Tender Value
₹3.2 Cr
EMD Value
₹3.2 L
Closing Date
6 Oct 2026, 5:00 pm
Circle Officer
RURAL WORKS CIRCLE , SAMBALPUR
Infrastructure Development of Construction Repair and Renovation of Sohela Collage Building at Sohela under PM-USHA in the district of Bargarh for the year 2025-26
2026_CERWI_141547_1
ONLINE-RWCSBP-22/2026-27
Open Tender
Civil Works - Buildings
Percentage
450 days
Bargarh
2 documents required · 2 mandatory
₹10,000
₹3.2 L
Yes
23 Sept 2026
23 Sept 2026
7 Oct 2026
23 Sept 2026
6 Oct 2026
23 Sept 2026
23 Sept 2026 - 3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Diluting and injecting chemical emulsion (to be supplied free of cost at site of work) for PRE CONSTRUCTIONAL Anti-termite treatment and creating a continuous chemical barrier under and all-round the column pits, wall trenches, basement excavation, top perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc. complete as per specifications (plinth area of the building at ground floor only shall be measured for payment) including cost of all materials, labour, T&P etc complete in all respect and as per direction of the Engineer-in-charge. HOSTEL BUILDING Ground Floor | 302.86 | sqm | 104.5 | ₹31,649.02 |
| 2 | Diluting and injecting chemical emulsion (to be supplied free of cost at site of work) for PRE CONSTRUCTIONAL Anti-termite treatment and creating a continuous chemical barrier under and all-round the column pits, wall trenches, basement excavation, top perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc. complete as per specifications (plinth area of the building at ground floor only shall be measured for payment) including cost of all materials, labour, T&P etc complete in all respect and as per direction of the Engineer-in-charge. ADMINSTRATIVE BUILDING Ground Floor | 316.16 | sqm | 104.5 | ₹33,038.38 |
| 3 | Excavation of foundation in ordinary soil within 50m. initial lead and 1.5m. extra lift over initial lift including rough dressing and breaking clods to maximum 5cm. to 7cm. and laying in layer etc. complete in all respect as per specification and direction of Engineer-in-charge. HOSTEL BUILDING Ground Floor | 133.17 | cum | 206.06 | ₹27,440.54 |
| 4 | Excavation of foundation in ordinary soil within 50m. initial lead and 1.5m. extra lift over initial lift including rough dressing and breaking clods to maximum 5cm. to 7cm. and laying in layer etc. complete in all respect as per specification and direction of Engineer-in-charge. ADMINSTRATIVE BUILDING Ground Floor | 206.75 | cum | 206.06 | ₹42,602.91 |
| 5 | Extra lift of 1.5m or part there of over the initial lift of 1.5m in all kinds of embankments and plinth & ditches works and ordinary earth work in general.1st Extra loft of 1.5m(up to 7.5m) HOSTEL BUILDING Ground Floor | 12.42 | cum | 228.06 | ₹2,833.03 |
| 6 | Filling foundation trenches and plinth with excavated earth including laying the earth in layers not exceeding 23.5cm 9 inch thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer in charge. HOSTEL BUILDING Ground Floor | 43.68 | cum | 114.47 | ₹5,000.05 |
| 7 | Filling foundation trenches and plinth with excavated earth including laying the earth in layers not exceeding 23.5cm 9 inch thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer in charge. ADMINSTRATIVE BUILDING Ground Floor | 134.39 | cum | 114.47 | ₹15,383.34 |
| 8 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge HOSTEL BUILDING Ground Floor | 124.9 | cum | 618.53 | ₹77,257.06 |
| 9 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge ADMINSTRATIVE BUILDING Ground Floor | 308.07 | cum | 618.53 | ₹1,90,550.54 |
| 10 | Carriage of excavated earth by mechanical means within 5 KM lead HOSTEL BUILDING Ground Floor | 101.91 | cum | 278.77 | ₹28,409.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.45 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_610591.xls
BOQ • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .