Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 CrAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹34.1 Cr+₹1.7 Cr (5.39%)Rejected-Finance | L2 | Rejected-Finance Higher rate quoted than lowest bidder | |
| 3 | L3₹36.9 Cr+₹4.5 Cr (13.9%)Rejected-Finance BHAGAWATI COLONY GATE NO 9 REFINERY NH 2 MATHURA U P 281005 | MATHURA | MATHURA | UTTAR PRADESH | 281005 | L3 | Rejected-Finance Higher rate quoted than lowest bidder | |
| 4 | L4₹37.1 Cr+₹4.7 Cr (14.6%)Rejected-Finance | L4 | Rejected-Finance Higher rate quoted than lowest bidder | |
| 5 | Rejected-Technical 128 B BLOCK AD SHALIMAR BAGH POORVI NEW DELHI DELHI 110 088 | DELHI | NORTH WEST DELHI | DELHI | 110088 | - | Rejected-Technical Technically non responsive |
Tender Value
₹47.1 Cr
EMD Value
₹47.1 L
Closing Date
26 Mar 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er Suresh Kapoor
Office of Chief Engineer NH HP PWD Shimla 2
Maintenance works and activities PBMC on section from km 20 to km 78 of NH No 907A in the State of Himachal Pradesh
2024_MoRTH_797019_1
PW-CE-NH-CTR-Tender Notice/PBMC/2024-6508-14
Open Tender
Civil Works - Highways
Percentage
1825 days
Nahan
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
RPAO Chandigarh
₹47.1 L
Office of Chief Engineer NH HP PWD Shimla 2
22 Jul 2024
22 Feb 2024
27 Mar 2024
22 Feb 2024
26 Mar 2024
11 Mar 2024
5 Mar 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ROUTINE MAINTENANCE (Lump sum) (for Total 60/84 months) as per BILL No. 1 mentioned in uploaded RFP | 1 | Lump sum | 10,11,63,600 | ₹10,11,63,600 |
| 2 | INITIAL RECTIFICATION WORKS (Lump sum) (to be completed within 06 months from the notice to proceed) as per BILL No. 2 mentioned in uploaded RFP | 1 | Lump sum | 7,05,30,485 | ₹7,05,30,485 |
| 3 | PERIODICAL MAINTENANCE WORKS (Lump sum) (to be completed as decided by the Engineer but overlay of Highway to be completed within 24/48 month (as the case may be) from the date of notice to proceed as per BILL No. 3 mentioned in uploaded RFP | 1 | Lump sum | 27,58,08,560 | ₹27,58,08,560 |
| 4 | EMERGENCY WORKS (Unit Rates) as per BILL No. 4 mentioned in uploaded RFP | 1 | Lump sum | 2,33,86,777 | ₹2,33,86,777 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_837777.xls
BOQ • 0.23 MB
140150352.pdf
Tender Documents • 0.11 MB
140150354.html
Tender Documents • 0.03 MB
PBMCNahan.pdf
Tender Documents • 2.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .