| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.9 L+₹447 (0.09%)Admitted-Finance RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L2 | Admitted-Finance | |
| 3 | L3₹4.9 L+₹842 (0.17%)Admitted-Finance P O SASINDA VILL KASHIYA P S BELDA WEST MEDINIPUR PIN 721445 | BELDA | PASCHIM MEDINIPUR | WEST BENGAL | 721445 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NITESH MANAGEMENT L2 | TECHNO FAITH L1 | BARSHA ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Drawing sample of oil from the transformer for ascertaining the acid value and submission of report for the same. | 1 | Set | 3,575 ₹3,575 Lowest | 3,575 ₹3,575 Lowest | 3,575 ₹3,575 Lowest |
| 2.00 | Drawing sample of oil from the transformer for BDV Test and submission of report for the same. | 1 | Item | 2,384 ₹2,384 Lowest | 2,384 ₹2,384 Lowest | 2,384 ₹2,384 Lowest |
| 3.00 | Disconnecting the L.T. winding of the Transformer from the terminal bushing with proper care to avoid damage. | 1 | Set | 2,980 ₹2,980 Lowest | 2,980 ₹2,980 Lowest | 2,980 ₹2,980 Lowest |
| 4.00 | Reconnecting the L.T.winding of the core with terminal bushing with proper care to avoid damages. | 1 | Set | 4,500 ₹4,500 | 4,171 ₹4,171 Lowest | 4,500 ₹4,500 |
| 5.00 | Pumping out the old damaged oil from the transformer by utlizing electric power of the campus and storing same the emty container. | 350 | Ltr. | 12 ₹4,200 Lowest | 12 ₹4,200 Lowest | 12 ₹4,200 Lowest |
| 6.00 | Lifting the top lid cover with conservator and refixing the same with supply of necessary gaskets as required. | 1 | Set | 40,288 ₹40,288 Lowest | 40,288 ₹40,288 Lowest | 40,288 ₹40,288 Lowest |
| 7.00 | Dismantling the 4 nos. L.T. terminal bushings and refixing same with necessary oil seals etc as required. | 1 | Item | 4,171 ₹4,171 Lowest | 4,171 ₹4,171 Lowest | 4,171 ₹4,171 Lowest |
| 8.00 | Washing the core and windings with forced warm oil spraying by fresh transformer oil utilizing separate electric power of the campus including time to time testing with 2.5 KV Megger for measuring of insulation resistance. | 1 | Lot | 9,000 ₹9,000 | 8,343 ₹8,343 Lowest | 9,000 ₹9,000 |
| 9.00 | Servicing the breather including filling the same by S&F. silica jel. | 1 | Item | 2,980 ₹2,980 Lowest | 2,980 ₹2,980 Lowest | 2,980 ₹2,980 Lowest |
| 10.00 | Supplying & pouring of New transformer oil for filling and topping up the transformer | 100 | Ltr. | 232 ₹23,200 Lowest | 232 ₹23,200 Lowest | 232 ₹23,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,730
Closing Date
21 Sept 2026, 2:00 pmClosed
ASSISTANT ENGINEER P.W.D
OFFICE OF THE ASSISTANT ENGINEER P.W.D BARASAT ELECTRICAL SUB DIVISION SUB STATION BUILDING, HATIPUKUR BARASAT NORH 24 PARGANAS
Overhauling, Cleaning and Servicing of 250 KVA Oil type Indoor Transformer including earthing installation in the Sub-station of the District Judges Court, Barasat, North 24 Parganas.
2026_WBPWD_5022514_1
142/T of 25-26 4th Call of AE/BESD
Open Tender
ELECTRICAL WORKS ORG
Item Rate
7 days
Barasat
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,730
1 Oct 2026
7 Sept 2026
23 Sept 2026
7 Sept 2026
21 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drawing sample of oil from the transformer for ascertaining the acid value and submission of report for the same. | 1 | Set | 37 | ₹37 |
| 2 | Drawing sample of oil from the transformer for BDV Test and submission of report for the same. | 1 | Item | 39 | ₹39 |
| 3 | Disconnecting the L.T. winding of the Transformer from the terminal bushing with proper care to avoid damage. | 1 | Set | 40 | ₹40 |
| 4 | Reconnecting the L.T.winding of the core with terminal bushing with proper care to avoid damages. | 1 | Set | 42 | ₹42 |
| 5 | Pumping out the old damaged oil from the transformer by utlizing electric power of the campus and storing same the emty container. | 350 | Ltr. | 44 | ₹15,400 |
| 6 | Lifting the top lid cover with conservator and refixing the same with supply of necessary gaskets as required. | 1 | Set | 48 | ₹48 |
| 7 | Dismantling the 4 nos. L.T. terminal bushings and refixing same with necessary oil seals etc as required. | 1 | Item | 52 | ₹52 |
| 8 | Washing the core and windings with forced warm oil spraying by fresh transformer oil utilizing separate electric power of the campus including time to time testing with 2.5 KV Megger for measuring of insulation resistance. | 1 | Lot | 53 | ₹53 |
| 9 | Servicing the breather including filling the same by S&F. silica jel. | 1 | Item | 54 | ₹54 |
| 10 | Supplying & pouring of New transformer oil for filling and topping up the transformer | 100 | Ltr. | 56 | ₹5,600 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
2911.pdf
Tender Documents • 0.43 MB
BOQ_5104075.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .