Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
31 Aug 2026, 3:00 pm
The Executive Engineer, Division No-I, AMC
O/O the Executive Engineer, Division No-I, AMC
Construction of Marriage Hall near Hoara River under AMC, Phase-I
2026_SAMC_76182_1
41/EE/DIV-I/AMC/2026-27
Open Tender
Civil Works
Percentage
120 days
Agartala
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,000
₹2.9 L
21 Aug 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) includingdressing of sides and ramming of bottoms, lift upto 1.5 m,including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | 1 | cum | 231.6 | ₹231.37 |
| 2 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I Sand filling | 0.2 | cum | 1,177.3 | ₹235.46 |
| 3 | Providing and laying dry flat brick flooring in required pattern complete. | 0.6 | sqm | 701.2 | ₹420.02 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | 0.2 | cum | 10,570.6 | ₹2,114.12 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level:- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 1 | cum | 11,693.5 | ₹11,681.81 |
| 6 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | sqm | 1,311.8 | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level:- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 12,073.8 | - |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or
more | - | kg | 103.9 | - |
| 9 | First class brick work in foundation and plinth
including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 0.8 | cum | 9,845.2 | ₹7,876.16 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies,shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement 1:1.5:3 ( 1 Cement: 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 13,584.5 | ₹13,570.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_77553.xls
BOQ • 0.26 MB
DNITMarriagehall.pdf
Tender Documents • 4.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].