| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance | -30.44% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹21.4 L+₹6.5 L (43.8%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹21.4 L+₹6.5 L (43.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹21.4 L+₹6.5 L (43.8%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹21.4 L+₹6.5 L (43.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹21.4 L+₹6.5 L (43.8%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹21.4 L+₹6.5 L (43.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹21.4 L+₹6.5 L (43.8%)Admitted-Fee/PreQual/Technical/Finance AT KATHUAREDI PO BENTAPUR PS BRAHMAGIRI DIST PURI ODISHA | PURI | PURI | ODISHA | +0.00% | ₹21.4 L+₹6.5 L (43.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.4 L
EMD Value
₹21,500
Closing Date
21 May 2026, 5:30 pmClosed
SUPERINTENDING ENGINEER, PURI IRRIGATION DIVISION,
OFFICE OF THE SE, PURI IRRIGATION DIVISION, PURI, AT-SECHAN VIHAR, PO-SHREE VIHAR, PURI 752003
Construction of Bridge over Kanas Branch Canal at RD 4.755Km. Near village Bhaula.
2026_CELBB_128735_32
e Procurement Tender Call Notice No. PID-01 of 2026-27
Open Tender
Civil Works - Canal
Percentage
180 days
PURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹21,500
Yes
31 May 2026
7 May 2026
22 May 2026
7 May 2026
21 May 2026
7 May 2026
7 May 2026 - 21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing cost of situ 400mm dia double under reamed piles (6 Mtr. Long pile) drives to required depth below the ground levels as per specification with R.C.C. M-25 using 20mm size and downgraded hard crusher broken granite chips excluding cost of steel rod MS Rod as hall with CI core in RCC bore holes of required size including cost, carriage ,royality and all other taxes and labour charges etc. Complete as per direction of the Engineer-in-Charge. | 72 | One Rmt. | 1,861.56 | ₹1,34,032.32 |
| 2 | Cement concrete M-25 using 20mm size hard crusher broken granite chips from approved quarry for road work free from weathered skin surface, dust and all other deleterious materials including cost, carriage, royalty and taxes of materials to the site of work and mixing by mechanical means with hoisting, laying concrete in position and compacting by late vibrator including curing upto required period etc. Complete as per direction of Engineer-in-Charge. | 50.63 | One Cum | 7,027.4 | ₹3,55,797.26 |
| - | Providing weep holes in brick masonary/plain/reinforce concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV 20H towards drawing face including cost carriage & royalty of all materials etc. Complete as per direction of Engineer-in-Charge. | 12 | One No. | 148.68 | ₹1,784.16 |
| 4 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. (RCC Column, Beam) | 154.45 | One Sqm | 1,205.69 | ₹1,86,218.82 |
| 4.1 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. (RCC Slab) | 72.44 | One Sqm | 756.22 | ₹54,780.58 |
| 4.2 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. (WALL) | 41 | One Sqm | 1,075.12 | ₹44,079.92 |
| 5 | Labour charges for straighting, cutting, bending, binding and tying the grils and placing in position for fabrication and finishing of reinforcement including topping when necessary including supply of binding wire 18 to 20 gauge with all leads, lifts from binding yard including cost, carriage of un coated HYSD bar confirming to Fe 415 grade including over lapping, and wastage, welding etc. Complete as per direction of the Engineer-in-Charge. | 70.83 | One Sqm | 9,579.13 | ₹6,78,489.78 |
| - | Earth work in excavation of foundation in all kinds of soil by manual means/mechanical means with all leads, lifts & delifts including leveling and dressing the foundation bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth including bailing out water and dewatering if required etc. Complete as per direction of Engineer-In-Charge. | 120.46 | One Cum | 206.06 | ₹24,821.99 |
| - | Filling foundation and plinth with sand including watering & ramming with all labour and T&Ps with all leads, lifts and delifts including cost carriage & royalty of all materials etc. Complete as per direction of Engineer-in-Charge | 14.4 | One Cum | 723.97 | ₹10,425.17 |
| - | Cement concrete (1:3:6) using 4cm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. Complete as per direction of Engineer-in-Charge. | 26.9 | One Cum | 6,556.12 | ₹1,76,359.63 |
stage.html
html • 0.03 MB
finance_589589.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.84 MB
PID33OF202627.pdf
Tender Documents • 12.10 MB
BOQ_589589.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .