Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20,167Accepted-AOC | 1 | Accepted-AOC First lowest | |
| 2 | 2₹22,170+₹2,003 (9.93%)Rejected-AOC | 2 | Rejected-AOC Second lowest |
| Sl No | Description | Qty | Unit | Linto Varghese L2 | CHRISTIN BAIJU C L L1 |
|---|---|---|---|---|---|
| 1.00Cuting trees and branches | |||||
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 1 | each | 2,450 ₹2,450 | 2,233 ₹2,233 Lowest |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 1 | each | 11,360 ₹11,360 | 10,366 ₹10,366 Lowest |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 22 | each | 380 ₹8,360 | 344 ₹7,568 Lowest |
Tender Value
₹22,154
Closing Date
14 Aug 2025, 5:00 pmClosed
Assistant Executive Engineer
IIP Subdivision No 2 Angamaly
IIP-Trees-Emergency-Cutting down trees and branches of trees standing dangerously on IIP staff quarters and pump house compound Angamaly
2025_Irrig_782260_1
1/ET/AEE II/IIP/2025-26
Open Tender
Civil Works - Others
Item Rate
14 days
Angamaly
Please refer Tender documents.
7 documents required · 7 mandatory
₹335
Yes
Yes
3 Sept 2025
4 Aug 2025
18 Aug 2025
4 Aug 2025
14 Aug 2025
4 Aug 2025
Amount
Cuting trees and branches
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
Linto Varghese (BID ID -2288067)
Bidder Name
Linto Varghese
CHRISTIN BAIJU C L
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1283358.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .