Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.8 LAccepted-AOC NO 33 NORTH STREET LALGUDI POST TRICHY DISTRICT | LALGUDI | TRICHY | TAMIL NADU | ₹75.8 L | L1 | Accepted-AOC Agreement accepted |
| 2 | L2₹77.6 LRejected-AOC | ₹77.6 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹79.0 LRejected-AOC | ₹79.0 L | L3 | Rejected-AOC Rejected |
| 4 | L4₹80.4 LRejected-AOC NO 7 1 UDAYAR NADU STREET MELAKANDARKOTTAI TRICHY DISTRICT | TRICHY | TRICHY | TAMIL NADU | ₹80.4 L | L4 | Rejected-AOC Rejected |
| 5 | L5₹81.4 LRejected-AOC | ₹81.4 L | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RKK CONSTRUCTION L6 | gm builders L2 | MURUGESAN KRISHNA KUMAR L1 | feroxkhan L5 | D GOPALAKRISHNAN L4 | R INNACIMUTHU L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Charges for supplying and fixing Movable Steel barricading arrangements 1 inch square steel pipe 60cm below ground level and 1.20m above ground level fixing. 3 horizontal should be in 3 ties and the lowest should be 45cm above ground level and tied with new coir rope provided in all places and removing the same after the function is over (for 15 days) | 1,274.5 | RM | 425 ₹5.4 L | 389.5 ₹5.0 L | 380.48 ₹4.8 L | 408.5 ₹5.2 L | 403.75 ₹5.1 L | 396.63 ₹5.1 L |
| 1.01 | Hire charges for materials for the above item ( for 15 days) | 1,274.5 | RM | 134 ₹1.7 L | 123 ₹1.6 L | 120.15 ₹1.5 L | 129 ₹1.6 L | 127.5 ₹1.6 L | 125.25 ₹1.6 L |
| 2.00 | charges for supplying and fixing Weld mesh partition arrangements. Using Weld mesh 7.5 x 2.5cm. 10 Gauge with outer frames and M.S. angles of size 35x35x5mm for the outer frames stiffeners with 32 x 6mm M.S flat is provided qat 90cm intervals for Counting hall partition and way partition etc., including cost of nails, screws, binding wire and labour charges etc., and removing the same after counting is over | 1,309.9 | M2 | 675 ₹8.8 L | 615 ₹8.1 L | 600.75 ₹7.9 L | 645 ₹8.4 L | 637.5 ₹8.4 L | 626.25 ₹8.2 L |
| 2.01 | Hire charges for materials for the above item ( for 15 days) | 1,309.9 | M2 | 470 ₹6.2 L | 430.5 ₹5.6 L | 420.53 ₹5.5 L | 451.5 ₹5.9 L | 446.25 ₹5.8 L | 438.38 ₹5.7 L |
| 3.00 | Charges for Supplying, erection and removing G.I sheet partition for closing window's ventilators for strong Room all openings etc., complete complying with standard specification. | 2,081.9 | M2 | 393 ₹8.2 L | 360.8 ₹7.5 L | 352.44 ₹7.3 L | 378.4 ₹7.9 L | 374 ₹7.8 L | 367.4 ₹7.6 L |
| 3.01 | Hire charges for materials for the above item ( for 15 days) | 2,081.9 | M2 | 161 ₹3.4 L | 147.6 ₹3.1 L | 144.18 ₹3.0 L | 154.8 ₹3.2 L | 153 ₹3.2 L | 150.3 ₹3.1 L |
| 4.00 | Charges for supplying, fixing and removing of barricading arrangements using 10 to 13 mm dia Casurina Props 3.30m height vertically @ 75cm c/c and tied horizontally with same casurina props 5 rows tying with new coir rope and removing the same after counting is over. | 1,428 | RM | 350 ₹5.0 L | 319.8 ₹4.6 L | 312.39 ₹4.5 L | 335.4 ₹4.8 L | 331.5 ₹4.7 L | 325.65 ₹4.7 L |
| 4.01 | Hire charges for materials for the above item ( for 15 days) | 1,428 | M2 | 472 ₹6.7 L | 430.5 ₹6.1 L | 420.53 ₹6.0 L | 451.5 ₹6.4 L | 446.25 ₹6.4 L | 438.38 ₹6.3 L |
| 5.00 | Charges for Supplying, erection and removing for G.I Temporary Shed using Casurina props vertically and tied horizontally at top for purlins and fixing GI sheet above the purlins etc., complete complying with standard specifications. | 748 | M2 | 232 ₹1.7 L | 211.56 ₹1.6 L | 206.66 ₹1.5 L | 221.88 ₹1.7 L | 219 ₹1.6 L | 215.43 ₹1.6 L |
| 5.01 | Hire charges for materials for the above item ( for 15 days) | 748 | M2 | 270 ₹2.0 L | 246 ₹1.8 L | 240.3 ₹1.8 L | 258 ₹1.9 L | 255 ₹1.9 L | 250.5 ₹1.9 L |
Tender Value
₹94.6 L
EMD Value
₹58,000
Closing Date
8 Apr 2026, 3:00 pmClosed
Superintending Engineer, P.W.D., Buildings(C and M
Office of the Superintending Engineer, P.W.D., Buildings(C and M), Circle, Trichy-1
Providing Barricading Weld mesh partitionsand other security arrangements to the STRONG ROOM and COUNTING CENTRE for Lalgudi, Manachanallur, Musiri Thuraiyur Legislative Assembly Election, 2026 in Oasys Institute of Technology at Pulivalam in Trichy
2026_PWD_675497_1
Tn.70/SE/date.30.03.2026
Open Tender
Civil Works - Others
30 days
Pulivalam
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹58,000
13 Apr 2026
6 Apr 2026
9 Apr 2026
6 Apr 2026
8 Apr 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Charges for supplying and fixing Movable Steel barricading arrangements 1 inch square steel pipe 60cm below ground level and 1.20m above ground level fixing. 3 horizontal should be in 3 ties and the lowest should be 45cm above ground level and tied with new coir rope provided in all places and removing the same after the function is over (for 15 days) | - | RM | - | - | - | |
Hire charges for materials for the above item ( for 15 days) | - | RM | - | - | - | |
charges for supplying and fixing Weld mesh partition arrangements. Using Weld mesh 7.5 x 2.5cm. 10 Gauge with outer frames and M.S. angles of size 35x35x5mm for the outer frames stiffeners with 32 x 6mm M.S flat is provided qat 90cm intervals for Counting hall partition and way partition etc., including cost of nails, screws, binding wire and labour charges etc., and removing the same after counting is over | - | M2 | - | - | - | |
Hire charges for materials for the above item ( for 15 days) | - | M2 | - | - | - | |
Charges for Supplying, erection and removing G.I sheet partition for closing window's ventilators for strong Room all openings etc., complete complying with standard specification. | - | M2 | - | - | - | |
Hire charges for materials for the above item ( for 15 days) | - | M2 | - | - | - | |
Charges for supplying, fixing and removing of barricading arrangements using 10 to 13 mm dia Casurina Props 3.30m height vertically @ 75cm c/c and tied horizontally with same casurina props 5 rows tying with new coir rope and removing the same after counting is over. | - | RM | - | - | - | |
Hire charges for materials for the above item ( for 15 days) | - | M2 | - | - | - | |
Charges for Supplying, erection and removing for G.I Temporary Shed using Casurina props vertically and tied horizontally at top for purlins and fixing GI sheet above the purlins etc., complete complying with standard specifications. | - | M2 | - | - | - | |
Hire charges for materials for the above item ( for 15 days) | - | M2 | - | - | - |
stage.html
html • 0.05 MB
techsummary_811860.pdf
finsummary_811860.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_811860.xls
BOQ • 0.29 MB
ConditionOasys.pdf
Tender Documents • 2.77 MB
Download all tender documents and submit your bid