted from every bills which shall be deposited to Govt.
Labour Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end
of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or
damage arises from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and the Engineer will
do so upon deciding that the Work is completed.
18.0 Termination
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid after receipt by him of a
Notice to this effect from the Engineer/Employer after signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received notice
3. Has failed to comply with a notice issued or an instruction issued within 28 days after having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to continue performance of his
obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written permission of the
6. Has failed to furnish the required securities or extension thereof in terms of the contract.
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made
against him, compounds with his creditors, or carries on business under receive, trustee or manager for
the benefit of his creditors, or if any act is done or event occurs which (under applicable Laws) has a
similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to the contractor,
terminate the contract and expel the contractor from the site. However, in the case of sub-paragraphs (h), the
Employer may be notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of the Employer, under
the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other entities to do so. The
Employer and these entities may then use any goods, contractor’s documents and other design documents
made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a fundamental breach of
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the current Program and the
stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than for a reconstruction or
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of Contract and
the Contractor fails to correct it within a reasonable period of time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which the maximum amount
of liquidated damages becomes payable as defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent practices in
competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or soliciting of
anything of value to influence the action of a public official in the procurement process or in contract
execution. “Fraudulent practice” means a misrepresentation of facts in order to influence a procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive practice
among Bidders (prior to or after bid submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause other than
those listed above, the Engineer shall decide whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and secure and
leave the Site as soon as reasonably possible and handover the site to the Employer including all materials and
plant and equipment existing there upon.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of the same. He shall also
be responsible for the correctness of the positions, levels, dimensions, and alignment of all parts of the structures
as per instructions given to him. If at any time any error shall appear during the progress of any part of the work
the contractor shall at his own expense rectify such error if called upon to the satisfaction of the Engineer in
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of or under this Contrac
against the contractor the same may be deducted by the Municipal Corporation from any sum then due or which
at any time thereafter may become due to the contractor under this contract and failing that under any other
contract with the Municipal Corporation or from any sum due to the contractor with the Municipal Corporation
(which may be available with Municipal Corporation), or from his retention money, or he shall pay the claim on
demand. The Municipal Corporation reserves the right to carry out post payment audit and technical examination
of the final bill including all supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over payment when detected
notwithstanding the fact that the amount of the final bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is discovered in respect of any work done
by the Contractor or alleged to have been done by him under the contract, it shall be recovered by the Municipa
Corporation from the contractor by way of all the means prescribed above or if any under payment is discovered
by the Municipal Corporation, any amount due to the contractor under this contract or under payment may be
adjusted against any amount then due or which may at any time thereafter become due before payment is made
to the contractor from him to the Municipal Corporation on any other contract account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part for reasons other than
on account of bad or imperfect work, the materials obtained from dismantling will be the property of the A.M.C
and will be disposed of as per instruction of Engineer-in-charge in the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters, whether such
disputes arise during the progress of the work or after the completion or abandonment thereof, shall be
referred an independent Arbitrator appointed by AMC as far possible in consultation with the agency if it is
necessary and such disputes shall be settled in accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the works of the site
thereof or belonging to the contractor or procured by him and intended to be used for execution of the
work or any part thereof possession of which may have been taken by the Engineer-in-charge under the
said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items of works not
accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the Deputy or altered work carried
out by the contractor in accordance with the instructions of the Engineer-in-charge under clause 14 and
the rates for which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the contractor
before receipt of notice given by the Engineer-in-charge under clause 15 and/or amount of
compensation payable to the contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in the event of
this failure to rectify, remove or reconstruct the work within the period specified in the written
intimation or the amount of expenses incurred by the Engineer-in-charge under the said clause17 in
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
rectifying, removing or re-executing the work or in removing and replacing the materials or articles
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for the inferior work or
materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates and assessed under
(viii) The amount payable to the contractor for the work carried out under clause 33 in accordance with the
instructions and the requirement of the Engineer-in-charge in case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and calculations to every
item of claims. The decision will have to be implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation approaching on Court
of Law. It shall be within the jurisdiction where the site of work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause 5 to take possession
of all or any tools, plants, materials and stores in or upon the works of site thereof belonging to the contractor
or procured by him and intended to be used for the execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in any work or from
removing such materials to other places, during the period the work is stopped or suspended in pursuance, of
notice given to the contractor under clause
iii) Progress of the work or the carrying out the Deputy or altered work in accordance with the provisions of
clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC. No separate payment
will be made to the contractor for this. . The contractor shall have to submit the same in hard copy as well as
soft copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those permitted under
clause 59.1, shall be taken, or permitted to be taken by the Contractor or by any of his employees or any
employees of his sub-Contractors without the prior approval of the Engineer in writing. No photographs/
videography shall be published or otherwise circulated without the approval of the Engineer in writing.
Seal and Signature of the Bidder Add City Engineer
Date: Ahmedabad Municipal Corporation
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
yb>tJt> BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe >hJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt yb>tJt> BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg gt>elt ftuLx[fxhtu Che
NfNu. dJobuLxlt btLg ftuLx[tfxhu yb>tJt> BGþrl.ftuvtuohuNlbtk btLg ftuLx[tfxhtule gt>ebtk hSMxuNl fhtJJtlwk
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s
ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- yb>tJt> Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc yb>tJt> Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,
heLgwyj Ve <&t yvd{uzuNl Ve ylu btv>kztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkath ylu
JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekd(fu su ftb fhJt,
ftb ÃþY fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu, gtzo,
zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm
(h) yt ftble mbg bgto>t bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle >hufu >huf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt >M<tJus vh< fhJtlt
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt >huf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh >eM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt >uuJtNu lrn
ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk jFtKbtk ftuR Cwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK
fu ytkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk >NtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn ntu g <tu xuLzh ybtLg
dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdo>Nol btxu mtbtLg
rlgbtu ylu mwaltytu vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK >NtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg dKJtbtk ytJNu.
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt
rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu c>ÕGþ / c>Õgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk >huf Ctde>th y&Jt <u ykdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu
y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, h> fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe
hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu
J¤<hltu nff>tJtuu fhe NfNu lrn fu ftg>tfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb
ytve >uJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< >NtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK Cwjawf leault
rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu >hlt Ftltbtk sKtJuj Nç>tu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk Nç>tuubtk sKtJuj hfb
btLg htFJtbtk ytJNu.
(2) yufb >h ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu >NtoJ<e CtJ vºtflt Ftltbtk&e hfbbtk Cwj
sKtg <tu yufb >h btLg htFJtbkt ytJNu ylu >hlt yt^thu dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
(10) y:- ftbltu «tud{um mbgbgto>t bwsc fhJtltu hnuNu. yt mbgbgot>t 10 jtF mw^elt ftb btxu yuj.ytu.ytR.
ytÃgt <theF&e 10 r>Jm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃg <theF&e 15 r>Jm&e NY &guj
dKJtbt ytJNu. <&t <u >hBgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk
ytJNu. ylu <ubtk atjw ftb >hBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.10,00,000.00 (>m jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ct> (LOI)
ytvJtbtk ytJNu ðgth ct> r>l - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze
ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgto>tbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj
«btKu bkswh &guj mbgbgto>t ct>lt FhuFh ctfe ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm)
vulÕxe Jmwj fhJtbtk ytJNu.
z:- yu.yth.me. xuLzhbtk bkswh &guj sw>t sw>t yk>ts vifelt ftbtu Jfo ytuzoh b¤u&e NY fhJtlt hnuNu.
E:- yu.yth.me. xuLzhbtk ftb «btKu yk>ts hfb Bþsc mbgbgto>t dKtNu.
(1) Yt.1,00,000.00 &e 3,00,000.00 Mþ^elt ftbtu btxu 1 btm
(2) Yt.3,00,000.00 &e 5,00,000.00 Mþ^elt ftbtu btxu 2 btm
(3) Yt.5,00,000.00 &e Wvhlt ftbtu btxu 3 btm
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt >h vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF,
ÃjtLx, >uFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykNu <btb Faoltu <&t sYh sKtg <tu
ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu >h fh<t J^thtle ftu R
awfJKe ykdult <ublt ftuR >tJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR
Ôgrf<yu (vAe<u ctk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR
>tJt> hsw fhJt nf>th hnuNu lnek. <ublw xuLzh ChJt <&t <ubtk sw>t sw>t CtJ ylu >h ChJt btxu sYhe yuJe
<btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtk&e WCt &<t ftuR
stuFb fu sJtc>thebtk&e Axfe NfNu lnek. m>h ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ
J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu. <&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt >huf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx + yu¾x[t
ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxhlt
cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e >M<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce:- xuLzhbtk >NtoJuj ftb mkck^e >M<tJusbtk >NtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau >NotJuj ¢btlwmth
>M<tJusbtk >NtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e >M<tJustu fhthlt ydðglt Ctd dKtNu ylu
<u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu f>:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk f>, ytfth, ytkfzt f>ta Ftuxt ntug <tu btvujt f>, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule ltuk^ bwfe yuze.mexe
yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykr<b
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh
Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu
<ule mkvwKo sJtc>the (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb >hBgtl bswhtu fu sl<tlt ftuR
btKmlt òlbtj lu lwfNtl &tg <ule sJtc>the ftuLx[tfxhle hnuNu. vtujem Vrhgt> &tg <tu <ule sJtc>the
vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtc>the vK vtujem Vrhgt>bt ftuLx[tfxhle hnuNu. CuFz Dme
l vzu <u btxu mjtb<elt vdjt (suJt fu >tuhzwk ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd fhJt rJduhu)
je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vrhgt>bt sJtc>th hnuNu ylu Bgwrl.ftuvtuohuNlltu
ftuRvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxjwk mbSlu s xuLzh ChJwk. bswhtultu rJbtu vK W<thJtu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u
ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< r>l 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx <&t
bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftg>tlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su
btne<e btkdJtbtk ytJu <u ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf
ytvJtLþk hnuNu.
(21) ftuRvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtc>the ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt >NtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t
xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe
J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt
CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb >hBgtl «tuxufNlle mkvwKo sJtc>the ftuLx[tfxhle hnuNu. subtk vevzt, >tuhzt Cgmwaf ctuzo,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkvwKo
sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe >hBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt
rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk >hhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe
ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•ttt yuze.mexe
yuLSlehgh©elu hnuNu.
(29) >huf ytRxblt MvuNeVefuNl yb>tJt> Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuN eVefuNl
Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog
ytFhe hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo
ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve juJtbtk ytJNu.
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg >hBgtl ftuLx[tfxh îtht
ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu VhSgt< ytvJtlt
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu jd<tk ftb btk ftuRvK
mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk vtjl
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mh¾gwjh lkk.38, <t.21/11/2022 <&t mûtb m<tle b¤u j
bkkswhe bwsc Syumxe rmJtg dK<hebtkk juJtbt ytJuj <&t «Jo<btl rlgb bwsc Syumxe awfJJt vtºt &Nu.
su ægtlu jR <btb rczomu xuLzhtu ChJtlt hunNu.
(35) mœh xuLzh ykk<od<olt ftb mkkjøl y.Bgw.ftuvtuo.btkk «Jo<btl <btb rlgbtu/mh¾gwjhtu jtdw vzNu, <ubs JF<tu
JF< <h mw^thtytu vK jtdw vzNu. suule ltuk^ jR xuLzhtu ChJtlt hunNu.
(36) mœh xuLzh yu.yth.me. «fthlw Au. ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj ftbdehelt sÚ&t
bwsc mbg bgtoœt lffe fhe yjd&e bkswh &guj ykœtsJtRÍ Jfo ytuzoh ytvJtbtkk ytJNu ylu mbg
bgtoœtbtkk ftbdehe vqKo fhJtlw awM< vKu vtjl fhJtlw hnuNu.
(37) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h xuLzh vife yjd yjd
ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u œN søgtyu sYhegt< bwsc ftbdehe NY
fhJtle Nh<u ylu <u «btKu bulvtJh, bNelhe, bxehegÕm <ubs ltkkKtfeg studJtRle vwh<t «btKbtkk
ÔgJM&t fhe su <u xuLzhhu xuLzh Cgto vqJuo ytdtu<Y ytgtuslle <igthe mt&u ftbdehe fhJtle &tg Au.
(38) y.Bgw.ftu. ltk ltKt Ft<tk îtht RlJzo lk. 4416 <t.20/12/2025 &e b¤uj mwalt bwsc Mxu . frbxe
<t.27/11/2025 ltk mwal «btKu ßgtk 50% hemtgfjucj çjtuf JtvhJtbtk l ytJ<t ntug, <ulwk cej bkswh
fhJtbtk lrnk ytJu. sule ftuLx[t¾xhu Ftm ltuk^ juJe.
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
>M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
Item No. 01: Dismantling of any type of tiles/flooring work including striking of serviceable material and is
of unserviceable materials with all leads and lift.
Demolishing work shall be carried out as per instructions given by the Engineer in charge. Demolishing of stone slab
pavement or any other type of paving, proportion of cement or lime, sorting out materials, carting them up to lead of
mts. & Stacking the different materials separately as directed by the Engineer in charge of work. The work shall be done
The Mode of measurement and rate shall be given as per one square meter basis.
Item No. 02: Excavation for foundation upto 1.5 mt. depth including sorting out stacking of useful material
& disposing of excavated stuff upto 50 mt. lead loose or soft soil.
The land width required for the road way, gutter side slopes and catch water gutters shall be cleared of
all trees having a girth of 30 cms. and less loose, stones, vegetation, bushes, stumps and all other objectionable
materials. The roots of trees and stumps shall be removed to a depth of 30 cms below the grade formation and
slopes and excavation filled up with excavated materials and compacted. All the materials cleared will be the
property of government. Useful materials shall be arranged in convenient stacks along the road boundary or as
directed at places within 50 mts. Lead, and handed over to the department in convenient sections. Unsuitable
material shall be burnt or otherwise disposed off by the contractor at his own cost without causing any
nuisance, inconvenience or damage to the work, property or people in the neighborhood. If the materials are to
be disposed off outside the road land, necessary permission from the private land owners shall be taken by the
contractor and royalty etc. If any paid by him without claiming compensations. In all cases, the materials shall
be disposed off in a neat manner.
1. After clearing the site, the alignment of the road shall be properly set out true to lines, curves slopes, grades and
sections as shown on the plans or directed by the Engineer-in-charge. The contractor shall provide all labour and
materials such as lime, strings, pegs, nails, bamboos, stones mortar, concrete etc. required for setting out
alignment establishing bench marks and giving profiles. The contractor shall be responsible for maintaining the
B. Ms. Profiles alignments and other stakes and marks as long as they are required for the work in the opinion of
the Engineer. If the contractor defaults in this respect even after the direction by the Engineer within the
specified time, they may be restored by the Engineer at the levels etc. if there is any disagreement the
contractor shall inform of it in writing to the officer concerned with the specific reference to the sections before
starting further work. Once the work has started, no cognizance of any complaint shall be taken. Merely not
signing of the book shall not be deemed as disagreement.
2. Profiles of the section including the road side gutters to be excavated shall be laid at suitable intervals of 10 m to
50 m or other intervals as directed by Engineer to conform to the curved or straight alignment, sections, grades
and side slopes. The line out shall be clearly marked and profiles of embankments where excavated materials
are to be used shall be set up with the toe line marked on each side. The road way section shall first be
excavated with vertical side for each lift and the sides slopes for that lift shall be excavated in steps. These steps
shall be smoothened to the required slope when the excavation reaches the road formation. The contractor
shall on no account excavate beyond the slopes or below the specified grade unless so directed by the Engineer
in writing. If excavation is done below the specified level or outside the section, it shall not be paid for and the
contractor shall be required to fill up at his own cost such extra excavation in the road portion, with approved
materials of the embankment grade in layers, watered and fully compacted to attain maximum density laid
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
down for the embankment in its relevant item. The Engineer may require measurement ridges and dead man to
be left at specified intervals or places and kept intact till ordered to be removed for the purpose of check
measurements. The excavation shall be finished neatly, smoothly and evenly to the correct lines, curves, grades
if loose shall be scarified, watered and compacted to the same density as the embankment. The section, side
slopes and catch water gutter shall be maintained by the contractor at his own cost in such a way that the
formation and gutters will be drained by providing for necessary diversions etc, and not damaged due to
obstruction of any drainage. Necessary passage shall be provided for leading away seepage, springs, surface
respect, he shall make good the damage at his own cost. If it is necessary in the execution of the work to
interrupt existing surface drainage, irrigation channels, sewers or under drainage, temporary arrangements shall
be provided till such time as is necessary. The contractor at his own cost shall make the existing works or work in
hand caused as a result of his operations or negligence shall be made good by the contractor at his own cost.
Road side gutters shall be excavated to the specified sections and shall be measured along with the main cutting
in cubic meters.
3. If slides occur in the cutting they shall be removed as ordered by the Engineer. If finished slopes slide into the
roadways before the final acceptance of the work, such slides shall be removed by the contractor and shall be
paid for at the contract rate for the class of excavation involved provided the slides are not due to any
negligence of the contractor. The classification of the materials in slides shall conform to its conditions at the
time of removal and payment made accordingly regardless of its prior condition. Care shall be taken to see that
excavation is arranged in a safe way so that there will be no risk to the workmen by slides, falling materials,
boulders and collapsing sides etc.
4. If there is traffic nearby or if there are towns and villages in the neighborhood, barricades and or traffic signals
shall be provided day and night for the work in such a way as to prevent accidents. Warning signals shall be
displayed at 7 mt. from the danger point on both sides giving sufficient warning. If necessary, signalers shall be
stationed at each end to regulate traffic where it is heavy. Measures shall be taken to see that the excavation
does not affect or damage adjoining structures or property. If there is damage to property, injury to workers, the
members of the public, animals etc., due to the negligence of the contractor, he will be responsible and liable to
all the consequence including compensation.
5. All the excavated materials shall be property of Government. When the useful excavated materials are to be
used in embankment within a lead of 200 meter and all lift, it shall be directly deposited at the required location
in specified layers. No handling or conveyance charges shall be paid if the material is temporarily deposited
elsewhere and subsequently conveyed to site of deposition. The sequence of operations at convenient places,
without interfering with the drainage in any way. If no Government land is available but the excavated useful
stuff is to be stacked temporarily before use under the same agreement, the contractor shall make his own
arrangements for the stacking of this material not required for use on embankment or unsuitable materials may
be used on his own to uniformly widen embankment to flatten slopes and to fill low places in the road land, if so
permitted by the Engineer. Material not required for any use whatsoever may be disposed off by the contractor
within 3m from the top edge of slope or toe of the bank. The lead shall be measured from the junction point of
cutting and embankment up to 200 mt. on either side.
6. If the contractor does not wish to utilize the quantity of cutting within the specified lead for any reason, then he
may do the embankment work with the earth from other sources (except borrow pits in the length of the road
where cutting stuff is to be utilized) but in that case the full or part quantity on acceptable quality stuff for which
payment is made or to be made will be deducted from the net quantity of the earth work in the embankment
arrived at, which the chainage measured as above.
7. The Contract rate shall be a unit of one cubic meter for the start mentioned in the wording of the item of
excavation acceptably completed, limited to the dimensions shown on the plans or as directed by the Engineer.
Excavation shall be measured in its original positions by taking cross sections before the work starts and after it
is entirely completed. The quality shall be worked by the average end area method. When the classification of
the strata changes, the contractor shall bring this to notice of the Engineer, who will then verify and if necessary
take levels for the changed strata for purpose of measurement.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
(b) In Spoil Bank: Specification shall be as per Item 2(a) except that the excavated stuff shall be
deposited in spoil Bank instead of using same in road embankment.
The Mode of measurement and rate shall be given as per one cubic meter basis.
Item No. 03 Conveyance charges of lime, murrum, building, rubbish, manure or sludge and excavated rock
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km. distance
or as directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic finding which in
view of public safety and traffic convenience. The corporation shall carry out the work by any other agency at the
contractor’s risk and cost. If the instructions are not completed within 7 days from the date of order to cart the surplus
materials and clear the site, the said work shall be carried out by the Municipal Corporation at the risk and cost of the
contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be carried out by
the contractor without asking any extra rate. The contractor shall have to cart the surplus earth after the trenches we
will watered and refilled with the sand. The rate of carting including carting of brickbats, metal, rubble vegetable and
garbage, if necessary to clear the road surface.
The Mode of measurement and rate shall be given as per one cubic meter basis..
ITEM NO.04: PROVIDING & LAYING CEMENT CONCRETE 1:4:8 (1 CEMENT : 4 COARSE SAND : 8 HAND BROKEN STONE AGGREGATES
40 MM NOMINAL SIZE) AND CURING COMPLETE EXCLUDING COST OF FORM WORK IN FOUNDATION AND PLINTH
W ATER SHALL CONFORM TO M- L. CEMENT SHALL CONFORM TO M-3. SAND SHALL CONFORM TO M-6. STONE AGGREGATE
40 MM. NOMINAL SIZES SHALL CONFORM TO M-12.
RELEVANT SPECIFICATIONS OF ITEM NO. 15.3.2. SHALL BE FOLLOWED EXCEPT THAT CEMENT CONCRETE SHALL BE MIXED IN THE PROPORTION
OF 1 : 4 : 8 INSTEAD OF 1 : 3 : 6 BY VOLUME.
MODE OF MEASUREMENT AND PAYMENT:
THE CONCRETE SHALL BE MEASURED FOR ITS LENGTH, BREADTH AND DEPTH, LIMITING DIMENSIONS TO THOSE SPECIFIED ON PLANS OR
THE RATE SHALL BE FOR A UNIT OF ONE CUBIC METRE.
Item No. 05 Providing Form Work In Ordinary Timber Planking So As To Give A Rough Finish Including
Centering, Shuttering, Strutting And Propping Etc. Height Of Propping And Centering Below Supporting Floor
To Celling Not Exceeding 4 M & Removal Of The Same For In Situ Reinforced Or Plain Concrete Work In:- (A)
Foundation, Footings, Bases Of Columns Etc. And Mass Concrete..
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not be less than
that assumed in the design.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
The form work shall conform to the shape lines and dimension as shown on the plans and be so constructed as to
remain sufficiently rigid during the placing and compacting of the concrete. Adequate arrangements shall be made by
the contractor to safe guard against any settlement of the form work during the course of concreting and after
concreting. The form work of shuttering, centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form before the
concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treated. The
surface shall be then coated with soap solution applied before concreting is done. Soap solution for the purpose shall be
prepared by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of raw linseed oil or form oil
of approved manufacture may be applied in case steel shuttering is used. Soap solution or raw linseed oil shall be
applied after thoroughly cleaning the surface. Care shall be taken that the coating does not get on construction joint
surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of following periods:
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete surface.
Before the soffits form work and struts are removed, the soffits and the concrete surface shall be exposed where
necessary in order to ascertain that the concrete has sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely of the form
work and concrete work before, during and after pouring concrete. Watch should be kept to see that behavior of
centering and form work is satisfactory during concreting. Erection should also be such that it would allow removal of
forms in proper sequence without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the loads without any
The centering and form work shall be inspected and approved by the Engineer-in-charge before concreting. But this will
not relieve the contractor of his responsibility for strength, adequacy and safety of form work and centering. If there is a
failure of form work or centering, contractor shall be responsible for the damages to the work, injury to life and damage
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be provided and
removed on completion work by contractor at his own expense. The scaffolding, hoisting arrangements and ladders etc.
shall be strong enough to with stand all live, dead and impact loads expected to act and shall be subject to the approval
of the Engineer-in-charge. However, contractor shall be solely responsible for the safety of the scaffolding, hoisting
arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford easy
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost of materials and
labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering propping, bolting,
nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams, columns and
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Before re use all forms shall be inspected by Engineer-in-charge and their suitability ascertained. The forms shall be
scarred, cleaned, and joints gone over, repaired where required. Inside surface shall be retreated to prevent adhesion of
The Mode of measurement and rate shall be given as per one sq. meter basis.
Item No. 06 Providing Thermo Mechanically Treated Bars(TMT Bars) reinforcement for R.C.C. work including
bending, binding and placing in position complete upto floor two level.
The scope of work consists of providing and laying mild steel reinforcement and TMT CRS Fe-500
reinforcement for RCC works of various components of the structure. This may be Tisco or any other approved
manufacturer branch and corrosion resistant steel bars approved by the Engineer Incharge. This includes
cuttings, bending, binding, placing, with all equipments and labour required for the work as directed by the
Engineer In-charge, Ahmedabad and all operations covered within the intent and purpose of the specification.
Being of Reinforcement:
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings and conforming to the
relevant IS codes (latest revision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the Engineer In-charge, AMC
using a proper bar bender, operated by hand or power to attain proper radii of bends.
Bars shall not be bent or straightened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work; they shall not be heated
to facilitate bending.
The bending of the TMT bars shall be carried out as per the following:
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Placing of Reinforcement:
All reinforcing bars shall be accurately placed in the exact position shown on the drawings/as per instructed by
Eng In-charge, and shall be securely held in position during placing of concrete by annealed binding wire not
less than 1 mm in size and conforming to IS:280 and by using stays blocks or metal chairs, spacer, metal
hangers, supporting wires or other approved devices at sufficiently close intervals. Bars will not be allowed to
sag between supports nor displaced during concreting or any other operation over the work. All devices used for
positioning shall be of non-corrodible material. Wooden and metal supports will not extend to the surface of
concrete, except where shown on the drawings, placing bars on layers of freshly laid concrete as the work
progresses for adjusting bar spacing will not be allowed. Pieces of broken stone, brick or wooden blocks shall
not be used. Layers of bars shall be separated by spacer bars, precast mortar blocks or other approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition until completely
embedded in concrete. Special care shall be exercised to prevent any displacement of reinforcement in concrete
already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on the drawings/as per
instructed by Eng In-charge. All bars protruding from concrete to which other bars are to be spliced and which
are likely to be exposed for an indefinite period shall be protected by a thick coat of neat cement grout.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of size not less than 1 mm
and conforming to IS:280 in such a manner that they do not slip over each other at the time of fixing and
concreting. As far as possible, bars of full length shall be used. In case this is not possible, overlapping of bars
shall be done as directed by the Eng In-charge, AMC, Ahmedabad. When practicable, overlapping bars shall not
touch each other, but be kept apart by 25 mm or 1 ¼ times the maximum size of the coarse aggregates
whichever is greater, by concrete between them. Where this is not feasible, overlapping bars shall be bound
with annealed steel wire, not less than [1 mm thickness twisted tight in eight shape around the lapped bars. The
overlaps shall be staggered for different bars and located at fixed locations only along the span where neither
shear nor being moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings/as per instructed by Eng In-charge, joints of
reinforcement bars shall be butt welded so as to transit their full strength. Welded joints shall preferably be
located at points where steel will not be subject to more than 75 percent of the maximum permissible stresses
and welds so staggered that at any one section, not more than 33 per cent of the rods are welded. No –pre-
warning or post heat treatment is necessary. Interpass temperature should be limited to 200º C with low heat
input and equivalent strength low hydrogen type electrode. Suitable means shall be provided for holding the
bars securely in position during welding. It must be ensured that no voids are left in welding and when welding
is done in 2 or 3 stages, previous surface shall be cleaned property. Ends of the bars shall be cleaned of all loose
scale, rust, grease, paint and other foreign matter before welding. Only competent welders shall be employed on
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the actual site and their number
and frequency of tests shall be as directed by Eng In-charge, AMC, Ahmedabad.
The TMT bars shall be tested for any or all of the following tests as directed by the Engineer Incharge
Alternate immersion test
Salt spray test
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Atmospheric exposure test
Sulphur dioxide test
Potentio dynamic test
The Mode of measurement and rate shall be given as per one kilogram basis.
Item No. 07 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost
of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns
and Mass concrete (upto 10 ton)
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS,
The Mode of measurement and rate shall be given as per Cmt. basis
Item No. 08 & 09 Providing & laying in position Ready Mixed concrete for reinforced cement concrete
works,using cement content as per approved design mix manufacture in fully automatic batching plant and
transpoprted to site of work in transit mixer for a lead up to 10 kms. having continuious agigateted
mixer,manufactured as per mix design of specified grade for reinforced cement concrete works including
pumping of R.M.C. from transit mixer to site of laying,exluding the cost of centreing,shuttering,finishing and
reinforcement including the cost of admixture in recommended proportion as per IS 9103 to
accelrate/retard setting of concrete , improve wokability without impepairing strength and durability as per
direction of the engineer in charge without flyash( minimum cement level as per latest IS 456 shall be
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS,
Providingand laying inposition ReadyMixedM250gradeconcreteforreinforcedcementconctere work , using
cement content as per approved Design Mix manufactured in fully automatic batchingplant
andtransportedtositeofwork in transit mixer for a lead up to 10 kms having continuous agitatedmixer,
manufactured as per mixdesignofspecifiedgradeforreinforcedcement concretework includingpumpingof
R.M.C. from transitmixertositeof laying,excludingthecostof centering shuttering finishing and reinforcement
including cost of admixtures in recommended proportions asper IS: 9103 toaccelerate/ retard setting of
concrete, improveworkabilitywithout impairingstrengthanddurabilityasperdirectionof theEngineer- in-
charge.Without FlyAsh (Min cement level as per latest IS 456 shall be maintained) (Cement level 450 kg )
The Mode of measurement and rate shall be given as per Cmt. basis
Item No. 10 P/A Tremix With Dewartering Machine And Floater Machine On Constructed Cc Work For
Finishing The Surface As Per Requirement. The Rate Including All Machinaries, Labor, Loading, Unloading,
Transportaion Etc Complete As Per Direction Given By Engineer In Charge.
The process is equipment oriented. It required formwork in form of channels, internal vibrators, double beam
screed board vibrator for the full width, bull float, filter pads, vacuum pump, skim floater and power trowel.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
All concrete mix design shall meet the requirements of TRIMIX concrete mix design recommendations.
Execution Tremix System
The work shall be planned and executed so that there is no delay between the placement, screeding, dewatering and
floating of the concrete. Concrete to be vacuum dewatered shall be handled and placed so as to prevent segregation.
The concrete shall be internally vibrated prior to screeding.
Immediately following placement, the concrete shall be levelled with a vibrating screeding running on a true surface, set
at the proper elevation required to provide the specified finished elevation. The concrete surface shall be screeded high
by 2% of the slab's thickness to compensation for the compaction caused by the vacuum dewatering process. (Slabs to
have an aggregate hardener shall have compensation made to maintain elevation). The vibrating screed shall be moved
forward as rapidly as proper consolidation allows. The proper surcharge of concrete must be maintained in front of the
leading edge of the screed.
Immediately after levelling, the concrete shall be covered with filter pads and suction mats in strict accordance with the
recommendation of the manufacturer to have the slab fully dewatered. The suction mat shall extend 4 inches beyond
the edge of the filter pad on all sides. The pads shall extend to within 4" of the edge of concrete slab, and the mats shall
cover entire slab. Before connecting the hose on the suction mat to the vacuum pump, the edges of the mat shall be
smoothed to enable an airtight seal to be created. A vacuum shall then be applied to the mat. After a minute the gauge
on the vacuum pump should indicate a minimum vacuum of 0.70 atmospheres (24.0 in. Hg) and if not, the mat must be
checked for leakage. For concrete that dewaters readily the vacuum should then be maintained awt 0.70-0.80
atmospheres (24.0-25.5 in. Hg.) For concrete which dewaters less efficiently (e.g. air-entrained concrete) the vacuum
shall then be reduced to 0.50-0.60 atmospheres (15.0-18.0 in. Hg). After approximately 10 minutes the vacuum can then
be increased to 0.80 atmospheres.
The vacuum shall be maintained for at least 3 minutes per inch of concrete thickness at 0.80 atmospheres. (Where
aggregate hardeners are specified, sufficient moisture shall be maintained to meet manufacturer's requirements). The
suction mats and filter pads shall then be removed and moved to the next section in leapfrog manner.
Stop the vacuum dewatering when light footprints only are left in the concrete when stepped upon.
Floating: Upon removal of the suction mats and filter pads the concrete surface shall be power-floated without delay
until all imprints from the vacuum process are removed. If crusting occurs, the floating operation must be delayed till
the concrete carries the machine.
The higher speed is recommended for the floading operation. Two passes with the floating disc should be made in the
junction of two mats in order to avoid risk for cracking.
The waiting time after the floating operation depends on concrete temperature and humidity and varies from
minutes to 2 hours.
The trowelling operation cannot take place before the concrete has hardened enough to carry the machine, i.e. the
trowelling blades will not leave any marks on the concrete. Repeated trowelling with intervals between the passes,
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
which are adapted to the setting of the concrete, greatly improves the surface characteristics. The surface will be more
wear resistant and less dusty.
Vacuum dewatered concrete should be cured like any other quality concrete in order to achieve good final result with
The Mode of measurement and rate shall be given as per one square meter basis excluding cost of concrete & steel. The
cost of steel & concrete shall be measured & paid separately under relevant items.
ITEM NO.11 FILLING AVAILABLE EXCAVATED EARTH (EXCLUDING ROCK) IN TRENCHES, PLINTH, SIDES OF FOUNDATIONS ETC. IN LAYERS NO
EXCEEDING 20 CM. IN DEPTH CONSOLIDATION EACH DEPOSITED LAYER BY RAMMING AND WATERING .
The Mode of measurement and rate shall be given as per Cmt. basis
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS, SECTION
NO. 4.12, PAGE NO.
Item no-12 & 13 Providing and laying (to level or slopes) and jointing with stiff mixture of Cement Mortar i
proportion 1:1 Salt glazed stoneware pipes including testing of pipes and joints complete.(a)100 mm dia. &
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved quality and make an
shall be brought on site after approval. (The pipes shall be laid in grade as per instruction) contractor shall hav
introduce bills for standard pipes.
The joints shall be done in cement prop. (1 : 1) (1 part cement : 1 part sand) using spun yarn dispend in ho
asphalt and caulking tools. The hydraulic pressured test shall be given be the contractor for testing pipes an
jointing. No. trenches shall be filed without the approval of the Engineer in charge. The rate of the pipes work ar
inclusive of excavation and refilling. The excavation etc. shall be done as follows :
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In a
storts soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall be commenced a
the down stream end of the sewer and be continued upto the gradient as directed. The trench shall not ope
more than 60 meters in advace of the completed sewer only when directed by the Engineer in charge looking to
The progress of the work in obtaining the formation of the bottom of the trenches the usual methods o
suing sight rails and bonning roads shall be adopted during the whole of the process. The center line of uniform
height shall be carried clearly on each rail. The depth of the excavation and invert of the sewer shall be checke
by means of bonning road of appropriate length and also straight edge. The bed of the trench be shall we
remmed before starting laying of sewer lines and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of shortin
work looking to the nature of soil near big or important structures, the sides of the trenchesshall be closely an
securely timbered. If any settlement of the building is anticipated the timbering shall be left in the ground. Th
various materials excavated shall be separately stacked so that in refilling the may be relaid on the same order a
before and least possible damage shall be done carpet on the public roads and private properties. Surfac
covering consisting of asphalt carpet shall be kept on one side and preserved for reinstatement. The excavate
earth shall not heaped near the trenchers so as to caused unnecessary obstruction along the pulling inspection
trenches etc. shall be tunneled under only as necessary. The side of the trenches shall be nearly vertical an
plumb & red light shall be placed at each end at intervals as instructed and further protested by rope fence
Necessary caution boards shall also be erected and diaced as directed by the Engineer in charge.
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Wherever possible material excavated from the trenches of whatever kind shall not placed nearer than
meters from the outer edge of the excavated trench. The utmost shall have to be taken in refilling the trenches s
that no damage may be done no sewer no lump shall be allowed to be put around the sewer. The remming of th
filling shall be done and well watered. The surplus earth shall be removed directed within 30 meters lead. Th
measurement of the work shall be exact length and width of the trench as specified or as per City Enginee
instruction and depth shall be measured vertical as per section upto invert or the pipe lind The City Enginee
reserves the right of extra excavation on either side if considers necessary for the safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directions before an
concrete in India. In case the excavation is done deeper than required no filling shall be allowed to bring th
formation to proper level but contractor shall have to lay cement or lime be concrete of filling or other acceptabl
materials as directed by C.E. at contractor won cost so as to come to proper information, in case bas formatio
are met with the work shall have be done as per instruction of C.E. necessary arrangements for watering trenche
must be provided be contractor and without proper watering trenches will not be allowed to be tilled to furthe
Contractor shall have to makearrangement for acees to invert of the sewer and for inspection of the ware a
ordered by the Engineer. If is required to shired or after the alignment section of diameter of the pip th
contractor shall carry or altered the alignment section or diameter of the pipe the contractor shall carry out th
altered work at the rates quoted by him for the original work for items and contractor shall not claim an
expenses due to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the recess time excep
in and other holiday the case of bad grounds such as running sand where the work must be executed various da
night without intruption when so ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which do not in theopinio
of Engineer required to be charged in location shall be supported and protected from injury by the contractor. Th
contractor shall be liable to pay all damages to water pipe, drains electric and telephone cables and to privat
property during the execution of this contract and the same will be recovered from the running bills or th
deposit of work whenever it becomes necessary in the opinion of the Engineer in charge location of any existin
sewers drains etc. not otherwise from in these specification the contractor shall do the work of making suc
change and the work shall be paid for as extra work. All places of public utility etc. shall be kept accessible for use
No extra payment shall be made for land sides and side slopes done without prior approval of the Engineer i
charge. Wherever natural soil commends winder excavation the mentioned above the same shall be given afte
approved C.E. The rate for excavation for easy jointing and caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the line
are checked and approved of and order given by the Engineer in charge. The refilling shall be accompanied b
through watering the layers of 0.50 metrs. Further refilling shall be done there after and process should b
repeated till trenches are completely refilled. Temping and ramming with rammers shall have to be done at a
place of important work where ordered by Engineer in charge. After the trench is give the trenches shall have t
be refilled within 4 days with complete watering. If the contractor fails to do watering satisfactory corporatio
shall get it done at the risk and cost of the contractor with or without giving any notice and the expenses incurre
in doing so recovered from the contactor either in cost or from his payment through bills.
The Mode of measurement and rate shall be given as per Rmt. basis
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORK
SECTION. NO. 24.1, PAGE NO.
Item no-14 roviding and fixing S.W. gully trap with C.I. grating brick masonry chamber and water tight C.I. cover wit
frame of 300mm x 300mm size (inside) with standard weight.(i) Square mouth traps. (A)100mm x 100mm size
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
(1) Water shall conform to M-1. (2) Cement mortar of proportion 1 : 5 shall conform to to M-11. (3) Burn
brick shall conform to M-15. (4) The S.W. Gulley trap of 100 mm. x 10-0 mm. size shall conform to M-70.
Excavation for gulley trap shall be done true to dimensions and levels as indicated on plans or as directed
The excavation work shall generally be done as per relevant specification of earth work.
The gulley trap shall be fixed over cement concrete 1 : 5 : 10 (1 cement : 5 sand : 10 graded brick bat
aggregate 40 mm. nominal size) foundation, 650 mm. square and 100 mm. thick. The depth of top of concret
below the ground level shall be 675 mm. The jointing of gulley outlet to the branch drain shall be done similar t
jointing of S. W. pipe as described in item No. 24.1 (A).
Brick masonry chamber : After fixing and testing gulley and branch drain, a brick masonry 300 x 300 mm
inside with bricks in C. M. 1 : 5 (1 cement : 5 sand) shall be built be built with a 100 mm. brick work round th
gully trap from the top of bed concrete upto ground level. The space between the chamber walls and the tra
shall be filled with cement concrete 1 : 5 : 10. The upper portion of the chamber i.e. above the top level of th
trap shall be plastered inside with cement mortar 1 : 3 (1 cement : 3 sand) finished with floating coat of nea
cement. The corners and bottom of the chamber shall be rounded of so as to slope towards the grating.
Fixing FRC G.T. round cover with frame incl. fixing the same.
Mode of measurements & payment :
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory completion o
this item as described above.The rate shall be for a unit of one number basis.
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORK
SECTION. NO. 24.19, PAGE NO.
Item No. 15 (A) & (b) Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well
prepared surface and compacting with plate compactor to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in
uniform layers in sub- base / base course on well prepared surface and compacting with plate compactor to achieve the
desired density
For detailed specification refer latest edition of MoRTH.
The Mode of measurement and rate shall be given as per one cubic meter basis..
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Item No. 16 Extra Rate Over Item Of Excavation Of Earth For Excavation Of Asphalt Pavement / RCC Of
Thickness Upto 0.20 Meter Including Demolishing The Asphalt Carpet,Metal,Soiling/Cutting Reinforcement
Etc.Comp. With Stacking The Material As Directed. Sub:-
A) Upto 0.20 Meter Thickness (By Manual).
Extra rate for excavation of asphalt payment / RCC of thickness upto 0.20 meter including demolishing
the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking the materials as directed.
The road surface of asphalt shall carefully be opened to full width as directed by the Engineer in charge so as to
remove all cracks or other damaged portions of road either manually or with the soiling shall be first be stripped
off for the whole width of trenches. All the materials shall be separately deposited in such places as may be
determined by the Engineer-in-charge. In case rubble not being so deposited or being mixed up with the
excavated materials will not be allowed for refilling. The cost of materials shall be charged from the contractor.
The decision of the C.E. shall be final and binding to the contractor.
The Mode of measurement and rate shall be given as per one square meter basis.
B) 0.20 Meter To 0.30 Meter Thickness (By Breaker Machine Including Cost Of Operator, Fuel, &
Transportaion Etc Complete.
Extra rate for excavation of asphalt payment / RCC of thickness from 0.20 meter to 0.30 meter including
demolishing the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking the materials as
directed. For detailed specification refer item no.
The Mode of measurement and rate shall be given as per one square meter basis.
C) 0.30 Meter & Above (By Breaker Machine Including Cost Of Operator, Fuel, & Transportaion Etc
Extra rate for excavation of asphalt payment / RCC of thickness 0.30 meter & above including demolishing the
asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking the materials as directed. For detailed
specification refer item no.
The Mode of measurement and rate shall be given as per one square meter basis.
Item No. 17 P/F Name Board of 45X60 cm size showing grant detail with necessary painting & writing
letters as per given inst. & design etc comp.
This item includes providing, fabricating, and fixing a metal sheet(Patara) 60cm x 45cm size as per the approved
design and shall be painted with enamel paint. The necessary description shall be painted with letters of appropriate
fonts directed. Work in general shall be carried out as per instruction of engineer in charge.
The Mode of measurement and rate shall be given as per number basis.
Item No: 18 Constructing Slab type Chamber of following size including excavation, refilling, BBCC (1:5:10), for
foundation, C.C.Channel (1:2:4) finished, 15 mm thick cement plaster inside & outside in CM 1:3, finishing
with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered masonary in CM
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
1:5, RCC Slab in CC 1:1.5:3, including Centering & reinforcement but excluding the cost of chamber seat cover
etc..completed.(a) A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=150mm.
(B) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20 mm. (C) 0.75 X
mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=230 mm
The inspection chamber shall be constructed as per plan and section approved by the city engineer. The
specification for different items are as under:
This shall be done as per specification in Item No.
(ii) Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept. booklet for
General Technical Specification for building works , Page no. 31 , Section. No. 5.3.8(a)
(iii) Brickwork(1:5): For detailed specification refer R & B Dept. booklet for General Technical Specification
for building works , Page no. 43 , Section. No. 6.12(B).
(iv) C.C. Channels : Cement concrete of the invert and channels of manholes shall consist on a part 1 part of
cement 2 part of sand, 4 part of black trap metal or other approved material of size 1/4' to 1' well grade as per
The work shall be done as per P.W.D. hand book specification No. 20 and as per general instruction of C.E. The
rate includes all necessary materials mixing lifting placing ramming watering etc. the expressed faces to be
neatly of the channels shall be half round as per drawing and instructions of the engineer in charge.
(V)Cement Plaster(1:3) :For detailed specification refer R & B Dept. booklet for General Technical Specification
for building works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the plaster shall be 15 mm
instead of 10 mm.
FRC SEAT COVER:
Frame shall be fixed in cement concrete all around and finished with neat cement. The. F.R.C (L.D.-25)
chamber seat and cover shall be as per central store approved design. Cover [ 706 x 556 x 50 mm rectangular
cover. 2.5 mt load design 50 x 2 mm MS flat all round. 12 mm ǿ plain round bar for lifting the cover & should be
fitted with plastic caps ] and frame [ 600 x 450 mm clear opening, outer size 816x 666x100 mm.on the upper
periphery of frame 25 x 3 mm wide M.S. flat should be well embedded in concrete to protect the edge of frame
The M/s shall be on No. Basis.
Item no 18 & 19 DOUBLEWALLCORRUGATED(DWC)HDPEPIPES:
Thisspecificationcoverstherequirementsforsuccessfullydesigning,manufacturing,sup
plying,laying,jointingandtestingatworksandsiteofdoublewallcorrugated(DWC)HighDe
nsityPolyethylene(HDPE)PipesusedfordrainageandSewerage.
APPLICABLECODES
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Themanufacturing,testing,supplyingandtestingatworksitesofHDPE-
DWCpipesshallcomplywithIS16098Part-
II:2013andallcurrentlyapplicablestatutes,regulations,standardsandCodes.Inparticular
,thefollowingstandards,unlessotherwisespecifiedherein,shallbereferred.Inallcasesth
elatestrevisionoftheCodesshallbereferredto.IfrequirementsofthisSpecificationconflic
twiththerequirementsofthestandards/Codes,thisSpecificationshallgovern:
CodeNo. Title/Specification
IS4905:1968 Methodsforrandomsampling.
IS5382:1985 Specificationforrubbersealingringsforgasmains,watermainsandsewers(f
irstrevision).Type-I&Type-VI
IS12235 Methodsoftestforthermoplasticspipes&fittings.
(Part1):1986 Methodofmeasurementofoutsidediameter.
(Part5):1986 Reversiontest
(Part8):1986 Internalhydrostaticpressuretest
IS16098Part-II:2013
Structuredwallplasticspipesfornonpressuredrainageandsewerage-
specifications.
OthersCodesnotspecificallymentionedherebutpertainingtotheuseofHDPE-
DWCpipesformpartoftheseSpecifications.
PipesshallbedesignatedasperIS16098:2013,accordingtothegradeofmaterial,followed
bystiffnessclasses(SN)andNominaldiameterse.g.200mmSN-8.
Thematerialfromwhichthepipeisproducedshallconsistsubstantiallyofpolyethylene(PE
),towhichmaybeaddedonlythoseadditivesthatareneededtofacilitatethemanufacture
ofthesepipesandfittingsconfirmingtorequirementofthisstandardsaspertable1,2,3&4.
Apipeoffittingswithasmoothinternal&profiledexternalsurfaceformingafinisheddoubl
ewalledprofileshallcomeunderthisstandard
Whensealingringsareretainedbymeansofretainingdevices(ringsorcaps),thedevicesma
ybemadefrompolymers,providedtheyconformtothesamefunctionaldimensionsandte
strequirementsasappliedtosocketswitheitherlooseorfixedsealingrings.
Themanufacturer’sownreworkmaterialconformingtotherequirementsgivenin3.25
ofIS:16098ispermissible.Nootherreworkmaterialshallbeused.
MeaninsideDiameter
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Themeaninsidediameter,atanypointandtolerancesshallbeasgiveninTable5ofIS:16098
andshallbemeasuredaccordingtothemethodgiveninIS12358(Part8).WallThicknessThe
nominalwallthickness,e,shallbeinaccordancewithTable5ofIS:16098.Tolerancesininsid
ediametersshallbethosegiveninIS:16098.
Effectivelengthofpipes(Le)withsocketsshallbenotlessthanthatspecifiedbythemanufac
turerwhenmeasuredasshownfiguretoofIS:16098:2013.
Thelengthsmaybesuppliedasagreedtobetweenthepurchaserandthemanufacturer.Di
mensionsofpipes&spigotsofpipes&fittings.Thenominalsizeandminimummeaninsided
iameterforDN-IDseriesarespecifiedinTable-5.TheoutsidediametersoftheDN-
IDseriespipesandspigotsintendedtohavejointingdimensionsaspipesand/orfittingsacc
ordingtothisstandardshallcomplywiththeoutsidediametersandtolerancesasspecified
bythemanufacturer.However,theguidelinesforpipes,spigotsandfittingsnotintendedto
havejointingdimensionsaspipesand/orfittingsaccordingtothisstandard,thetolerances
oftheoutsidediameterofpipesandspigotsfittingsshallbe+0.3mm/(-
)0.6mmofthenominalsizeofoutsidediameter.
INSPECTIONANDTESTING:
ThematerialwillbeinspectedandtestedbytheInspectorstobenominatedbytheEmploye
r.ThesamplingproceduretobeadoptedandthecriteriaforconformityshallbeasgiveninIS:
16098.Thefollowingtestsshallbeconducted:
Typetestsareintendedtoprovethesuitabilityandperformanceofanewtechniqueorane
wsizeofpipe.Typetestingshallbeinaccordancewithtables15to18asapplicable
ofIS:160982013.Alltestsaretobecarriedouteitherinanin-
houselaboratoryoratanauthorisedthirdpartylaboratory.
A) PHYSICALCHARACTERISTICS:Appearance
Thestructuredouterlayeroffinishedpipesandfittingsshallbeuniformlycorrugated.Thein
nerlayershallbesmoothandplain.Bothlayersshallbefreefromanyvisualdefectssuchascr
acks,blisters,foreigninclusionsandanyothervisualirregularitieswhichmaycauseharmto
itsconstructionintegrities.Theinnersurfacemayreflectslightshallowundulations.
ColourofFinishedPipes
Theinnerandouterlayerofpipesandfittingsshallbecolouredthroughout.Theoutsidelaye
rofpipesandfittingsshouldpreferablybeblack,orangebrownorgrey.Whentestedinaccor
dancewiththetestmethodspecifiedinTable6andTable7usingtheindicatedparameters,t
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
hepipesshallhavephysicalcharacteristicsconformingtotherequirementsgiveninTable6
andTable7.WhentestedinaccordancewiththetestmethodspecifiedinTable8andTable9
usingtheindicatedparameters,thefittingshallhavephysicalcharacteristicsconformingt
otherequirementsasgiveninTable8andTable9.
B) MECHANICALCHARACTERISTICS
Thepipesshallbedesignatedinthefollowingnominalringstiffnessclasses(SN):
a) DN≤500:SN4,SN8orSN16
b) DN>500:SN2,SN4,SN8orSN16
ForDN≤500,themanufacturer’sguaranteedminimumstiffnessbetweentheSNvalues,of
acomponentmaybeusedforcalculationpurposesonly.Suchpipesshallbeclassified
andmarkedasthenextlowerstiffnessclass.Whentestedinaccordancewiththetestmetho
dspecifiedinTable10usingtheindicatedparameters,thepipeshallhavemechanicalchara
cteristicsconformingtotherequirementsgiveninTable10.
RingFlexibility
WhentestedinaccordancewiththetestmethoddescribedinTable10usingtheindicatedp
arameters,andvisuallyinspectedwithoutmagnification,requirementsin(a)and(b)shallb
esatisfiedduringthetestandrequirements(c)to(d)shallbesatisfiedafterthetest.
a) Thereshallbenodecreaseofthemeasuredforce;
b) Thereshallbenocrackinginanypartofthewallstructure;
c) Thereshallbenowalldelaminationexceptpossibledelaminationbetweentheoutsideandinsidewallo
fdoublewallpipesoccurringinreducedweldingzoneintheendsoftestpiece.Processaidingprofileof
materialotherthanthepipematerial(seeFig.1)isnotsubjecttothisrequirement;
d) Thereshallbenoothertypesofruptureinthetestpiece;and
e) Permanentbucklinginanypartofthestructureofthepipewallincludingdepressionsandcraters,shalln
otoccurinanydirection.
Markingshallbelabelled,printedorformeddirectlyonthepipeorfitting,insuchawaythata
fterstorage,weatheringandhandlingthelegibilityshallbemaintained.Markingshallnotin
itiatecracksorothertypesofdefectswhichadverselyinfluencetheperformanceofthepipe
MinimumRequiredMarking
Eachpipesshallbemarkedatintervalsofmaximum3m,atleastonceperpipe,withthefollo
winginformation:
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
a) Manufacturer’sname/Trade-mark;
b) Diameterseries,nominalsize;
c) Stiffnessclass;
d) Material;and
e) Lotnumber/batchnumbercontaininginformationregardingperiodofmanufacture.
Eachfittingshallbemarkedwiththefollowinginformation:
a) Manufacturer’sname/Trade-mark;
b) Diameterseries,nominalsize;
c) Nominalangle;
d) Stiffnessclass;
e) Material;and
f) Lotnumber/batchnumbercontaininginformationregardingperiodofmanufacture.
g) BISCertificationMarkingeachpipeorfittingsmayalsobemarkedwiththestandard
TheuseoftheStandardmarkisgovernedbytheprovisionsoftheBureauofIndianStandards
Act,1986andtheRulesandRegulationsmadethereunder.Thedetailsofconditionsunder
whichthelicencefortheuseoftheStandardMarkmaybegrantedtomanufacturersorprod
ucersmaybeobtainedfromtheBureauofIndianStandards.
RequirementfortheHDPE-DWCPipeSupplier
ThemanufacturerofHDPE-
DWCpipesfromwhomthepipeswillbeprocuredinthecontracthavecurrentaccreditation
underISO9000andshouldalsopossesBISlicenseforproductionofDWCpipesasperIS-
16098:2013.Hemusthavesuppliedatleast2.0kmofsuchpipesunderonecontractwhichs
houldhavebeencommissionedtothesatisfactionoftheclient.
Thebiddershouldsubmitthefollowingdata/certificatesregardingHDPE-
DWCpipesalongwiththeQualificationbid:
BrandName,Manufacturerscapacity,previoussupplydetailsetc.CopyofvalidISO9000
/14000accreditation.(Ifany)CopyofvalidBISaccreditationformanufactureofHDPE-
DWCpipeasperIS160982013.Manufacturer’srecommendationandPressuretestingpro
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
Elastomericsealingringsshallbefreefromsubstancesthatcanhaveadetrimentaleffecton
thepipesorfittingsusedinconjunctionwithpipes.
Thedesignoftheprofileanddimensionsofthesealingringislefttothemanufacturer,aslon
gasthepipewiththesealingringmeetstherequirementsofthisstandard.Wherethedesign
ofthesocketissuchthattheringisnotfirmlyfixedinposition,thehousingfortheringshallbe
sodesignedastominimizethepossibilityoftheringbeingdislodgedduringinsertionofthep
ipe(orspigotorfitting)tocompletethejoint.Elastomericsealingringsshallbeinaccordanc
ewithoneofthetype(Type1toType6)ofIS5382.Themanufacturershouldspecifythetype
ofsealingring(namelyType1,2,3,4,5or6)thatisbeingoffered.
Atestreportorconformitycertificatemaybeobtainedfromthemanufacturerofthesealin
gringforconformitytoIS5382.
Itisnotunusualforcorrugatedpolyethylenepipetobeconnectedtoothertypesofpipemat
erials.Availableoptionsdependonthejointdualityrequiredthroughoutthesystemandth
eparticularcombinationofpipematerials.Inmoststormsewerapplications,thepipecanb
ejointedbyheatingthepipeendstogether,wrappingthemwithageotextile,
andpouringaconcretecollararoundthem.Althoughsuchaconnectionisdependentonco
ntractorexpertise,itwillgenerallylimitsoilintrusionbutnotprovideawatertightjoint.Wat
ertightconnectionsbetweendifferentmaterialswillrequireadditionalfittingsandadapte
rs.Ifthoseoptionsarenotacceptable,aMachineholecanbeusedtomakethetransition.
Pipemanufacturersareavaluableresourceduringtheprojectplanningstagesincetheyare
familiarwithadaptersthatworkwellwiththeirownproducts.
PLAINENDPIPECOUPLERS
1. SoilTightSplitCoupler–ThisisaclamShelltypecouplerusedinNon-
WaterTightapplication.TheyareusedonperforatedorsolidstyleCPPpipesatsitewherethenativesoil
isstiffandcohesiveenoughtoreducethepossibilityofaloosesoilinfiltrationintothepipethatcouldcre
ateaflowrestriction.
2. SiltTightSplitCoupler–
TheseareCalmShelltypecouplertowhichagasketmaterialhasbeenaddedforthepurposeofrestrictin
gSiltInfiltrationintothepipeatacouplingjoint.Thisnon-watertightgasketmaterialmeetsASTM-D-
1056,Grade2A2orASTM-F-
477.Theinstallershouldtakecaretoremovealldirtandforeignmatterfromthepipeendsandgasketmat
erialtoensureasecurefit.
BELL&SPIGOTCOUPLERSWITH“O”RINGGASKETS
ThesecouplerstoimpedeorpreventtheinfiltrationorinfiltrationofliquidsinNON-
PRESSUREapplication.
1. Bell&SpigotCouplerswith“O”RingGaskets:-
Thesecouplersareproducedonthepipeduringthepipeextrusionprocess.Bell&Spigotpipesareavail
ablein20-footlengths,eachcouplerSpigotEndcomeswithanon-
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
pressurepipewaterleakrestrictiongasketmanufacturedperASTM-D-
477.ShouldgravityflowpressuretestsberequiredperASTM-F-
1417,oneshouldnottestuntilthepipeshavebeenbackfilledorrestrainedforsafety.
2. Sheargasketgravityflowsealcouplers:-Thesepliablecouplerswithstainlesssteelclamp-
GripCompressionbandshavebeenusedforyearsconnectingclay,concrete,steelandplasticpipesinal
ltypesofenvironments.Theyareimpervioustonormal.Aswithany
coupler,beforeapplying,insurethatnoforeignmatterjeopardizescontactbetweenthetw
3. MasticWrapCoupler:-
Wraparoundstylemasticcouplershaveanouterlayerofcrosslaminatedpolyethyleneplasticandanun
derlayeradhesivesurfaceofrubberizedmasticmaterial.Inbetweenthesetwosurfacelayersisahighstr
engthshearandpunctureresistantlayerofwovenpolypropylene.Thiscenterthirdlayerprovidestoug
hnessagainstpunctureaswellasstretchresistanceunderearthloadshiftsorsettlements.TheMasticwr
apcouplerismechanicallysealedbystainlesssteelscrewtypehoseclampcompressionbands.Thesea
djustablecompressionclampbandsareeasilysecuredusingsimpletoolssuchasscrewdrivers,nutdriv
ers,orsocketwrenches.Propertensiononthosebandswillprovideasealagainstinfiltrationandexfiltr
ationingravityflow,non-
pressurepipes.Eachmasticcouplercomeswiththreehoseclampcompressionbandsortieslocatedwit
hinthecoupler.Thereisonecompressionstraplocatedintheheatjointcorrugationpipevalley,andone
strapinthefirstvalleyoneachsideoftheheatjoint.Propercompressiontensiononeachstrap(centeredo
veracorrugationvalley)willforciblyapplythemasticsurfacearoundthecorrugationcrestsandwallst
oprovideaseal.Enoughtensionshouldbeappliedtosubstantiallysinkthecompressionstrapsintothec
orrugationvalleysbelowthecorrugationcrestsinordertohavealeakresistantseal.Priortoapplyingthe
masticsidetothepipebesuretocleanthepipeofsoil/dustparticlesthatcouldinterferewiththemasticse
almakingcontactwiththepipesurface.Masticcouplerscanalsobeusedtocouplecorrugationpipesma
nufacturedwithdifferentcorrugationdesignsofthesamepipesizeaswellastocouplepipestootherpip
esmadefromadifferentrawmaterialbase.
DELIVERYINSPECTIONS
ContractoralongwithProjectmanageorhisrepresentativemakeeveryefforttoensureord
eraccuracyandquality.Asafinalcheck,theAMCshouldconductapersonalinspectionatdel
iverytoverifythatthecorrectproductandtheexpectedquantityisreceived.Pipecorrugati
ons,gaskets,pipeends,couplersorotherjoints,andanyaccessoriesshouldbevisuallyinsp
ectedfordamagethatmayhaveoccurredduringtransportation
PRODUCTIDENTIFICATION
ProductmarkingsonCrumplerPlasticPipewillincludethefollowinginformationtofacilitat
ejobsiteinspection.
Nominalpipesize
Manufacturer’sname
Applicationstandard(s)
SignatureofBidder Page100of228
AhmedabadMunicipalCorporation
a) TheContractorshouldsetasideanareaforproductstobestoredonsite.
b) Thisareashouldbeflat,freeoflargerocks,roughsurfacesanddebris.
c) Itshouldalsobeoutofthewayofconstructiontraffic.
d) Pipemaybedeliveredeitherpalletizedorloose,dependingonthetypeandquantityofproduct.
e) Palletsmaybeunloadedwithabackhoe,forkliftorotherpieceofequipmentandanylonslingorcushion
f) Theslingshouldbewrappedaroundthepalletatthethirdpointsasitliftsthepalletontotheground.Asan
alternativetousingaslingtounloadfullpallets,thepalletmaybeopenedandlengthsofpipeunloadedin
dividuallybecarefullyrollingsinglelengthsofloosepipefromthedeliverytruckontothefrontendload
er,thenontotheground.
g) Alternately,thepipecanalsobeliftedusinganylonslingorcushionedcableatthethirdpoints.
h) EndhandlingwithaforkliftMUSTNOTbeusedaspipedamagewilloccur.
i) Duetojointweight,largerdiameterpipesshouldnotbeoffloadedbyhand.
a) Reasonablecareshouldbeusedinhandlingpipe.
b) Thepipeshouldnotbedropped,draggedorbumpedagainstotherpipeorobjects.c)Palletizedpipeshou
ldremaininthepalletforjobsitestorage.
d) Non-palletizedpipecanbestockpiledfortemporarystorageinaflatdebris-
freeareaoutofthewayofconstructiontraffic.
SignatureofBidder Page100of228
Ahmedabad Municipal Corporation
e) Beginthestockpilewithsecuredtimbersspacedthewidthoftheproposedstockpileata
distancenotexceedingthethirdpoints.
f) Forpipewithattachedbells,arecommendedstackingmethodistoalternatethedirecti
onofthepipelengthssothatthebellsarenotstackedoneachother.
g) Asuptothreepipescanbelaidbeforealternatingdirections.Subsequentlayersshould
followthesamepatternasthefirstbutwithfewersticksofpipeineachrow.
h) Forsmoothinteriorpipe,storagespacecanbeminimizedbynestingsmallerdiameters
intolargediameterpipe.
i) Factoryinstalledgasketsonthespigotshouldbeprotectedbypositioningthembetwee
STRINGINGTHEPIPE
a) Placingthepipeandaccessoriesalongtheopentrench,or“stringing”Cansavehandlin
b) Eachpipelengthshouldbelaidonalevelsurfaceasnearaspossibletothetrenchonthesi
deoppositetheexcavatedtrenchmaterial;allowsomespacebetweenpipetoprotectpi
c) Thepipeshouldbeoutofthewayofanyequipmentinalocationthatwillallowexcavati
ontoproceeduninterrupted.
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
WORKMANSHIP/APPEARANCE
Pipesshallbefreefromalldefectincludingindentations,delaminating,bub
bles,pinholes,cracks,pits,blisters,foreigninclusionsthatduetotheirnatur
edegreeorextent
detrimentallyaffectthestrengthandserviceabilityofthepipe.Thepipeshall
beasuniformascommerciallypracticableincolouropacity,densityandothe
rphysicalpropertiesasperrelevantISCodeorequivalentInternationalCode
.Theinsidesurfaceofeachpipeshallbefreeofscouring,cavities,bulges,dent
s,ridgesandotherdefectsthatresultinavariationofinsidediameterfromtha
tobtainedonadjacentunaffectedportionsofthesurface.Thepipeendsshall
becutclearlyandsquaretotheaxisofthepipe.
LOWERING,LAYINGOFPIPES
a) Eachpipeshallbethoroughlycheckedforanydamagesbeforelayingandonlythepipe
swhichareapprovedbytheProjectManagershallbelaid.
b) Whileinstallingthepipesintrenches,thebedofthetrenchshouldbelevelandfreefrom
sharpedgedstones.Thebeddingshouldbeasperpipetrenchdrawingsubmitted.
c) AsPEpipesareflexible,longlengthsoffusion-
jointedpipeshavingjointsmadeabovegroundcanberolledorsnakedintonarrowtren
ches.Suchtrenchescanbeexcavatedbynarrowbuckets
d) Duringthepipelayingofcontinuousfusionjointedsystems,duecareandallowancesh
ouldbemadeforthemovementslikelytooccurduetothethermalexpansion/contracti
onofthematerial.Thiseffectismostpronouncedatendconnectionstofixedpositions(
suchasvalvesetc)andatbranchconnections.Careshouldbetakeninfixingbyfinishin
gtheconnectionsatatimethelengthofthepipeisminimal(lowertemperaturetimesoft
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
e) Forsummertimeinstallationswithtwofixedconnectionpoints,aslightlylongerlengt
hofPEpipemayberequiredtocompensateforcontractionofthepipeinthecoolertrenc
f) Thefinaltie-
inconnectionsshouldbedeferreduntilthethermalstabilityofthepipelineisachieved.
g) Theflexibilityofpolyethylenepipesallowsthepipetobecoldbend.Thefusionjointed
PEpipeisalsoflexibleastheplainPipe.Thusthetotalsystemenablesdirectionalchang
eswithinthetrenchwithoutrecoursetotheprovisionofspecialbendsoranchor
blocks.However,thepipeshouldnotbecoldbendtoaradiuslessthan25time
stheODofthepipe.
h) PEpipeislighterthanwater.Hencecareshouldbetakenfornormalinstallationswhere
therecouldbeapossibilityoffloodingofthetrenchthusthetrenchshallbekeptfreeofw
atertillthejointinghasbeenproperlydone
i) Whenflooded,somesoilsmaylosecohesiveness,whichmayallowthePEpipetofloat
outoftheground.Severaldesignchecksarenecessarytoseeifgroundwaterflotationm
aybeaconcern.Obviously,ifthepipelinetypicallyrunsfullornearlyfullofliquid,orif
groundwaterisalwaysbelowthepipe,flotationmaynotbeasignificantconcern.
j) However,weightsbywayofconcreteblocks(anchors)aretobeprovidedsothatthePE
pipedoesnotfloatwhensuddenlythetrenchisfloodedandthesoilsurroundingthepipe
iswashedaway.Thussiteconditionsstudyisnecessarytoensuretheavoidanceofflota
k) Pipeembedmentbackfillshallbestone-
freeexcavatedmaterialplacedandcompactedtothe95%maximumdrydensity.
JOINTINGOFPIPES
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
Thepipeshallhaveajointingsystemthatshallprovideforfluidtightnessforth
eintendedserviceconditions.AppropriatejointingforHDPEpipeasspecifie
daboveshallbeselectedconsideringsiteandworkingcondition,pressurean
Thenetlengthofpipesassupplying,laidorfixedshallbemeasuredinrunnin
gmeterscorrecttoacm.
Item No. 19 Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In Cm 1:3, Finishing
With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm Staggered
Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding The Cost Of
Manhole Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H. length should
be parallel to the flow) 0.75 X 1.00 meter (Inside Clear) & (a) Depth from 0.00 to 2.00 mt.
(b)Depth from 2.00 to 3.00 mt
The manholes shall be Dismantling of existing Arch type manhole up to Arch and then Const. Slab
type manhole as per plan and section approved by the Addl. C.E. The specifications for different
items of manholes are as under :
Excavation: This shall be done as per specification mentioned in item No. 2 Excavation.
Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept.
booklet for General Technical Specification for building works , Page no. 31 , Section.No. 5.3.8(a)
Brickwork(1:5):
For detailed specification refer R & B Dept. booklet for General Technical Specification for
building works ,Page no. 43 , Section. No. 6.12(B).
C.C. Channels :
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement
parts of sand and 4 parts of aggregates of black trap metal of approved materials of sizes from
to 2.5 cm. well graded as per instructions.
The rate includes all necessary materials mixing, laying and ramming and watering. The exposed
faces to be finished with neat cement as per instructions. The channel shall be half round in lies
with the dia of pipe as per drawing and instruction of the engineer in charge. Proper benching
shall be provided at both sides of the channel.
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
Cement Plaster(1:3) :
For detailed specification refer R & B Dept. booklet for General Technical Specification for
building works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the plaster shall
be 15 mm instead of 10 mm.
4 mm dia M.S Steel HDPE coated steps 35 cm c/c at 35 cm staggered
For detailed specification refer R & B Dept. booklet for General Technical Specification for
building works , Page no. 159 , Section. No. 24.13 and fixation or any change at the site according
to the direction of Engineer-in-charge in charge
Carting of Surplus Earth :
The surplus earth which is left an site after refilling and proper watering of the trenches shall have
to be carted away upto a distance within 30 mts. & shall be spread at the site according to the
direction of Engineer-in-charge in charge.
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be smooth finished. For avoiding
surface cracks due to variation in atmospheric temperature and exposure to direct sunlight, RCC
slab of manholes after casting shall be kept wet. M 20 grade of concrete used for construction of
RCC manholes shall have minimum cement content of 360 kg/cum of concrete. Bar bending
schedule for reinforcement shall be prepared by contractor and got approved from owner/
engineer before proceeding with the work. Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant and size etc. required for
satisfactory completion of this item as described above.& the drawing as per A.M.C Dr. S.O.R
shall be final. The rate shall be for a unit of one number basis.
Item no 20(a),(b),(c) & (d) Repairing damaged M.H. and rasing M.H. up to road level incl. removing
damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps and existing MH sheet cover, removing the debris from MH and carting the same as
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
existing MH sheet cover, removing the debris from MH and carting the same as directed. The M/s
shall be on No. basis.
Item no 21 Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
The M/s shall be on No. basis.
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
Item no 22 F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm
thick circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar
for lifting the cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer
size- 888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS flat should be well
embed in concrete to protect the edges of frame. FRC E.H.D.-35 manhole cover & frame
described as above
(a)FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load and
frame size 560 mm clear opening size 890 x 890 x 120 mm.
(b) FRC medium duty cover size 670 mm dia & 70 mm thick 10 M.T. load design and frame
size 560 mm clear opening outer size 780 x 780 x 120 mm
© FRC medium duty Chamber seat cover (FRC) cover 706 x 556 x 50 mm rectangular cover frame
size 600 x 450 mm clear opening outer size 816 x 666 x 100 mm (MD-10)
(d)FRC light duty Chamber seat cover (FRC) cover with rectangular frame (LD-2.5)
Providing and Supplying Fiber reinforced concrete circular cover of following dia,thickness and
Load design, with minimum concrete grade M30 and minimum cement content shall be 360 kg /
m3, with maximum water cement ratio of 0.45, minimum reinforcement shall be 70 kg/cmt of
bars or with welded wire mesh, The minimum volume of fibers shall be 0.5 % of the volume of the
concrete. equivalent dia of fiber shall not be greater than 0.75 mm, the length to eq.dia ratio of
fiber shall be in range of 50 to 80, 2mm th M.S. flat of full thickness around periphery of cover
shall be provided, for lifting arrangement 16 or 12 mm dia plain bar should be fitted with G.I. or
plastic cup as per load design incl. loading carting unloading stacking etc. complete as per IS
The M/s shall be on NO basis.
Item no 23 Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be supplied byA.M.C.(from any store)
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to
match exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for
days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from any store).
The M/s shall be on No. basis.
Item no 24 Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing EHD-
35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for
existing EHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in
line and level to match exisisting road level in C.C. 1:2:4 and finishing smooth, watering
and protecting for 7 days etc. complete as per instruction by engg. in charge.
The M/s shall be on No. basis.
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
Item no 25 Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after
completion of the connection work as directed.
(A) 100 mm to 300 mm dia.(b) 350 mm to 600 mm dia & (c) 650 mm to 900 mm dia
Providing Kachcha or pakka dummy in the following dia. Pipes in such a way that there is no
seepage of water through it & and removing the same after the completing of the work as directed by
Engg. In charge of work.
The M/s shall be on No. basis.
Item no 26 Providing Dead Cantering using good quality Country Wood Planks, wall Plate of required
thickness and size including placing the nece. supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per standard engg. practice etc. comp. as directed..
Providing Dead Cantering using good quality Country Wood Planks, wall Plate of required thickness
and size including placing the nece. supports of reqd. size, nailing, fixing with mortar, levelling. All
specification for dead centring as per standard engg. practice etc. comp. as directed.
The M/s shall be on Smt. basis.
Item No. 27 Supplying, labour for break down repairing work for activities like excavation, disliting,
removing debris from trench back filling etc. comp. as directed by Eng.in charge.
Mazdoor at day /Night
Supplying, labour for excavation of all types of soil at any depth including excavation of
asphalt pavement of any thickness, demolition of brick work in CM of any proportion including
stacking of serviceable materials and disposal of unserviceable material etc. comp. as directed. no
labourer shall be of age 18 years or below. contractor is required not to supply any child lobour.
Supervisor or mukkadam shall be supplied as per the in struction of Engg in charge. M/s. shall be on
Item no 28 Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion & movement including cautionary board etc. Item
also includes for making temporary sufficient nos of lighting arrangement through out the work
with necessary required arrangement.
The same shall be removed after completion of work.
Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion & movement including cautionary board etc. Item also
includes for making temporary sufficient nos of lighting arrangement through out the work with
necessary required arrangement.
The same shall be removed after completion of work.
The M/s shall be on Rmt. basis.
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
Item No. 29: Leveling Or Orientation Of Existing Gully Trap Chamber Incl. Nece. Masonry In Cm 1:6 And
Plaster In Cm 1:3 Etc. Using Old G.T.Stone And Cover Etc. Comp.
This is items pertains to leveling top RCC or stone leveling gully trap and top stone.
Existing top stone of gully trap is not required to be removed carefully by moving side paving.
Asphalt stacking the derbies as dire. For leveling the brick bats masonry should be either
demolished of raised as per requirement on site. So as to gear uniform. level after finished the
raising of level by masonry should be done in 1:2 CM. The work rising demolishing should be done
in such manner that gully trap piece should not be damaged by carelessness of contractor should
be placed at no extra cost. The top stone removed earlier should be placed on masonry with rich
c:m, pointing on all side incl. pointing payment masonry of gully trap. Stone is broken it should
replaced by new RCC process top stone available from cement concrete stores be paying receipt
amount in advance, the derbies should be removed each site and collected and than it should be
carted away with in a lead of 60 mt. from site of work in general work should be as per instruction
of egg. In charge of work, Necessary certificate should be obtained and list of gully trap leveled
should be submitted on demand the arrangement of collecting the signature of the house holder
or whose gutter is required shall be done by the contractor in verify.
The Mode of measurement and rate shall be given as per one number basis.
Item no 30: Providing and operation dewatering Pump including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for
non working condition of machinery )
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for
non working condition of machinery )
M/s. shall be on Shift. basis.
Item no 31 Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work)
Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful materials
separately up to store. (No payment should be allowed for non working condition of machinery and
for pipe line excavation and laying work)
M/s. shall be on Hour. basis.
Item no 32 Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
non working condition of machinery and for pipe line excavation and M.H. work. Allowed only for
break down work)
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site
by using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and M.H. work. Allowed only for
break down work)
M/s. shall be on Hour. basis.
ITEM NO :33 To provide Tractor with Hydraulic Trolley, driver with fuel, to carryout different works
during day/night for 12 Hrs. Shift. Work shall be carried out as per the instructions of
Engineer In-Charge. No extra charged shall be paid for night shift.
This item relates to provide Tractor with Hydraulic Trolley, driver with fuel, to carryout
different works during day/night for 12 Hrs. Shift. Work shall be carried out as per the
instructions of Engineer In-Charge. No extra charged shall be paid for night shift.
M/s. shall be on Shift. basis.
ITEM NO : 34 Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on
site by using Operator, fuel, power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of machinery and for pipe line excavation
and M.H. work. Allowed only for break down work)
This item relates to Supplying Electric Breaker Machine for RCC Slab or Asphalt
Demolishing Work on site by using Operator, fuel, power Supply etc. Complete as Directed.
(No payment should be allowed for non working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break down work)
M/s. shall be on Shift. basis.
All work should be done as per instruction of Engg. in charge.
REST OF THE ITEM SPECIFICATION AS PER SOP from Drainage SOR year-2016 Ahmedabad
municipal corporation or COMPETATIVE AUTHORITY OVER RULE BY CONDITION OF FORM B-1
ITEM NO :- 35 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to
1 mt including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and
mm thick cement plaster inside the catch pit in the proportion of CM (1:3) with out
jali etc. comp. as directed.
This item relates to Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth
up to 1 mt including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm
thick cement plaster inside the catch pit in the proportion of CM (1:3) with out jali etc.
comp. as directed.
Measurements shall be given on Nos.basis.
ITEM NO :- 36 P/Fcatch pit jali With Frame 600 mm x 600 mm Clear Opening etc.comp.as
dir. By Engg. In charge (A) FRCJali with seat
P/Fcatch pit jali With Frame 600 mm x 600 mm Clear Opening etc.comp.as dir. By
Engg. In charge (A) FRCJali with seat
Measurements shall be given on Nos.basis.
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
Item no.37 Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering,
ramming etc comp. as dir.
Reinstatement of flooring to its original level with necessary BBSC/ and sand bedding etc. comp with
using old Nibhada stone/CC block in pointing with 1:2 cm as dire. The rate shall be for a unit
of one sq. Meter.
Item No.38: Supplying and fixing Nimbhada ladi 37 to 50 mm thick for walk-way, covering the
activity of excavation, ramming, Laying on sand bedding as per requirement to fix the Nibhada
Stone in Line & Level with cement pointing in cement mortar 1:2 etc complete as directed.
1.Nimbhada stone : The material shall conform to M-48 Page No.-16 except that the stone shall
be of ordinary nimbhada stone instead of rough kota stone .
2. Sand : As per buiding booklet M-6 Page No.4.
3.Cement : As per buiding booklet M-3 Page No.3.
The work man ship shall conform to buiding booklet section no. 14,-14.46 (A), 2.0 page no.-
except that the base shall be sand bedding of 5 cm thickness and cement pointing shall be in
Mode of measurment shall be on smt basis
Item No.39: P/L brickbats sand concrete (1:2) of one part of sand and two part of old brickbats
including spreading, laying, ramming, watering and consolidation etc complete as directed.
P/L brickbats sand concrete (1:2) of one part of sand and two part of old brickbats including
spreading, laying, ramming, watering and consolidation For detailed specification refer latest edition of
The Mode of measurement and rate shall be given as per one cubic meter basis.
Item No.40: Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 60mm
thick with grade of concrete M300 pnumatic compressed / vibrated mechanically and as per
approved design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling
the joint with sand in proper line and level as per guidlines of IRC : SP 63- 2018 etc. Complete
DETAILED GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS
Approved SOR 2023-2024
The Mode of measurement and rate shall be given as per Smt basis.
ITEM NO:41 Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for
Central Verge in M-20 grade using 20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with vibratory system for kerb
stones of approved design including curing, etc. complete, including the cost
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
of formwork etc. complete. The rate shall also include necessary cutting of
asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding
with necessary equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone
the sides of the kerb stone fixed with Bituminous concrete / C.C. mixed in
proper position to flush with the road surface as directed by Engineer in
change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production.
The scope of work includes manufacturing, supplying of pre-cast Rubber mould reflective paver
blocks. The work includes :
1.1 Manufacturing of Rubber mould reflective paver blocks in your plant as per
requirements of AMC's technical specification.
1.2 Supplying of Rubber mould reflective paver blocks at site, including handling at
1.3 Testing of Rubber mould reflective paver blocks through reputed Govt./Non
Govt. Test house and submission of test results as per requirements in Technical Specifications.
AMC reserves the right to carryout test at random. Cost for such tests to be borne by party incl.
carting of materials.
TECHNICAL SPECIFICATIONS :
I) Rubber mould reflective Paver Block Manufacturing Facilities:
The Rubber mould reflective Paver Block shall be made in factory with following minimum facilities
& shall be got approved before carting materials to site.
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Rubber mould reflective Paver
Blocks by obtaining high level of compaction by application of hydraulic compaction and also by
high intensity vibration to the moulds. The machine should have automatic control panel for
uniformity in strength.
1.2 Concrete Batching & Mixing
The concrete mix design should be followed for each batch of materials separately and
automatic batching plant is to be used to achieve uniformity in strength and quality.
The factory should have well designed curing area to ensure adequate curing of paver
1.4 Laboratory (Desirable but not essential):
The factory should have the following:
(i) Compression testing machine of adequate capacity.
(ii) Other tools and equipment for testing raw materials and paver blocks.
(iii) (1). Systematic record of test results of various Rubber mould reflective
paver blocks manufactured in the factory.
(2). Concrete Mix Design for various grade of concrete used for making of
Rubber mould reflective paver blocks.
II) SPECIFICATIONS FOR COLOURED RUBBER MOULD REFLECTIVE PAVER BLOCKS:
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
Coloured concrete Rubber mould reflective paver blocks shall be manufactured as per
specifications using approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE
PIGMENTS” with minimum colour pigment of 3% by weight of cement. The colour shade shall be
as selected by AMC before commencement of the work. White cement shall be used for colored
pavers to obtain the desired colour shade.
The colour of the Rubber mould reflective paver block shall be guaranteed against fading of colour
for period of 3 months from the date of completion. Otherwise contractor shall have to replace it
without any cost.
All other technical specifications & Procedure for testing & sampling of coloured Rubber mould
reflective pavers shall be as per attachment.
III)RUBBER MOULD REFLECTIVE PAVER BLOCKS CHARACTERISTICS:
The concrete Rubber mould reflective pavers should have
perpendicularities after release from the mould and the
same should be retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type.
The Rubber mould reflective paver should have uniform chamfers to facilitate easy drainage
surface run off.
The Rubber mould reflective pavers should have uniform interlocking space of 2mm to 3mm to
ensure compacted sand filling after vibration on the paver Surface.
The Rubber mould reflective pavers shall be manufactured in single layer only.
The Rubber mould reflective pavers shall be of cement gray colour without any pigment & for
coloured Rubber mould reflective pavers refer “specifications for coloured Rubber mould reflective
IV) Rubber mould reflective Paver Block Dimensions :
Shape Uniregular (Uniform Shape with no
Hollow Or Creacks) Uni, I shape, tri hex
or directed by Addl .C.E.
Chamfer 4mm to 6mm along top edges
Colour a. Natural cement grey colour
without use of any pigment.
b. For coloured Rubber mould
reflective pavers refer “specifications for
coloured pavers”
Dimensional (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Rubber mould reflective Paver Blocks :
* TEST Average Values
(Average of Minimum
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
Five Samples/Site)
1. Compressive Min. 20 N/Sqmm for
Strength 60mm thick
2. Flexural Strength Minimum 4.5 N/Sqmm
4. Water Absorption Maximum 5.80%
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR RUBBER MOULD REFLECTIVE PAVER
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A
2. Compressive Strength
Testing for compressive strength shall be undertaken in accordance with standard test as
suggested by AMC.
3. Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor
4. Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor
5. Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for
Concrete Masonry Units)
Sampling of Rubber mould reflective Paver blocks.
1. Method of sampling :
Before laying Rubber mould reflective paver blocks, each designated section comprising not more
than 50000 blocks, shall be divided into ten approximately equal groups. Three blocks shall be
drawn from each group.
The mode of measurement shall be on Rmt. basis. (As laid on site)
ITEM NO 42 Providing and fixing pre-cast concrete kerb stone of gray cement based concrete
block 30cm length,30cm height and 15cm thick of M200 grade concret grade using
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for pre-
cast blocks, reasonably exposed finish/ formwork , mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete,
including the cost of formwork etc. complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding
with necessary equipments and materials. The rate shall also include the flush pointing
in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb
stone fixed with Bituminous concrete Bituminous concrete / C.C. mixed in proper
position to flush with the road surface as directed by Engineer in change to form a
portable mixture.
Laying on 5 cm thick Sand Bedding
The curb shall be M-20 of size 300 x 150 x 380mm it shall be laid in proper line and camber and
jointing vata in C.M. 1:3 prop. Including the activities of excavation, ramming etc. comp.
Trenches of specified width and depth shall first be mode along the edges of the wering course of
the road of along the line of pave block flooring to receive the restraint block. The bed of the
trenches shall be compacted manually with steel rammers firm and even surface and then stones
shall be set in P.C.C. The edge restraint blocks shall be laid with their length running parallet to the
paving edge, true in line and gradient. The joints of blocks shall be not more than to mm and filled
with the CM 1:3 (1 cement: 3 fine sand) which shall be cured for 7 days.
The edge shall be restored and all surplus earth including rubbish etc. disposed off as directed by
the engineer in charges.
Length of the finished work shall be measured in running meter along the edge of the paving
correct to a cm.
The rate shall include the cost the materials and labour including stone of specified materials
involved in all the operation described above. Sampling for testing on kerb shall be done Sampling
for testing on kerb shall be done in accordance with appendix – A as per Item No. 13. Testing for
compressive strength relevant shall be undertaken in accordance with I.S. Code.
The Mode of measurement and rate shall be given as per one running meter basis.
Item No. 43:- Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm
thick, M-35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould, Rate providing and laying
paver blocks as per required grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks shall be executed in line and
level by skill mason of flooring work only. It should be laid in such a way that the
no cutting of the paver block to be necessary. if cutting of paver block necessary
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
then it should be cut by machine only and carting. The finished surface of the
paver block shall have resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or such type of materials shall
not be allowed for production. Laying on 5 cms thick sand.
Providing and laying inter lock type C.C. paving:
Providing special superior quality paving of interlocking type superior quality of approved shape and
size pre-cast cement concrete block having crushing strength M-35 N/Sq. mm either plain or natural
colour in foot path, water table and kerb. Thickness of the C.C. block shall be 60mm, hydraulically
pressed in machine and well cured. Rate includes all lead and lift with carting at any site or in
Municipal Limit Stores, without brekage.
Mode of measurement shall be on Sq.mt Basis (As a laid on site)
Labour work for fixing above interlocking block on up to 50 mm th sand bedding leveling, watering and
fixing. Rate also includes average 30 cms depth excavation, filling, carting away debries / excavated
materials up to 5.0 kmt. Cleaning the site etc. comp. as directed.
C.C. Block shall be laid on 50 mm the sand bedding, leveling, etc. comp. Rate also includes up to
mm thick excavation and / filling and carting away derbries / excavated materials up to 5 kms lead.
Excavation shall be done to the reqd. depth & level & grade as shown to the contractor. The
foundation bed should be watered and consolidation before the bedding is laid. Block shall be laid in
line and level as per design / pattem in propor tion of coloured blocks approved by AMC.
The Mode of measurement and rate shall be given as per one square meter basis.
Excavation and compaction up to 30 cm in height. for footpath paving in all sorts of soil murrum
including sorting outs and stacking of useful materials stuff up to 50 mt. lead from excavated place and
same well be carting up to 5 km.
The scope of work includes manufacturing, supplying and laying of precast paver blocks at various
Retail outlets. The work includes:
1.1 Verification of the existing site condition and advising our project in charge to lay suitable base
course if required. Contractors are required to satisfy themselves with quality of sub grade,
sub-base course before the paver blocks are laid and suggest strengthening if required.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver
1.3 Manufacturing of paver blocks in your plant as per requirements in technical specification
1.4 Supplying of paver blocks at site, including handling at both ends.
1.5 Laying of paver blocks at site as per requirement in technical specification, within shortest
possible time the site is public place hence care should be taken to ensure that the routine
activities shall not be disturbed. The job of laying may required to be carried out during night
1.6 Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test
results as per requirements in Technical Specifications. AMC reserves the right to carryout test
at random. Cost for such tests to be borne by party.
1.7 The contractor shall guarantee that all material and components designed, fabricated, supplied
and laid by him shall be free from any type of defect due to faulty material and/or
workmanship/erection for a period of One year from the date of completion of work at
individual sites.
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
TECHNICAL SPECIFICATIONS:
I) Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
1.1 Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the
moulds. The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient
should be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The
plant should equip with automatic control panel for maintaining water cement ratio from batch to
batch to obtain concrete of uniform quality and strength. The plant should be equipped with
adequate mechanism for mechanized loading of raw materials into mixer and conveyor belt for
transportation of concrete from mixer to concrete block making machine to maintain quality of wet
The factory should have well designed curing area to ensure adequate curing of paver blocks.
1.4 Laboratory (Desirable but not essential):
The factory should have the following:
1) Compression testing machine of adequate capacity.
2) Other tools and equipment for testing raw materials and paver blocks.
3) Systematic record of test results of various paver blocks manufactured in the factory.
4) Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS:
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved
colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour
pigment of 3% by weight of cement. The colour shade shall be “RED” as selected by AMC before
commencement of the work. White cement shall be used for colored pavers to obtain the desired
colour shade. The job also includes providing 50 mm thick sand bedding to match the shade of the
The colour of the paver block shall be guaranteed against fading of colour for period of 24 months from
the date of laying of the same at site.
III) PAVERS BLOCK CHARACTERISTICS:
The concrete pavers should have perpendicularities after release from the mould and the same should
be retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling
after vibration on the paver Surface.
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
The concrete mix design should be followed for each batch of materials separately and automatic
batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only. Skilled labour should be employed for laying
blocks to ensure line and level of laying, desired shape of the surface and adequate compaction of the
sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 300mm X
300mm X 75mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing
shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions:
Thickness 60 mm to 80 mm
Shape Uniregular (Uniform Shape with no Hollow Or Creacks) I shape, or any
other shape approved by AMC.
Chamfer 4mm to 6mm along top edges
Colour a. Natural cement grey colour without use of any pigment.
b. For coloured pavers refer “specifications for coloured pavers”
Dimensional (+/-) 2mm for length & width,
Tolerance (+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks:
SR. * TEST SPECIFICATION Average Values (Average of
Minimum Five Samples/Site)
1 Compressive Strength Min. 20 N/Sqmn for 65 mm thick
2 Flexural Strength Minimum 20 N/Sqmm
3 Abrasion Resistance Maximum
4 Water Absorption Maximum 5.80%
5 Minimum Cement Content 330 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
2. Compressive Strength
Testing for compressive strength shall be undertaken in accordance with IS code. The average
compressive strength of the bocks tested shall be Min. 20 N/Sqmm.
3. Abrasion Resistance
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete
4. Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete
5. Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications
for Concrete Masonry Units)
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks,
shall be divided into ten approximately equal groups. Three blocks shall be drawn from each
2. Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated
sections of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they
have been tested. The testing shall be carried as soon as possible, after the sample has been
taken. As soon as practicable after sampling. The samples shall be stored in water at 20 degree
C for 24 hours prior to testing.
Item No. 44: Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb Block for
Footpath in M-20 grade using 20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with vibratory system for kerb
stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include necessary cutting of asphalt,
fixing the Kerb stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides
of the kerb stone fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In any case Gravel or
such type of materials shall not be allowed for production. a) Laying on 5 cm
thick Sand Bedding.
Supplying and fixing M-20 grade using black trap aggregate of
Sevaliya/Timba or equivalent quality 20 mm. nominal size for pre-cast reasonably exposed finish/,
formwork using mould with well equipped with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of formwork etc. complete. The rate shall also
include excavation and erecting and fixing the kerbs in position with necessary equipments and
materials. The rate shall also include the flush pointing in CM (1:3) for all joints including kerb stones of
approval design (Sample must be got approved). In any case Gravel or such type of materials shall not
be allowed for production .a) Laying on 5 Cms thick Sand Bedding Kerb Stone Fixing 300mm-L x
150mm-B x 380mm-H :- Supplying and fixing M-20 grade using black trap aggregate of
Sevaliya/Timba or equivalent quality 20 mm. nominal size for pre-cast reasonably exposed finish/,
formwork using mould with well equipped with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of formwork etc. complete. The rate shall also
include excavation and erecting and - 41 - fixing the kerbs in position with necessary equipments and
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
materials. The rate shall also include the flush pointing in CM (1:3) for all joints including kerb stones of
approval design (Sample must be got approved). In any case Gravel or such type of materials shall not
be allowed for production. a) Laying on 5 Cms thick Sand Bedding Materials : Water shall conform to
M-1. Cement to M-2. Sand to M-5. Grit to M-7. Graded stone aggregate 20 mm. nominal size to M-10
General : Contractor shall have to manufacture the blocks as per the dimensions given in the drawing.
Specific machineries shall be used to manufacture the Precast blocks. These machineries should be
compatible to produce blocks of required strength and dimensions. The machine shall contain
hydraulic Press or advanced equipment to generate required compaction & Grade and finish. Moulds/
Steel Plates/ Dies of the machine shall be dimensionally checked & to be got approved before
commencing the production. Contractor shall prepare proper Drying Yard for keeping the blocks before
curing. The drying yard shall be levelled and covered so that no shrinkage cracks are formed.
Contractor shall prepare adequate size curing pond to cure the blocks for not less than 21 Days. No
other means of curing shall be allowed. The technical specification of concrete shall confirm to IS 456-
2000. The concrete mix is not required to be designed and only nominal mix as per IS : 456-2000 shall
be followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly exposed concrete
surface or as specified in the item. The designation ordinary M-10, M-15, M-20, M-25 specified as per
I.S. corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by
volume respectively. The ingredients required for ordinary concrete containing one bag of cement of
50 Kg. by weight (0.0342 m3.) for different proportions of mix shall be as per IS 456-2000. The
proportion of the aggregate for the kerb stone shall be modified as per the approval of the engineer-in-
charge. The water cement ratios shall not be more than those specified as per IS. The cement of the
mix shall be increased, if the quantity of water in a mix has to be increased to overcome the difficulties
of placement and compaction so that the water cement ratio specified in the table is not exceeded.
The maximum size of coarse aggregate shall be as large as possible within the limits specified but in
no case greater than 1/4th of the minimum thickness of the member, provided that the concrete can be
placed without difficulty so as to surround all reinforcement thoroughly and to fill the corners of the
form. For reinforced concrete work, coarse aggregates having a nominal size of 20 mm. are generally
considered satisfactory. Admixture shall be used in concrete only with approval of the Engineer-in-
charge based upon the evidence that with the passage of time, neither the compressive strength of
concrete is reduced nor are other requisite qualities of concrete impaired by the use of such
admixtures. Proportioning: Proportioning shall be done by volume, except cement which shall be
measured in terms of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 m3.
Boxes of suitable sizes shall be used for measuring sand and aggregate. The size of the boxes
(internal) shall be 30cm. x 30 cm. and 38 cm. deep. While measuring the aggregate and sand, the box
shall be filled without shaking ramming or hammering. The proportioning of sand shall be on the basis
of its dry volume and in case of damp sand, allowances for bulk age shall be made. Mixing : For all
work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept
in first class working condition and maintained throughout the construction. Measured quantity of
aggregate, sand and cement required for each batch shall be poured into the drum of the mechanical
mixer while it is continuously running. After about half a minute of dry-mixing, measured quantity of
water required for each batch of concrete mix shall be added gradually and mixing continued for
another one and a half minute. Mixing shall be continued till materials are uniformly distributed and -
42 - uniform colour of the entire mass is obtained and each individual particle of the coarse aggregate
shows complete coating of mortar containing its proportionate amount of cement. In no case shall the
mixing be done for less than 2 minutes after all ingredients have been put into the mixer. Mixers which
have been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a new
batch. Unless otherwise agreed to by the Engineer-in-charge, the first batch of concrete from the
mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another. Consistency : The degree of
consistency which shall depend upon the nature of the work and methods of vibration of concrete,
shall be determined by regular slump tests in accordance with IS : 1199-1959. The slump of 10 mm. to
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
25 mm. shall be adopted when vibrators are used. Inspection : All Moulds shall be cleaned and made
free from standing water, dust, snow or ice immediately before placing of concrete. Formwork/Metal
Mould for exposed concrete surface (If indicated): All the moulds shall be checked for exact
dimensions of the Precast blocks. All the edges of the Precast blocks shall confirm the profile of the
final drawing & edges/ curvatures of the moulds shall be checked accordingly. Moulds shall be
regularly checked for correctness of dimensions of Blocks, twists, bends due to handling, etc.. before
starting every days work. Care shall be taken to set all formwork/Mould in perfect line, level (or in
required camber or slope as specified) and plumb. Formwork/Mould propping shall be strong, rigid and
sturdy. The formwork/Mould shall be as per pattern & design shown in drawings. Formwork/Mould
shall be done accurately and precisely so as to achieve neat, clean and smooth concrete surface, in
line, level and plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed.
Before placing concrete, forms shall be thoroughly cleaned off of all rust, dust and loose materials.
Colorless oil or grease of approved quality shall be applied before placing steel. Also the formwork
material will be of wood/plywood/steel or any sort of such material, as approved by the Engineer in
charge, so that all exposed concrete surfaces have uniform colour. For all kind of exposed concrete
work only one brand (to be approved by the Engineer-in charge)of cement shall be used. Removal of
Moulds: Specific time shall be identified for removal of moulds, such that the concrete of the Precast
blocks shall gain strength to withstand the stresses generated due to self weight and handling to
drying yards without any deformation to shape/ dimensions/ edges. Drying Period: Sufficient time shall
be given to the block after it is removed from the mould so that it can gain strength and dry in shade to
prevent any cracks due to shrinkage. This shall be done in drying yards. Curing Period: Curing of block
shall be done only in curing pond and curing shall be done for minimum 14 days. Drying period after
removing from pond & before delivery to site: Water should be drained of from the block before it is
actually sent to the site. Time should be provided for proper draining of water which may be present in
the block kept for curing in the pond. Precautions: Precaution shall be taken while transporting of the
blocks to site. The blocks should be loaded and unloaded with due care so as to avoid generation of
stresses leading to breaking of block. Care should be taken to prevent the block from breaking during
transporting. - 43 - Fixing: The pits of the size 0.15 M in width and required depth shall first be
excavated, true to line and level. The relevant specifications of item A- 1 shall be followed for
excavation work. The pits shall be filled with a layer of 0.05 M. thick sand bedding. The curbs then
shall be placed in position of which 50mm. shall be below road. Care should be taken to maintain
proper line and level. The joints between the kerbs shall be pointed with C.M. 1:2 and cured for
minimum seven days. Sampling and testing of concrete: Samples from fresh concrete shall be taken
as per IS : 1199-1959 and cubes shall be made, cured and tested at 7 days or 28 days as per
requirements in accordance with IS : 516-1959. A random sampling procedure shall be adopted to
ensure that each concrete batch shall have a reasonable chance of being tested i.e. the sampling
should be spread over the entire period of concreting and cover all mixing units. NOTE: At least
sample shall be taken from each shift. Ten test specimens shall be made from each sample, 5 for
testing at 7 days and the remaining 5 at 28 days. The samples of concrete shall be taken on each day
of the concreting as per above frequency. The number of specimens may be suitably increased as
deemed necessary by the Engineer-in-charge when procedure of tests given above reveals a poor
quality of concrete and in other special cases. The average strength of the group of cubes cast for
each day shall not be less than the specified cube strength of 200 Kg/cm2. at 28 days. 20% of the
cubes cast for each day may have value less than the specified strength provided the lowest value is
not less than 85% of the specified strength. If the concrete made in accordance with the proportions
given for a particular grade, does not yield the specified strength, such concrete shall be classified as
belonging to the appropriate lower grade. Concrete made in accordance with the proportions given for
a particular grade shall not, however, be placed in a higher grade on the ground that the test strength
are higher than the minimum specified. If rock pockets/honeycombs in the opinion of Engineer-in-
charge are of such an extent or character so as to effect the strength of the structure, materially or to
endanger the life of the steel reinforcement, he may declare the concrete defective and require the
removal and replacement of the portion of the structure affected. Precast Kerb Stones : The relevant
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
specifications of concreting as per item above shall be followed except that work shall be carried out
for precast concrete kerb stones as specified in the item. All Precast members shall be cast at
workshop. Sufficient curing shall be done before placement of the same The method of transporting
and placing the precast members shall be as approved by the Engineer-in-charge. Members shall be
so transported that no breakage or undue stresses are induced in them. If required, all members shall
have a key provided on both the faces i.e. top and bottom surfaces, of adequate size so as to fill the
same with concrete while laying. The function of this key is to avoid the leakage through the joint
between the precast member and the member on which it is laid. Mode of Measurements and
Payment : The rate shall include cost of formwork but exclude the cost of reinforcement. The volume
occupied by reinforcement shall not be deducted from R.C.C. work. Mode of measurements and
payment: The rate shall be for a unit of Rmt.
Item No. 45: Supplying good quality River sand in Municipal Store. inclu.. Loading unloading As
dire. By engg. Incharge.Sand should be good qulity & free from all orgnanic & other impuntes.
The work in general is carried out as per inst. of engg. in charge.
Supplying good quality River sand in Municipal Store. inclu.. Loading unloading As dire. By engg.
Sand shall be medium/coarse natural sand, clean, well graded, hard, strong, durable and gritty. Sand
particles should be free from injurious amounts of dust, clay, kankar nodules, soft or flaky particles of
shale, alkali, salts, organic matter loam, mica or other deleterious substances and shall be got approved
from the Engineer-in-charge. The sand shall not contain more than 8% of silt as determined by field test
and 3% by laboratory test , if necessary the sand shall be washed to make it clean. All sand to be used for
plaster, brickwork , concrete shall be strictly sieved by 4.75 mm seive.
Testing Standards :
A. Silt Content :
Sampling : Test shall be carried out for every 150 m3 of sand. The sample taken for testing shall
Results : Permissible content shall be 3% in laboratory test & 8 % in field Test.
B. Fineness Modulus :
Sampling : Sampling shall be as in A.
Fine sand : 2.2 to 2.6 shall be used as earth filling in plinth, zari, etc.
Medium sand : 2.6 to 2.9 shall be sued for Brickwork and plaster.
Coarse sand : 2.9 to 3.2 shall be used for concrete.
In general, the fineness modulus of sand shall not be less than 2.5 and shall not exceed 3.0. A sand
having a fineness modulus more than 3.2 will be unsuitable for making satisfactory concrete.
C. The sieve analysis of sand shall be as under
IS Sieve % By weight IS Sieve % By Weight
Designation Passive sieve Designation passive sieve
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
The Mode of measurement and rate shall be given as per one cubic meter basis.
Item No. 46:-Providing and supplying bag of 53 grade opc cement as in good condition to use purchase
from the market in amc store incl. loading, unloading and stacking as directed by engg. Incharge (market
Providing and supplying bag of 53 grade ordinary portland cement like ultratech, jk laxmi, ambuja brand as
in good condition to use purchase from the market in amc store incl. loading, unloading and stacking as
directed by engg. Incharge and relevant other specification apporeved by R & B guide line
The Mode of measurement and rate shall be given as per one No. basis.
Item No. 47: Supplying grit size of 6.3 to 10 mm size at AMC Road Store incl.loading unloading
grit shall consist of crushed or broken stone and be hard strong dense,durable clean from dust
of proper gradation and free from skin on coating likely to preven proper adhension.
Supplying grit size of 6.3 to 10 mm size at AMC Road Store incl.loading unloading.
Grit shall consist of crushed or broken black trap stone and be hard, strong, dense, durable clean of proper
gradation and free from skin or coating likely to prevent proper adhesion of mortar. Grit shall generally be
cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall generally comply
with the provisions of IS : 383 Unless special stone of particular quarries is mentioned, grit shall be
obtained from the best black trap or
equivalent hard stone as approved by the Engineer-in-charge. The grit shall have no deleterious reaction
The grit shall conform to the following gradation as per sieve analysis:.
IS Sieve % By weight IS Sieve % By Weight
Designation Passive sieve Designation passive sieve
The crushing strength of grit will be such so as to allow the concrete in which it is used to build up the
specified strength of concrete.
The necessary tests for grit shall be carried out as per the requirements of IS : 2386 (parts I to VIII) , as per
instructions of the Engineer-in-charge. The necessity of test will be decided by the Engineer-in-charge.
The Mode of measurement and rate shall be given as per one cubic meter basis.
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
Seal and Signature of the Bidder Add City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmrvj ftuvtuohuNl
bægÍtul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
"yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE
ytExbltu CtJ J^thtu ytvJtbtk ytJNu lrn. yuf s ftuLx[tfxhu yuf søgtyu <btb ftbdehe vtKe,
z[ulus, vuJ´d, heEMxuxbuLx rJ. <btb ftbdehe fhJtle Au. yBþf JF<u btºt vtKelt Ôgrf<d< flufNltu
s c>jJtlt «mkdtu WCt &Nu ylu yBþf JF< btºt bulntuj/ auBchlu Vh<u fta ltkFuÕþk ÃjtMxh fhJtLþk
&tg <uÔþk vK clNu. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu fu btºt ytMVtÕx htuz
d{tWxed - heEMxux fhJtltu &Nu. <uJe >huf ytExbbtk J^^x &tg fu ytExb yu¾Íe¾Gþx l &tg <uÔþk vK
clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu
&Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug
<ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl
fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe
NftNu lrn. yLg&t yuLSlegh RLatso le mwalt bwsc ftblt sÚ&t «btKu htusle vulÕxe ftb ck^
hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu."
ftuLx[tfxhle mne yuze.mexe.yuLSlegh
rm¬t ylu btuctEj lkch (bægÍtul)
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (CENTRAL ZONE)
BILL OF QUANTITY
Qty. Item Description Rate per Amount
Dismentaling including stacking of serviceable materilas
andiled of stone floors laid in mortar disposal of
unserviceable materials with all lead and lift (P.140
I.No.2005 Building S.O.R.2023-2024)
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead.(A) Loose or
soft soil (P.50 I.No.04B001A Building S.O.R.2023-2024)
Conveyance charges of lime, murrum, building, rubbish,
manure or sludge and excavated rock and fly ash J.
km (P.6 Statement 5 I.No.030201A1 Building S.O.R.2023-
Providing & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 hand broken stone aggregates 40 mm
4 700 nominal size) and curing complete excluding cost of form Cmt
work in Foundation and plinth (P.52 I.No.05004A Building
Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering strutting
and propping etc. Height of propping and centering below
supporting floor to ceiling not exceeding 4 M. and
removal of the same for in situ reinforced concrete and
plain concrete work in. (A) Foundations Footings Bases of
Columns etc. and Mass concrete. (P.78 I.No.09001AA
Building S.O.R.2023-2024)
Providing TMT Bar FE 415 reinforcement for R.C.C.work
including bending, binding and placing in position
complete upto floor two level (P.54 I.No.05014BA
Building S.O.R.2023-2024)
Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork and
7 1000 reinforcement for reinforced concrete work in (A) Cmt.
Foundations, footings, Base of columns and Mass
concrete(P.56 I.No.05024AA Building S.O.R.2023-2024)
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
Providing and laying in position Ready Mixed M 200 grade
concrete for reinforced cement conctere work , using
cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
8 1000 R.M.C. from transit mixer to site of laying, excluding the Cmt.
cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended proportions
as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
Without Fly Ash (Min cement level as per latest IS
shall be maintained) (P.66 I.No5055 Building S.O.R.2023-
Providingand laying inposition
ReadyMixedM250gradeconcreteforreinforcedcementcon
ctere work , using cement content as per approved Design
Mix manufactured in fully automatic batchingplant
andtransportedtositeofwork in transit mixer for a lead up
to 10 kms having continuous agitatedmixer,
manufactured as per
mixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. from
transitmixertositeof laying,excludingthecostof centering
shuttering finishing and reinforcement including cost of
admixtures in recommended proportions asper IS:
toaccelerate/ retard setting of concrete,
improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof
theEngineer- in- charge.Without FlyAsh (Min cement level
as per latest IS 456 shall be maintained) (Cement level
P/A Tremix With Dewartering Machine And Floater
Machine On Constructed Cc Work For Finishing The
Surface As Per Requirement. The Rate Including All
Machinaries, Labor, Loading, Unloading, Transportaion
Etc Complete As Per Direction Given By Engineer In
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers not
11 200 exceeding 20 cm. in depth consolidating each disposited Cu.M
layer by ramming and watering.(P.48 I.No.4006 Building
Providing and laying (to level or slopes) and jointing with
stiff mixture of Cement Mortar in proportion 1:1 Salt
12 200 glazed stoneware pipes including testing of pipes and Rmt.
joints complete.(A) 100mm dia. (P.172 I.No.24001AA
Building S.O.R.2023-2024)
Providing and laying (to level or slopes) and jointing with
stiff mixture of Cement Mortar in proportion 1:1 Salt
13 100 glazed stoneware pipes including testing of pipes and Rmt.
joints complete.(B) 150mm dia. (P.172 I.No.24001BA
Building S.O.R.2023-2024)
Providing and fixing S.W. gully trap with C.I. grating brick
masonry chamber and water tight C.I. cover with frame of
14 100 300mm x 300mm size (inside) with standard weight.(i) Each
Square mouth traps. (A) 100mm x 100mm size P type.
(P.173 I.No.24006AA Building S.O.R.2023-2024)
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical
mix plant carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density as per Codal Provision. SOR
-(Jan- 2021/22) Rate for Road Works
(A) 500 (A) Production & Supply of WMM Cmt.
(B) 500 (B) Laying of WMM Cmt.
Extra rate over item of excavation of earth for excavation
of asphalt pavement / RCC of thickness upto 0.20 meter
including demolishing the asphalt
carpet,metal,soiling/cutting Reinforcement etc.comp.
with stacking the material as directed.SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
a 1000 a) upto 0.20 meter thickness (By Manual) Smt
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
b) 0.20 meter to 0.30 meter (By Breaker Machine
b 1000 including cost of operator, fuel, & transportaion etc Smt
c) 0.30 meter & above (By Breaker Machine including cost
of operator, fuel, & transportaion etc complete.
P/F Name Board of 45X60 cm size showing grant detail
17 35 with necessary painting & writing letters as per given inst. No
& design etc comp.Sub:-
ProvidingandsupplyingofClassSN8StructuredWallpolyethel
enePiping systems
(Pipewithonline/offlinecouplerandelastomericsealingring)
ExternalAnnularCorrugatedandSmoothInternalSurfaces(D
oubleWall)fornon-
pressureundergroundSewerage&Drainageapplicationaspe
(manufacturewithAnti-
roadentChemical)includingalllocalandcentraltaxes,
transportation,freightcharges,octroi,inspectioncharges,lo
unloading,conveyancetothedepartmentalstoresetc.compl
100 i)100mm Rmt.
100 ii)200mm Rmt.
Lowering,layingandjointingofclassSN8structuredwall(Exter
Corrugated&SmoothInternalsurface)PolyethylenePipinga
ndfittingswiththe
helpofcoupler(online/offline)attachedwithoneendofpipes,
slidingover the
elastomericsealingrubberringplacedonthespecifiedvalleyo
fthecorrugationat
thespigotend,loweringthesameintothetrench,layingonthel
19 owerbedding -
(constructedatbottomoftrenches)atprescribedgradient,de
pth&alignment,testing
thewatertightnessofthejoints,ensuringthecontinuitytestso
segmentsetc.completeasperdrawing,specifications&detail
includingcarriageofpipes&fittingsfromsitestackstotheplac
eoflayingetc.asper
directionofEngineer-in-charge.
100 i)100mm Rmt.
100 ii)200mm 33.00 Rmt.
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement plaster
20 inside in CM 1:3, finishing with cement slurry, Brick -
masonary in CM 1:5 & excluding the cost of chamber seat
cover etc..completed. SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=150 mm.
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=20 mm.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to
meter for pipe dia <=20 mm
Constructing Slab Type M.H. Chamber Of The Following
Size Including Excavation, Refilling, Brick Bats Cement
Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
of thickness 10 C.M., finished 15 mm thick cement plaster
inside & outside (Only for shaft) In Cm 1:3, Finishing With
Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated
Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5,
Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.)But Excluding The Cost Of Manhole
Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter
(Inside Clear, M.H. length should be parallel to the
flow)SOR - (Jan. 2016) Rates for work of Drainage / SWD
1.00 to 2.00 meter depth, (Slab at Ground level) (for pipe
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From
G.L.) (for pipe dia <=300 mm)
Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris
from MH and carting the same as directed. SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line
a 50 (A) up to 0.15 mt. (@ Two Coarse) No.
b 50 (B) up to 0.35mt. (@ Four Coarse) No.
c 50 (C) up to 0.65 mt. (@ Seven Coarse) No.
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
d 50 (D) up to 0.90 mt. (@ Ten Coarse ) No.
Repairing damaged I.C./ Raising removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber
and carting the same as directed. SOR - (Jan. 2016) Rates
for work of Drainage / SWD pipe line
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers &
Frames Cover : 728mm ø & 100 mm thick circular cover,
35.00 MT load design, 100x2mm MS flat allround, 16mm
ø plain round bar for lifting the cover & should be fitted
with plastic cups. Frame : 560 mm ø clear opening, outer
size- 888x888x175 mm. On the upper periphery of frame
25 x 3 mm wide MS flat should be well embed in concrete
to protect the edges of frame. FRC E.H.D.-35 manhole
cover & frame described as above SOR - (Jan. 2016) Rates
for work of Drainage / SWD pipe line
FRC heavy duty cover size 730 mm. & 90 mm thick circular
cover 20 M.T. design load and frame size 560 mm clear
opening size 890 x 890 x 120 mm.SOR - (Jan. 2016) Rates
for work of Drainage / SWD pipe line
FRC medium duty cover size 670 mm dia & 70 mm thick
10 M.T. load design and frame size 560 mm clear
opening outer size 780 x 780 x 120 mm SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
FRC medium duty Chamber seat cover (FRC) cover 706 x
556 x 50 mm rectangular cover frame size 600 x 450 mm
clear opening outer size 816 x 666 x 100 mm (MD-10) SOR
- (Jan. 2016) Rates for work of Drainage / SWD pipe line
FRC light duty Chamber seat cover (FRC) cover with
d 50 rectangular frame (LD-2.5) SOR - (Jan. 2016) Rates for No.
work of Drainage / SWD pipe line
Carting and Fixing M.H., Chamber or Catchpite Seat and
Cover in line and level to match exisisting road level in
C.C. 1:2:4 and finishing smooth, watering and protecting
for 7 days etc. complete as directed. M.H. seat cover will
be supplied byA.M.C.(from any store) SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
Providing and fixing cast iron manhole frame of weight
to 85 kg suitable for existing EHD-35 FRC MH cover, rate
also incl. loading, unloading and fixing the frame in line
26 50 and level to match exisisting road level in C.C. 1:2:4 and per Kg
finishing smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge. SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line
Providing Kachha of Pakka Dummy in the following dia
pipes and removing the same after completion of the
connection work as directed. SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line
a 10 (A) 100 mm to 300 mm dia. No.
b 10 (B) 350 mm to 600 mm dia No.
c 10 (C) 650 mm to 900 mm dia No.
Providing Dead Cantering using good quality Country
Wood Planks, wall Plate of required thickness and size
including placing the nece. supports of reqd. size, nailing,
28 50 fixing with mortar, levelling. All specification for dead Smt
centring as per standard engg. practice etc. comp. as
directed.SOR - (Jan. 2016) Rates for work of Drainage /
Supplying, labour for break down repairing work for
29 activities like excavation, disliting, removing debris from -
trench back filling etc. comp. as directed by Eng.in charge.
(A) 100 Labour charges - Mazdoor (Female) No.
(B) 100 Labour charges - Mazdoor (male) No.
Barricading the entire break down or excavated area on
rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint
/ Board out side to avoid accident & for smooth traffic
diversion & movement including cautionary board etc.
Item also includes for making temporary sufficient nos of
lighting arrangement through out the work with
necessary required arrangement...The same shall be
removed after completion of work. SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
Levelling or orientation of existing gully trap chamber incl.
Nece. masonry in CM 1:6 and plaster in CM 1:3 etc. using
old G.T.stone and cover etc. comp. SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
Providing and operation dewatering Pump including fuel
charges & operator Charges etc. as directed etc. comp.
(Shift for Eight Hour) (For Each Pump Set, No payment
should be allowed for non working condition of
machinery ) SOR - (Jan. 2016) Rates for work of Drainage /
Providing & Supplying JCB Machine on rental basis in case
of emergency situation and break down type work & also
during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and
33 100 operating charges and stacking of useful & non-useful Hour
materials separately up to store. (No payment should be
allowed for non working condition of machinery and for
pipe line excavation and laying work) SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No payment
34 100 should be allowed for non working condition of HR.
machinery and for pipe line excavation and M.H. work.
Allowed only for break down work) SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
To provide Tractor with Hydraulic Trolley, driver with fuel,
to carryout different works during day/night for 8 Hrs.
35 100 Shift. Work shall be carried out as per the instructions of Shift
Engineer In-Charge. No extra charged shall be paid for
Supplying Electric Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work.
Allowed only for break down work) ( Based on Previously
approved rate by C E sir ) SOR - (Jan. 2016) Rates for work
of Drainage / SWD pipe line
Signature of Bidder Page 32 of
Ahmedabad Municipal Corporation
Constructing Bombay Pattern Type Catch Pit of size 0.60 x
0.60 depth up to 1 mt including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick maso. wall in the prop. of CM
(1:6) with 40 mm thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster inside the catch
pit in the proportion of CM (1:3) with out jali etc. comp.
as directed SOR - (Jan. 2016) Rates for work of Drainage /
Cachpit jali Fixing P/F FRC Catchpit jali with frame 600 mm
x 600 mm clear opaning etc.comp.As directed by engi. In
charge SOR - (Jan. 2016) Rates for work of Drainage /
Labour work for fixing any kind of paving with cement
pointing in CM 1:2, including watering, ramming etc
comp. as dir.For pavementSOR - (Jan. -2016) for Central
Verge / Footpath / Stone Paving
I) Laying on Sand bedding as per requirement to fix the
C.C.Block / Nibhada Stone in Line & Level
Supplying and fixing Nimbhada ladi 37 to 50 mm thick for
walk-way, covering the activity of excavation, ramming,
Laying on sand bedding as per requirement to fix the
Nibhada Stone in Line & Level with cement pointing in
cement mortar 1:2 etc complete as directed.SOR - (Jan. -
2016) for Central Verge / Footpath / Stone Paving
2000 Nimbhada ladi paving (37 to 50 mm.) 233.20 smt.
P/L brickbats sand concrete (1:2) of one part of sand and
two part of old brickbats including spreading, laying,
41 1 ramming, watering and consolidation etc complete as cmt.
directed.SOR - (Jan. -2016) for Central Verge / Footpath /
Providing and fixing pre-cast Rubber Dye / steel Dye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and
as per approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and filling the
joint with sand in proper line and level as per guidlines of
IRC : SP 63- 2018 etc. Complete.(P.123 I.No14033 Building
Signature of Bidder Page 33 of
Ahmedabad Municipal Corporation
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B
Kerb block for Central Verge in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with
vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete / C.C. mixed in proper position to
flush with the road surface as directed by Engineer in
change to form a portable mixture. In any case Gravel or
such type of materials shall not be allowed for
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as
mentioned in the drawing/instruction of engineer in
charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be
44 1000 mechanically compacted. The work of paving blocks Smt
shall be executed in line and level by skill mason of
flooring work only. It should be laid in such a way that the
no cutting of the paver block to be necessary. if cutting of
paver block necessary then it should be cut by machine
only and carting. The finished surface of the paver block
shall have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if necessary. Gravel
or such type of materials shall not be allowed for
production. Laying on 5cms thick sand beddding.
Signature of Bidder Page 34 of
Ahmedabad Municipal Corporation
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-
H Kerb Block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork , mould with well equipped
with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include
45 300 necessary cutting of asphalt, fixing the Kerb stones in line Rmt.
and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any
case Gravel or such type of materials shall not be allowed
for production. a) Laying on 5 cm thick Sand Bedding.
Providing and fixing pre-cast concrete kerb stone of gray
cement based concrete block 30cm length,30cm height
and 15cm thick of M200 grade concret as per approved
design and including excavation for fixing in proper line
and level,filling the joint with C:M 1:3 (1cement:3fine
sand) etc complete.
Supplying good quality River sand free from foreign
47 50 materials, impurities etc comp as dire at different store of Cmt
khadiya ward with loading and unloading etc comp
Providing and supplying bag of 53 grade opc cement as in
good condition to use purchase from the market in amc
store incl. loading, unloading and stacking as directed by
engg. Incharge (market rate)
Supplying grit size of 6.3 to 10 mm size at all road store of
khadiya ward incl. loading unloading grit shall consists of
crushed or broken stone and be hard strong dense,
durable clean form dust of proper gradation and free
from skin on coating likely to preven proper adhension of
Supply recycled products manufactured by Amdavad
Enviro project pvt ltd (AEPPL)
a 700 Rubber mould paver Block ( 60 mm thick M -35) 242 smt
b 10 planter ( size 760 x 760 x 660 mm ) 1600 nos
c 10 planter ( size 1280 x 600 x 370 mm ) 1710 nos
Signature of Bidder Page 35 of
Ahmedabad Municipal Corporation
d 45 garden kerb (Size 300 mm x 300 x 75 mm) 91 rmt
e 300 foothpath kerb (size 380 x 300 x150 mm) 177.75 rmt
f 300 central verge ( size 380 x 300 x 200 mm) 390 rmt
Supplying, labour for Transportation of recycled products
manufactured by Amdavad Enviro project pvt ltd (AEPPL)
51 incl loading from product manufacturing site and
unloading at diff. site or AMC road stores comp. as
directed by engineer in charge.
a 499 Labour charges - Mazdoor (Male, Female) 493 No.
Hiring of Tractor with trolley considering 8 hrs. as working
day hours incl. Driver Transportation of recycled products
manufactured by Amdavad Enviro project pvt ltd (AEPPL)
incl loading from product manufacturing site and
unloading at diff. site or AMC road stores comp. as
directed by engineer in charge.
Seal and Signature of the Bidder Add City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 36 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.544.pdf
Download all tender documents and submit your bid