Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.5 CrAccepted-AOC LEIMAKHONG BAZAR P O MANTRIPUKHRI DIST KANGPOKPI MANIPUR 795002 | KANGPOKPI | MANIPUR | 795002 | ₹11.5 Cr | L-1 | Accepted-AOC L1 Bidder |
| 2 | L-2₹14.1 CrRejected-Finance | ₹14.1 Cr | L-2 | Rejected-Finance Rejected. Other than L-1 |
| 3 | L-3₹14.7 CrRejected-Finance CHALIHA NAGAR DIST TINSUKIA ASSAM | TINSUKIA | ASSAM | ₹14.7 Cr | L-3 | Rejected-Finance Rejected. Other than L-1 |
| 4 | Rejected-Technical SRIKONA POTAPOLA CHHAKA CHANDIPUR ROAD BALASORE ODISHA 756025 | BALASORE | BALESHWAR | ODISHA | 756025 | - | - | Rejected-Technical Rejected Being Overloaded as per Note No 01 of NIT |
| 5 | Rejected-Technical GATANGA MISSION CHARALI TEZPUR 784154 ASSAM | SONITPUR | ASSAM | 784154 | - | - | Rejected-Technical Rejected Being Overloaded as per Note No 01 of NIT |
| Sl No | Description | Qty | Unit | INTERIOR DECCOR L2 | VIJAY AGARWAL & SONS L3 | M/S YAIPHABA ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00BUILDINGS & STRUCTURE (Sch 'A' PART-I) | ||||||
| 1.01 | Lump sum price worked out by the Contractor for “Design, Construction, Fabrication and Erection of PEB Structure for SPORTS COMPLEX, RCC framed structure for Ancilleries for Gymnasium and RCC framed structure Gallery / Corridor for Gymnasium with and including (Pile foundation if design requirment), with and including internal sevices (Internal Water Supply, plumping and internal Electrification as per Annexure-I & II of Sch 'A' Part- I), Soil Investigation (Annexure-II of Sch 'A' Part- I), Synthetic flooring with shock absorbing, Movable Poles and allied work for four number badminton court and Gymnasium, with and incuding accessories as per SAI , and BWF , complete as mentioned in Conceptual / Line Plan drawings , DBR and scope of work complete all as specified and shown on drawing and other documents of the Tender and as mentioned in Annexure-I to VIII of Sch 'A' Part-I.
NOTE: SCHEDULE 'A' PART I (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amoun in the Green coloured field under Col-6 only. | 1 | COMPLETE JOB | 12,71,00,000 ₹12.7 Cr | 13,50,00,000 ₹13.5 Cr | 10,33,68,000 ₹10.3 Cr |
| 2.00EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | ||||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.8,62,448.08 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 9,48,699.89 ₹9.5 L | 8,62,448.08 ₹8.6 L | 8,10,701.2 ₹8.1 L |
| 3.00ROAD & HARDSTANDING (Sch 'A' PART-III) | ||||||
| 3.01 | Lump sum price worked out by the Contractor for “(ROAD & HARDSTANDING)” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.56,73,670.56 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 70,92,088.2 ₹70.9 L | 56,73,670.56 ₹56.7 L | 61,84,300.3 ₹61.8 L |
| 4.00SEWAGE DISPOSAL (Sch 'A' PART-IV) | ||||||
| 4.01 | Lump sum price worked out by the Contractor for “(SEWAGE DISPOSAL)” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.1,79,244.48 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 2,24,055.6 ₹2.2 L | 1,79,244.48 ₹1.8 L | 1,86,414.25 ₹1.9 L |
| 5.00AREA DRAINAGE (Sch 'A' PART-V) | ||||||
| 5.01 | Lump sum price worked out by the Contractor for “(AREA DRAINAGE)” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 12,49,260.24 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 15,61,575.3 ₹15.6 L | 12,49,260.24 ₹12.5 L | 12,49,500 ₹12.5 L |
Updated dates
Tender Value
₹14.4 Cr
EMD Value
₹10.4 L
Closing Date
2 Feb 2026, 6:00 pmClosed
CE SILIGURI ZONE
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA, DIST JALPAIGURI, PIN 734 008 (WB)
PROVN OF SPORTS COMPLEX IN TEZPUR MILITARY STATION UNDER GE (N) TEZPUR
2025_MES_743443_1
98820/TEZ(N)/SZ/E8
Open Tender
Civil Works
540 days
TEZPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE (N) TEZPUR
₹10.4 L
Yes
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA
30 Mar 2026
6 Dec 2025
9 Feb 2026
6 Dec 2025
2 Feb 2026
3 Jan 2026
6 Dec 2025 - 15 Dec 2025
17 Dec 2025
BUILDINGS & STRUCTURE (Sch 'A' PART-I)
Lump sum price worked out by the Contractor for “Design, Construction, Fabrication and Erection of PEB Structure for SPORTS COMPLEX, RCC framed structure for Ancilleries for Gymnasium and RCC framed structure Gallery / Corridor for Gymnasium with and including (Pile foundation if design requirment), with and including internal sevices (Internal Water Supply, plumping and internal Electrification as per Annexure-I & II of Sch 'A' Part- I), Soil Investigation (Annexure-II of Sch 'A' Part- I), Synthetic flooring with shock absorbing, Movable Poles and allied work for four number badminton court and Gymnasium, with and incuding accessories as per SAI , and BWF , complete as mentioned in Conceptual / Line Plan drawings , DBR and scope of work complete all as specified and shown on drawing and other documents of the Tender and as mentioned in Annexure-I to VIII of Sch 'A' Part-I. NOTE: SCHEDULE 'A' PART I (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amoun in the Green coloured field under Col-6 only.
EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II)
Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.8,62,448.08 inserted by the MES in Schedule ‘A’ Part-II.
ROAD & HARDSTANDING (Sch 'A' PART-III)
Lump sum price worked out by the Contractor for “(ROAD & HARDSTANDING)” as listed in Schedule ‘A’ Part-III. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.56,73,670.56 inserted by the MES in Schedule ‘A’ Part-III.
SEWAGE DISPOSAL (Sch 'A' PART-IV)
Lump sum price worked out by the Contractor for “(SEWAGE DISPOSAL)” as listed in Schedule ‘A’ Part-IV. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.1,79,244.48 inserted by the MES in Schedule ‘A’ Part-IV.
AREA DRAINAGE (Sch 'A' PART-V)
Lump sum price worked out by the Contractor for “(AREA DRAINAGE)” as listed in Schedule ‘A’ Part-V. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 12,49,260.24 inserted by the MES in Schedule ‘A’ Part-V.
EXTERNAL WATER SUPPLY (Sch 'A' PART-VI)
Lump sum price worked out by the Contractor for “(EXTERNAL WATER SUPPLY)” as listed in Schedule ‘A’ Part-VI. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.61,837.05 inserted by the MES in Schedule ‘A’ Part-VI.
EXTERNAL ELECTRIFICATION (Sch 'A' PART-VII)
Lump sum price worked out by the Contractor for “(EXTERNAL ELECTRIFICATION)” as listed in Schedule ‘A’ Part-VII. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 9,01,840.34 inserted by the MES in Schedule ‘A’ Part-VII.
LIGHTENING PROTECTION AND OBSTRUCTION LIGHT (Sch 'A' PART-VIII)
Lump sum price worked out by the Contractor for “(LIGHTENING PROTECTION AND OBSTRUCTION LIGHT)” as listed in Schedule ‘A’ Part-VIII. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs.3,29,081.60 inserted by the MES in Schedule ‘A’ Part-VIII.
HOT WATER SUPPLY & AIR CONDITIONING (Sch 'A' PART-IX)
Lump sum price worked out by the Contractor for “(HOT WATER SUPPLY & AIR CONDITIONING)” as listed in Schedule ‘A’ Part-IX. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 21,725.40 inserted by the MES in Schedule ‘A’ Part-IX.
AIR CIRCULATORS AND HIGH BAY LIGHTS (Sch 'A' PART-X)
Lump sum price worked out by the Contractor for “(AIR CIRCULATORS AND HIGH BAY LIGHTS)” as listed in Schedule ‘A’ Part- X. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,00,420.00 inserted by the MES in Schedule ‘A’ Part-X.
MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (Sch 'A' Part-XI)
EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT Bringing approved Earth may be mixed with granules / pebbles not exceeding 40 mm size (as approved by Garrison Engineer) from sources outside defence land including all cost such as royalty if any, transportation, taxes if any etc. complete all as specified and directed. NOTE :- (a) Earth required for the item shall be supplied by contractor from outside of MOD land at any lead, at his own arrangement. (b) All cost of procurement of earth including cost of transportation, compaction royalties, tax etc shall be deemed to be included in the unit rate quoted by the contractor. (c) Forming embankments / filling in low lying areas including raising (or lowering) earth, spreading in layers not exceeding 30 cm thick, watering ramming / rolling and finishing of required size, shape etc not exceeding 1.5 m high from base / natural ground level. (d) With reference to Clause 3.6 of MES Schedule Part-II on Serial Page No. 21, it is clarified that measurement of the above item shall be of finished embankment / traverse of filled earth after consolidation / compaction and 5% deduction shall be made from measured and calculated volume to allow for increase in bulk. (e) Total quantity / partial quantity of earth may not be available in Tezpur Area. The contractor shall bring the earth outside area and it is advised to quote the rate considering available of soil and its lead involved.
䘀㈁鸀⸅ࠁ䕓䅗䕇䐠卉佐䅓ੌ潃獮牴捵楴湯漠敓瑰捩琠湡 潦〱‰獕牥⥳挠湯敶瑮潩慮祴数敤楳湧摥琠慣牲⁹敳慷敧愠摮猠汵慬敧眠瑡牥硥慣慶楴湯椠湡⁹祴数漠潳汩䍐⁃㨱㨴‸敢潬⁷潦湵慤楴湯牂捩慷汬删䍃䴠㌭‰湩删潯汓扡†瑥楷桴嘠湥⁴桳晡⁴慭桮汯灯湥湩獧眠瑩潣敶潣湮捥楴湯攠捴Ⱞ挠浯汰瑥楷桴攠晦捥楴敶搠灥桴漠⸱〳洠瑥牥挠浯汰瑥污獡猠潨湷漠䑔搠慲楷杮潎䌠卅⽚〲㤱启ⵄㄱ‵桓敥獴ㄠ㐯琠⼴‴湡楤敲瑣摥ਮ低䕔㨠丠捥獥慳祲䔠牡桴潷歲猠慨汬戠湩汣摵摥椠桴畱瑯摥爠瑡0.ʕȈ䔀员剅䅎⁌䅗䕔⁒啓偐奌䴊䰦映牯挠湯瑳畲瑣潩景瘠污敶瀠瑩漠湩整湲污猠穩㈱‰浣砠ㄠ〲挠⁸㈱‰浣眠瑩湯牢捩桴捩牢捩慭潳
M&L 150mm bore,HDPE double wall corrugated(DWC) SN-8 PIPE (HDPE Black Pipe) WITH COUPLER Conforming to IS:16098 Part-II:2013 sewage pipes laid in trenches and jointed as per manufacturer,s instruction with and including all fitting complete all as specified and as directed.
Providing and fixing factory-made, light-duty, Steel Fibre Reinforced Concrete (SFRC) manhole cover with frame, conforming to IS 12592 (Part I & II): 2002, including loading, unloading, transportation, placing in position, bedding in cement mortar (1:3), curing, finishing and complete in all respects as per the direction of the Engineer-in-Charge
Labour only for cutting of CI/DI/GI pipe 50 to 150 mm dia carefully in position for repairs or inserting new fittings such as valve, bend, tee, socket pieces, collar etc complete all as specified and directed.
Material and labour for horizontal boring under roads/path for insertion of pipes upto 150mm bore by manual/machine drilling/ complete all as specified and directed. (i) All the precaution to be taken by the contractor before drilling the bore. The contractor has to take plan of existing cables any type and pipe line in existing area before drilling the bore. (ii) Any damage to existing cables any type and pipe line in the way of drilling the bore will be repaired and make good by the contractor within 24 hours. No extra cost will be paid in this account. (iii) Contractor has to get the survey of route, length and depth for boring before quoting the rate.
er with operating temperature between 100⁰C to 110⁰C including fixing by grouting and fastener with and including 2 nos stainless steel braided flexible connection pipe for hot and cold water supply for geyser, 15 mm bore, 450 mm length, 12 bar working pressure complete all as specified and as directed. Make : JAQUAR/USHA/AO-SMITH or Equivalent make. Item Continued as 11.21ҥ0ҩ/Ҭ.ӯ0̔̈一呏⁅ⴺ⠊⥩䌠湯牴捡⁴桳污畳浢瑩琠敨戠潲档牵景朠祥敳楷桴搠瑥楡整档楮慣灳捥晩捩瑡潩湡慴敫愠灰潲慶景䜠⁅敢潦敲瀠潲畣敲敭瑮ਮ椨⥩䄠汬挠癩汩眠牯敲畱物摥漠楳整映牯栠湡楧杮琠敨朠祥敳湡潴洠歡潧摯琠慭捴桴畳晲捡獡攠楸瑳湩潴戠潤敮戠⁹潣瑮慲瑣牯眠瑩潨瑵愠祮攠瑸慲挠獯⠊楩⥩䄠汬琠敨渠捥獥慳祲愠捣獥潳楲獥愠摮吠倦爠煥極敲漠楳整映牯椠獮慴汬瑡潩景朠祥敳桳污敢瀠潲楶敤祢挠湯牴捡潴⠊癩 潃瑮慲瑣牯猠慨汬猠扵業⁴桴慭畮慦瑣牵牥眠牡慲瑮⁹慣摲琠桴敤慰瑲敭瑮戠晥牯汣楡業杮瀠祡敭瑮琠敤慰瑲敭瑮⠊⥶䤠硥牴慣汢倨䍖椠獮汵瑡摥猠敨瑡摥㈠㔮匠浱⁸′潣敲挠灯数潣摮捵潴⥲爠煥極敲湯猠瑩潦硥整獮潩景攠敬瑣楲畳灰祬挠湯敮瑣潩牦浯䜠祥敳潴䴠瑥污倠畬潳正瑥琠敨猠浡用瑰″瑭⥲猠慨汬戠牰癯摩摥戠⁹桴潣瑮慲瑣牯眠瑩潨瑵愠祮攠瑸慲挠獯 Ѐ⼀܀⸀
Horizontal boring for passing GI protection pipe up to 100 mm bore (dia), under road/ foot path, not exc. 10.00 metre in a single length, with and including GI water tubing , medium grade, galvanised coated steel tube conforming to IS 1239 (Part-1): 2004 including all fittings complete all as specified and as directed.Note : (i) All the precaution to be taken by the contractor before drilling the bore. The contractor has to take plan of existing cables any type and pipe line in existing area before drilling the bore. (ii) Any damage to existing cables any type and pipe line in the way of drilling the bore will be repaired and make good by the contractor within 24 hours. No extra cost will be paid in this account. (iii) Contractor has to get the survey of route, length and depth for boring before quoting the rate.
Supply and fix Exhaust Fan, 230 volts, single-phase, 600 mm sweep,1400RPM, complete with self-closing louvers, mounting frame, guard and all accessories as required. Motor shall be totally enclosed, capacitor-start, induction-run type suitable for 230 V ±10%, 50 Hz AC supply. The fan shall conform to IS 2312: 1967 and connecting up including provision of PVC insulated, sheathed round flexible wire with multi stranded copper conductor of size 2.50 Sq mm, 3 core, 1100 Volts grade, from ceiling rose/ connector to fan complete all as specified and directed.
BLANK
Supply Installation, fixing, testing and commissioning of Split Air conditioner unit of 2.0 TR capacity (split type unit comprising of indoor and outdoor unit white colour) electric driven, Signal Phase, 230 Volt (220-240 Volt), 50 Hz and with inbuilt air ioniser and plasma fitter for better indoor air quality, having latest model of AC with 5 Star BEE rating, having ISEER value not less than 4.5 Wh, Split AC, having rotary compressor, having Round tube Plate fin copper tube condensor with hydrphillic coating for better protection of condenser from corrosion with R-32 refrigerant (non CFC gas), having dehumidefication feature, copper tubing, including necassary fixing arrangement complete (indoor unit at suitable place and hight inside the room and outdoor unit at suitable place outside the room) including metallic bracket as per OEM recommendation with and including fixing bolts, anchore fashner for fixing bracket for mounting outdoor unit, insulated piping,making all electrical connections etc from Power supply socket to AC unit by providing suitable size PVC insulatated sheathed copper conductor cable size not less than 4 Sqmm x 3 core, with remote feature complete all as specified and directed by Eng in Charge. Make : CARRIERS/ O General / Hittachi / Daikin.
Supply, installation, testing and commissioning of copper-wound voltage stabilizer, ISI-marked, suitable for automatic operation, single-phase, naturally air-cooled, indoor type. The unit shall be designed for input variation between 130 V and 280 V with output voltage stabilized at 230 V ±2.5%. The stabilizer shall include high- and low-voltage cut-out, time delay feature and shall have a capacity not less than 4 KVA. Complete with all necessary electrical connections as specified and directed by Engineer-in-Charge.
Supply, installation, testing and commissioning of copper-wound voltage stabilizer, ISI-marked, suitable for automatic operation, single-phase, naturally air-cooled, indoor type. The unit shall be designed for input variation between 130 V and 280 V with output voltage stabilized at 230 V ±2.5%. The stabilizer shall include high- and low-voltage cut-out, time delay feature and shall have a capacity not less than 5 KVA. Complete with all necessary electrical connections as specified and directed by Engineer-in-Charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_832518.xls
BOQ • 0.28 MB
Drawings.rar
Additional Documents • 12.70 MB
Complete_Tender_Except_BOQ.pdf
Tender Documents • 8.12 MB
Download all tender documents and submit your bid