| 1 | L1₹63.5 LAccepted-AOC 2162 SECTOR 1 4 NEAR URBAN HEALTH CENTER HISAR 125001 | HISAR | HARYANA | 125001 | ₹63.5 L | L1 | Accepted-AOC LOA |
| 2 | L2₹66.1 LRejected-Finance 0 GOPALPUR TERASI BHAGALPUR BIHAR 853204 | BHAGALPUR | BIHAR | 853204 | ₹66.1 L | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | S R Enterprises L2 | J S R CONSTRUCTION CO. L1 |
|---|---|---|---|---|---|
| 1.00 | SITC of ACSR 3 SWG (435 plus 330 plus 1230) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). | 1,995 | Metre | 67 ₹1.3 L | 37 ₹73,815 |
| 2.00 | SITC of T/F Plateform Set with J-Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). | 6 | Each | 9,000 ₹54,000 | 7,477 ₹44,862 |
| 3.00 | SITC of PCC Pole 11 Mtr. Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ). | 86 | Each | 7,700 ₹6.6 L | 6,977 ₹6.0 L |
| 4.00 | SITC of Stay set 8 mtr long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). | 33 | Each | 1,800 ₹59,400 | 1,207 ₹39,831 |
| 5.00 | SITC of ACSR 50mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ). | 1,350 | Metre | 67 ₹90,450 | 57 ₹76,950 |
| 6.00 | SITC of GSL No. 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge the work ( As per UHBVN Specification ). | 130 | Kg. | 105 ₹13,650 | 87 ₹11,310 |
| 7.00 | SITC of MS Angle Iron 50*50*6 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ). | 2,500 | Kg. | 107 ₹2.7 L | 327 ₹8.2 L |
| 8.00 | SITC of Stay wire required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). | 370 | Kg. | 105 ₹38,850 | 87 ₹32,190 |
| 9.00 | SITC of MS Flat 50*6mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). | 500 | Kg. | 105 ₹52,500 | 70 ₹35,000 |
| 10.00 | SITC of MS nuts and bolts off size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). | 300 | Kg. | 110 ₹33,000 | 67 ₹20,100 |
Tender Value
₹64.0 L
EMD Value
₹1.3 L
Closing Date
21 Aug 2025, 5:00 pmClosed
NAVEEN RATHEE
ED - Ambala
approaches of ROB with provision of LHS in Lieu of level X-ing no. 97-C/3E (Pansara fatak) at Railway Km. 208/21-23 between Kalanaur Yamuna Nagar Block section of Saharanpur-Ambala DFCC route in Yamuna Nagar (Pdg HT LT line shifting) (OPZ No.124, 167
2025_HRY_464167_1
2025AC63F019 F119 43B6 A433 90B73A2095B5663BAR
Open Tender
Civil Works
350 days
Ambala Cantt
approaches of ROB with provision of LHS in Lieu of level X-ing no. 97-C/3E (Pansara fatak) at Railway Km. 208/21-23 between Kalanaur Yamuna Nagar Block section of Saharanpur-Ambala DFCC route in Yamuna Nagar (Pdg HT LT line shifting) (OPZ No.124, 167
2 documents required · 2 mandatory
₹5,000
₹1.3 L
Yes
16 Dec 2025
8 Aug 2025
22 Aug 2025
9 Aug 2025
21 Aug 2025
9 Aug 2025
Amount
SITC of ACSR 3 SWG (435 plus 330 plus 1230) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of T/F Plateform Set with J-Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of PCC Pole 11 Mtr. Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Stay set 8 mtr long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of ACSR 50mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of GSL No. 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge the work ( As per UHBVN Specification ).
SITC of MS Angle Iron 50*50*6 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Stay wire required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS Flat 50*6mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS nuts and bolts off size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS Channel 100*50 off size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS Channel 75*40*6mm2 off size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT Insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT Fuse Unit Board required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Disc insulator for Stay required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 11 KV GO Switch complete for 11 mtr pole required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Suspension Clamp complete for required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Danger Plate complete for required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Earthing Set complete with GI Pipe 25*6 complete for required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Barbed Wire complete with GI Pipe 25*6 complete for required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 11 KV LA set required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 11KV pin insulator with pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of HT XLPE UG Cable 185mm2 with TR required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of HT XLPE UG Cable 95mm2 with TR required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of HT XLPE UG Cable 50mm2 with TR required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of HT Outdoor Cable Box 185mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of HT Outdoor Cable Box 95mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of HT Outdoor Cable Box 50mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 2C PVC Cable 10MM2 armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT 3.5/C Cable 120mm2 Un-Amd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT 4/C Cable 25 MM2 un Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT 4/C Cable 16 MM2 un Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT 4/C Cable 50 MM2 un Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT 3.5/C Cable 300 MM2 un Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT 3.5/C Cable 95 MM2 un Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT AB Cable 120 plus 70 MM2 required to the complete including labour job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of ACSR 80mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of ACSR 30mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of ACSR 50mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of H Pole Structure complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of 25/63 KVA T/F with pole mounting S/Stn complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of 100/200 KVA T/F with pole mounting S/Stn complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of 2/C pvc up to 20 mtr complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of 4/C Cable up to 20 mtr complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of Three Phase Meter With MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of HT Dead End complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of LT Dead End complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of GO Switch complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of LT CT Meter with LT CT and MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of PCC Pole 9 Mtr Long complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of LT AB Cable 50 plus 35mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of LT AB Cable 95 plus 70mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of PCC Pole 11 Mtr Long complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of HT Cable U/G 50mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of HT Cable U/G 95mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of v Shape complete the job all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of Top Hammer complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of Pin Insulator With Pin complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of Disc Insulator complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of Iron Scrap complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Fabrication Charges of steet items includin painting and Transportation Charges upto site of work complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of 25/63 KVA T/F with pole mounting S/Stn complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of 100/200 KVA T/F with pole mounting S/Stn complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of Single Phase meter with MCBcomplete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of 3 Phase meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of LT cable Joint complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of LT CT Meter with LT CT and MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of Earthing Strip 25*6mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of Muffing of PCC Pole complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of Single Phase Meter With MCB complete job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
S R Enterprises (BID ID -1320861)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid