| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAccepted-AOC 26 98 2ND FLOOR RAILWAY BAZAR RAILWAY BAZAR RAILWAY BAZAR HALDWANI NAINITAL UTTARAKHAND 263139 UDYAM UK 07 0004605 | NAINITAL | UTTARAKHAND | 263139 | ₹6.5 Cr | L1 | Accepted-AOC Contract Awarded of M/s Hills Trading Company vide Letter No.30316/Abut of Modu br TCC-maza and TCC-Taksing/23TF/58/E8 dated 27 Jan 2024 |
| 2 | L2₹7.3 Cr+₹74.3 L (11.4%)Rejected-Finance | ₹7.3 Cr+₹74.3 L (11.4%) | L2 | Rejected-Finance Not Found L1 Bidder |
| 3 | L3₹7.5 Cr+₹99.0 L (15.2%)Rejected-Finance | ₹7.5 Cr+₹99.0 L (15.2%) | L3 | Rejected-Finance Not Found L1 Bidder |
| 4 | L4₹7.6 Cr+₹1.1 Cr (17.4%)Rejected-Finance ITANAGAR LOWER NITI VIHAR ITANAGAR PAPUMPARE ARUNACHAL PRADESH 791111 | PAPUM PARE | ARUNACHAL PRADESH | 791111 | ₹7.6 Cr+₹1.1 Cr (17.4%) | L4 | Rejected-Finance Not Found L1 Bidder |
| 5 | L5₹7.8 Cr+₹1.3 Cr (19.6%)Rejected-Finance | ₹7.8 Cr+₹1.3 Cr (19.6%) | L5 | Rejected-Finance Not Found L1 Bidder |
Tender Value
₹7.1 Cr
EMD Value
₹6.8 L
Closing Date
19 Jan 2024, 12:00 pmClosed
HQ Chief Engineer (P) Arunank
HQ CE (P) Arunank (GREF), Dam site, Naharlagun, AP
CONST OF ABUTS BASED, R/WALLS, W/ WALLS, R/WALL, D/WALL T/WALL OF MODUL BRS AT KM 10.220(110FT), KM 17.500 (130FT), KM 34.612 (120FT), KM 45.505 (100FT), KM 48.400 (130FT), KM49.290 (130FT) ON TCC-TAKSING RD AT KM 7.600 (130FT) ON TCC-MAZA RD 128 RCC
2023_BRO_633447_1
ANK/NIT-16/2023-24 2nd Call
Open Tender
Civil Works
Works
180 days
On TCC-Taksing and TCC-MAZA RD
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹6.8 L
Yes
HQ Chief Engineer (P) Arunank
10 Apr 2024
19 Dec 2023
20 Jan 2024
19 Dec 2023
19 Jan 2024
3 Jan 2024
21 Dec 2023 - 28 Dec 2023
29 Dec 2023
Amount
CONSTRUCTION OF ABUTMENTS (VARIOUS SIZES I.E. HEIGHTS, WIDTHS & SPANS) BASED ON APPROVED DRAWINGS, RETAINING WALLS, WING WALLS, RETURN WALL, DIRT WALL & TOE WALL AS PER GROUND REQUIREMENT OF MODULAR BRIDGES AT KM 10.220 (110 FT), KM 17.500 (130 FT), KM 34.612 (120 FT), KM 45.505 (100 FT), KM 48.400 (130 FT) AND KM 49.290 (130 FT) ON TAMA CHUNG CHUNG- TAKSING ROAD AND AT KM 7.600 (130 FT) ON TAMA CHUNG CHUNG- MAZA ROAD (SEC-II) UNDER 128 RCC/ 23 BRTF/PROJECT ARUNANK IN UPPER SUBANSIRI DISTRICT IN THE STATE OF ARUNACHAL PRADESH Construction of Abutments (various heights, widths , spans and locations) as per approved drawings, Retaining Wall, Wing walls, Return walls, Dirt wall & Toe wall as per ground requirement/ground data at Km 10.220 (110 Ft), Km 17.500 (130 Ft), Km 34.612 (120 Ft), Km 45.505 (100 Ft), Km 48.400 (130 Ft) and Km 49.290 (130 Ft) on Tama Chung Chung- Taksing Road and At Km 7.600 (130 Ft) on Tama Chung Chung- Maza Road (Sec-II), Special conditions, Particular specifications of the tender documents as directed by Department, construction of work includes erection of staging / shuttering, temporary river training works / diversions, wing walls, return walls, dirt walls, Retaining Walls and all other items of works required and necessary for the complete construction of abutments of modular bridges.
M/S A L TRADING AGRNCY
DM ENGINEERINH
M/S ARUNACHAL TRADE & COMMERCIAL AGENCY
M/s Hachang Tachang
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .