Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹10.6 L
EMD Value
₹26,479
Closing Date
23 Oct 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Assistant Executive Engineer
Assistant Executive Engineer KIP LB Subdivision No 13 Kollam
Clearing Jungle and removal of floating bodies from KIP LB KBC 0 to 4000m Maravoor distri 0 to 8162m and Maravoor Minor Ch. 0 to 3175m and removal of floating bodies from LBMC from 41762to 56016m of Section No.19/13 Kollam
2026_Irrig_874398_2
IRR/PII/TR/1969/2026_5_2_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Havvabeach
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹26,479
13 Oct 2026
13 Oct 2026
26 Oct 2026
13 Oct 2026
23 Oct 2026
13 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1KBC, Maravoor & Maravoor Minor Distributories | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 14,028 | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 23,590 | sqm | - | - |
| 1.003 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 4 | each | - | - |
| 1.004 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | - | - |
| 1.005 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 3 | each | - | - |
| 1.006 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 82.65 | cum | - | - |
| 2Removal of floating bodies | |||||
| 2.001 | OD2416/2026-2027:Engaging man coolies for removal of floating materials from canal where ever necessary during
water distribution and removal of silt and slipped earth at salient points for smooth flow in the
canal as directed by the departmental officers at site. | 511 | no | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBDR.pdf
Tender Documents • 3.13 MB
BOQ_1494229.xls
BOQ • 0.30 MB
NITR.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .