Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹3.9 LRejected-AOC | ₹3.9 L | L2 | Rejected-AOC SEC LOWEST |
| Sl No | Description | Qty | Unit | MOOSAKUTTY PP L1 | Habeeb Rahman.A L2 |
|---|---|---|---|---|---|
| 1.00thodu protection | |||||
| 1.00 | OD342059/2025-2026:OD-from 60.7.3-DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 50.51 | cum | 625 ₹31,568.75 | 500 ₹25,255 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 25 | hour | 285 ₹7,125 | 250 ₹6,250 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 24.28 | cum | 297 ₹7,209.97 | 250 ₹6,069 |
| 1.00 | OD342065/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site-OD from 60.7.1 | 73.75 | cum | 3,301 ₹2.4 L | 3,700 ₹2.7 L |
| 1.00 | OD342184/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted deptl rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site-OD
from 60.7.1 | 35.35 | cum | 1,418 ₹50,127.72 | 1,000 ₹35,351 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.99 | cum | 7,634 ₹22,818.03 | 7,750 ₹23,164.75 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 10.15 | sqm | 318 ₹3,229.29 | 250 ₹2,538.75 |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 33.61 | cum | 368 ₹12,369.58 | 400 ₹13,445.20 |
| 1.01 | OD342073/2025-2026:Providing and fixing Granite of any colour and shade for Name board, of required size laid over
base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all,
levels, including lettering & fixing | 1 | each | 2,560 ₹2,560 | 2,500 ₹2,500 |
Tender Value
Refer Docs
EMD Value
₹10,573
Closing Date
6 Nov 2025, 3:00 pmClosed
Assistant Engineer
O/o Assistant Executive Engineer,LID EW,Subdivision Kondotty
Annual Plan Kondotty BP 2025 26 Thazhethodi adungumpuram thodu samrashnam Pulikkal GP P.No30
2025_LSGD_817048_4
04/2025/AE/LID EW/KTY
Open Tender
Civil Works - Roads
180 days
KONDOTTY
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
Yes
₹10,573
Yes
9 Mar 2026
30 Oct 2025
7 Nov 2025
30 Oct 2025
6 Nov 2025
30 Oct 2025
30 Oct 2025 - 6 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1368870.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1368870.xls
BOQ • 0.30 MB
sbd.pdf
Tender Documents • 2.04 MB
Download all tender documents and submit your bid