Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | -33.33% | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 L+₹10,777.51 (3.31%)Admitted-Finance | -31.12% | ₹3.4 L+₹10,777.51 (3.31%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 L+₹39,403.74 (12.1%)Admitted-Finance | -25.25% | ₹3.6 L+₹39,403.74 (12.1%) | L3 | Admitted-Finance |
| 4 | L4₹3.7 L+₹40,622.91 (12.5%)Admitted-Finance | -25.00% | ₹3.7 L+₹40,622.91 (12.5%) | L4 | Admitted-Finance |
| 5 | L5₹3.8 L+₹55,253.01 (17.0%)Admitted-Finance | -22.00% | ₹3.8 L+₹55,253.01 (17.0%) | L5 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,753
Closing Date
31 Aug 2026, 2:00 pmClosed
Executive Engineer,KID
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
Emergent 10 (Ten) nos ghoge repairing at Sundarban Embankment damaged due to new Moon Kotal on and from 11.08.2026 to 15.08.2026 for a length of 100.00 m in between Ch 7.00 km and ch 8.50 Km, Ch 16.30 Km to ch 16.310 Km,Ch 14.00 km and ch 14.50 Km
2026_IWD_5020343_18
WBIW/EE/KIDIVISION/e-SNIT- 12 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
10 days
Kakdwip
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,753
Yes
10 Sept 2026
26 Aug 2026
1 Sept 2026
26 Aug 2026
31 Aug 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length). | - | Mtr. | 34.56 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | - | Mtr. | 13.11 | - |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Mtr. | 26.22 | - |
| 4 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:-Volume of earth / sand filled bags should not be less than 0.028 cum / bag. | - | Each | 8.34 | - |
| 6 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 7 | Earthwork in closing ghoges in embankments including cutting, filling, puddling with water and ramming including all leads and lifts, if necessary. | - | Cum | 128.71 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_5094902.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .