Environment Engineer
Supply, Delivery, Testing, Commissioning & Comprehensive Operation and Maintenance Contract for 5 (Five) Years of Truck Mounted Mist Machine (With Appx.8000 Ltr. Tank Capacity) 03 Nos. as per RMC tender specifications, scope of work & terms - conditions under 15th Finance Commission Grant.
305385
RMC/SWM/2026-27/01
Open
Solid Waste Management
Works
Rajkot
₹15,000
RAJKOT MUNICIPAL CORPORATION
₹7.4 L
15 May 2026
15 May 2026
15 May 2026
6 Jun 2026
15 May 2026
(Technical bid)
4 Name of the work Supply, Delivery, Testing, Commissioning & Comprehensive
Operation and Maintenance contract for 5 (Five) Years of Truck
Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity)
Nos. As per RMC tender specifications, scope of work & terms -
conditions under 15th Finance Commission Grant.
5 Tender fees Rs. 15000/- to be submitted in the form of D.D. favour of
(Non Refundable) Municipal Commissioner, Rajkot of any Nationalized
Bank/Schedule bank/Banks mentioned in RMC circular and
payable at Rajkot; as per milestone date to be submitted to the
Office of "Solid Waste Management Department, Rajkot
Municipal Corporation, “Dr.Ambedkar Bhavan” Dhebarbhai
Road, Rajkot – 360 001".
6 E.M.D. Rs. 7,35,850/- (Rs. Seven Lakh Thirty Five Thousand Eight
Hundred Fifty Only); to be submitted in the form of D.D. in
favour of Municipal Commissioner, Rajkot of any Nationalized
Bank/Schedule bank/Banks mentioned in RMC circular and
payable at Rajkot ; as per milestone date to the Office of "Solid
Waste Management Department, Rajkot Municipal
Corporation, “Dr.Ambedkar Bhavan” Dhebarbhai Road, Rajkot
7 Pre bid meeting As Per Milestone Dates
8 Time Limit For Supply As per tender documents.
9 General Condition As per tender documents.
10 Performance Security As per tender documents.
11 Mode of Sending The By Registered A.D. or Speed Post addressed to, Office of
Tender Fee, EMD etc. Environment Engineer, Solid Waste Management Department,
Relevant Documents Third Floor, Room No.03, Rajkot Municipal Corporation,
“Dr.Ambedkar Bhavan” Dhebarbhai Road, Rajkot – 360 001".
1.0 TENDER NOTICE Supply, Delivery, Testing, Commissioning &
Comprehensive Operation and Maintenance contract for 5 (Five) Years of
Truck Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity)‐03 Nos.
As per RMC tender specification, scope of work & terms ‐ conditions under
15th Finance Commission Grant.
1. The Municipal Commissioner, RAJKOT Municipal Corporation, invites
detailed bid from interested parties for the Supply, Delivery, Testing,
Commissioning & Comprehensive Operation and Maintenance contract
for 5 (Five) Years of Truck Mounted Mist Machine (with appx. 8000 Ltr.
Tank Capacity) ‐ 03 Nos. As per RMC tender specification, scope of work
& terms ‐ conditions under 15th Finance Commission Grant.
2. Sealed tenders, for the above work are invited from the bidders. The
bidders shall be a single entity bidding for the Project. Detailed PQ criteria
are mentioned in tender. All necessary documentary evidence shall be
submitted along with the tender.
GENERAL DETAILS OF WORKS
Name of work: Supply, Delivery, Testing, Commissioning &
Comprehensive Operation and Maintenance contract for 5 (Five) Years of
Truck Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity) ‐
Nos. As per RMC tender specification, scope of work & terms ‐
conditions under 15th Finance Commission Grant.
Tender Fee (Non‐refundable) and EMD :‐
Sr. Name Of Tender Tender Fee EMD Rs.
1 Supply, Delivery, Testing, Commissioning & 15000/- 7,35,850/-
Comprehensive Operation and Maintenance contract
for 5 (Five) Years of Truck Mounted Mist Machine
(with appx. 8000 Ltr. Tank Capacity) ‐ 03 Nos. As per
RMC tender specification, scope of work & terms ‐
conditions under 15th Finance Commission Grant.
Last date of submission of online bid as per milestone date through E
tendering only,
Address for submission of the Tender fee, EMD and supporting tender
Environment Engineer
Solid Waste Management
3rd Floor, Room No.03,
Rajkot Municipal Corporation,
“Dr.Ambedkar Bhavan” Dhebarbhai Road,
DOWNLOAD OF TENDER DOCUMENT
The tender document for these work are available on website
www.rmc.gov.in or https://tender.nprocure.com
The bidder shall pay the Tender Fee to the Rajkot Municipal Corporation
and shall have to attach the Demand draft/Pay order issued by any
Nationalized Bank/Schedule bank/Banks mentioned in RMC circular, in
favour of Municipal Commissioner, payable at Rajkot shall be attached
with the Pre-qualification Document.
EARNEST MONEY DEPOSIT
The aforesaid BID must be accompanied by the EARNEST MONEY
DEPOSIT as specified in ‘General Details of Work’ section above. The Bid
Security shall be in form of a crossed demand draft/pay orders in favour of
“The Municipal Commissioner; Rajkot Municipal Corporation of any
Nationalized Bank/Schedule bank/Banks mentioned in RMC circular and
payable at Rajkot
SUBMISSION OF TENDER
The completed Tender document shall be submitted at the following
address & price bid through online only.
Tender copy must be accompanied by EMD in the form of Demand draft/
Pay order of Nationalized Bank/Schedule bank/Banks mentioned in RMC
circular only in favour of Municipal Commissioner, Rajkot. The tenders not
submitted in line with the tender clauses and without Tender fee and EMD
in the form specified, will be out rightly rejected. The Technical bid of only
those bidders will be evaluated who have remitted tender fees and
OPENING OF TENDER
The Technical bid of package will be opened as mentioned in ‘General
Detail of Work’ Section above, if there is any change, same will be
conveyed to tenderers. Intending bidders or their authorized
representative who wish to participate in tender opening can remain
present on the due date and time. Price Bids / Financial bids of only those
bidders will be opened, who are successful in the qualification Criteria and
the Technical Evaluation. The date for price bid opening shall be informed
to the successful bidders at a later date after evaluation of technical bids.
- Tender (a complete set of bidding document) fee shall be Rs.15,000/- in the form of
Demand Draft/ Pay Order from any Nationalized Bank/Schedule bank/Banks
mentioned in RMC circular in favour of MUNICIPAL COMMISSIONER,
Rajkot, payable at Rajkot, which shall be non refundable. The fees shall be paid on as
per milestone dates to the Office of Environment Engineer, Solid Waste Management
Department, Third Floor, Room No.03, Rajkot Municipal Corporation,
“Dr.Ambedkar Bhavan” Dhebarbhai Road, Rajkot – 360
- The tenders are uploaded on RMC’s website www.rmc.gov.in or
https://rmctender.nprocure.com.
- Interested Bidders fulfilling the qualifying criteria shall fill online tender on https : //
rmc.tender.nprocure.com up to as per milestone dates of tender document to Office
of Environment Engineer, Solid Waste Management Department, Third Floor, Room
No.03, Rajkot Municipal Corporation, “Dr.Ambedkar Bhavan” Dhebarbhai Road,
- All bids must be accompanied by Bid Security of the amount specified for
the Works in the above Table payable at Rajkot and drawn in favour of
RAJKOT MUNICIPAL CORPORATION, Rajkot. Bid Security will have to
be in any one of the forms as specified in the tender documents.
- All Relevant supporting Documents of Bids must be delivered to Office of
Environment Engineer, Solid Waste Management Department, Third Floor, Room
No.03, Rajkot Municipal Corporation, “Dr.Ambedkar Bhavan” Dhebarbhai Road,
‐ Information for online participation
Internet site address for e-Tendering activities will be
https://rmc.tender.nprocure.com
Interested bidders can view detailed tender notice and download tender
documents from the above mentioned website.
Bidders who wish to participate in online tender have to register with the
website through the “New User Registration” link provided on the home
page. Bidder will create login id & password on their own in registration
Bidders who wish to participate in this tender need to procure Digital
Certificate as per Information Technology Act-2000 using that they can
digitally sign their electronic bids. Bidders can procure the same from any
of the CCA approved certifying agencies, or they may contact (n) code
Solution at below mentioned address and they will assist them in
procuring the same. Bidders who already have a valid Digital Certificate
need not to procure the same. In case bidders need any clarification
regarding online participation, they can contact
URL: https://tender.nprocure.com.
Bidders who wish to participate in e-Tender need to fill data in predefined
forms of tender fee, EMD, PQ (Technical) or experience details and Price
Bidder should upload scan copies of reference documents in support of
their eligibility of the bid.
After filling data in predefined forms bidders need to click on final
submission link to submit their encrypted bid. Bidder should also submit
Document Fees, EMD, Technical bid document (those which are not
uploaded) & Reference Documents in hard copy to the department.
GENERAL INSTRUCTIONS
1. The cost of Bid document i.e. tender fees will not be refunded under any
2. EMD in the form specified in Bid document only shall be accepted.
3. The offer shall be valid for 120 days from the date of opening of Technical
4. Tender offers without tender fees, Earnest Money Deposit (EMD) and
which do not fulfil all or any of the condition or submitted incomplete in
any respect will be rejected.
5. Conditional tender shall not be accepted. Municipal Commissioner, Rajkot
reserves the right to accept or reject such tenders without assigning any
reason thereof.
6. Tenderers should carefully fill in the rates against the items mentioned in
the schedule and scrutinize them before submitting the tender. Any
variation in rates etc. will not be allowed on any ground such as mistake or
misunderstanding etc. after the tender has been recommended or accepted.
7. The tenderers shall have to necessarily quote the rate for supply, services
&/or work asked for in the tender and in E price bid only On (n)procure
8. Tenderers shall have his registered office with telephone. Tenderer having
experience in similar works and good track record shall be given
preference while considering the tenders. Tenderers shall furnish the date
on which the firm was established, the names of all the partners
constituting the firm with their residential addresses and experience in
similar works. Tenderers having telephones at the residence of the
proprietor shall state the same in the tender.
9. Municipal Commissioner decision will be final and abiding to all for
accepting or rejecting and any interpretation of terms of the tender.
10 In case the tenderers will try to do any type of corrupt procedure like
writing letters/ e-mails/phone calls/Personal visits to the officers of the
Municipal Corporation or any one after prize bid open will be liable for
punishment procedure
11. As per the Bombay Stamp Rules Act 1958, Appendix 1, Article 5, the
successful bidder shall enter in to an Agreement with the Corporation on
Rs. 300 Stamp Paper/Value as per new norms.
12. Bidders shall submit necessary registration certificate like GST number
registration copy & any other if required for execution of such work as per
government rules along with tender document.
13. Municipal Commissioner, Rajkot reserves the right to accept or reject any
or all tenders without assigning any reason thereof. This Tender notice
shall form a part of contract document. The tenderers are advised to read
carefully the “Instructions to suppliers” and “Qualification Criteria”
contained in the tender documents.
Contractor’s Sign ENVIRONMENT ENGINEER
With seal SOLID WASTE MANAGEMENT
RAJKOT MUNICIPAL CORPORATION
INSTRUCTIONS TO SUPPLIERS
1.0 Rajkot municipal corporation invites tender for Supply, Delivery, Testing,
Commissioning & Comprehensive Operation and Maintenance contract for
5 (Five) Years of Truck Mounted Mist Machine (with appx. 8000 Ltr. Tank
Capacity) - 03 Nos. As per RMC tender specification, scope of work &
terms - conditions under 15th Finance Commission Grant.
2.0 The requirement of Supply, Delivery, Testing, Commissioning & Comprehensive
Operation and Maintenance contract for 5 (Five) Years of Truck Mounted
Mist Machine (with appx. 8000 Ltr. Tank Capacity)-03 Nos. As per RMC
tender specification, scope of work & terms - conditions and their detailed
technical specifications, scope of work etc are set out in Appendix
Interested and qualified parties, based on qualification criteria set out in
Appendix 2, (Online) are requested to submit information about bidder
and a financial Quotation / price bid in a manner prescribed in Appendix
& 4 (Online only). Tenderer has to submit various other details as per
format / details asked for in the Annexure 1 to
3.0 Each tenderer shall submit only one (1) Bid for each of the item, in response
to this Tender Document (TD). Any tenderer who submits more than one
Bid for the item will be disqualified.
4.0 At any time prior 72 hours to the last date and time of submission of Bids
RMC may, for any reason, whether at its own initiative or in response to
clarifications requested by any supplier, modify the TD by the issuance of
Addenda. All interested tenderer shall have to check the RMC / n procure
website. The Bidder shall not transfer the TD to another interested party.
Any reply/changes (if required), will also be declared on above website
5.0 Prebid Meeting: online queries Should be Sent via Email before Date:
All interested parties are advised to send their query for any clarifications
if they desire on E mail or by letter up to pre-bid date. All interested
bidder/s must have to submit their queries/ details for which they seek
clarifications, on or before pre-bid date up to 18.00 hrs through email or
letter on [email protected]. Any query/letter/verbal communication etc
received after pre-bid date that will not be considered.
6.0 Perpetrations of tender document: Tenderer shall carefully examine the
tender documents and fully inform themselves as to all the conditions and
matters, which may in any way effect the work or the cost Should a
Tenderer find discrepancies, error or omission from the specifications or
other documents or should he be in doubt as to their meaning, he should
address query to the concerned authority. Any resulting interpretation of
the tender documents (if required) will be issued to all Tenderers as an
addenda corrigendum. Verbal clarification and/or information given by the
Tenderer shall not be binding on the Corporation.
7.0 Modification of Documents: Modification of specifications and extension of
the closing date of the tender will be published on website only. These shall
be signed by tenderer and shall form a part of tender. If required will be
made by an addendum / corrigendum.
8.0 Addenda: Addenda form part of the contract documents and full
consideration shall be given to all addenda in the preparation, evaluation
etc. of tender. Tenderer shall verify the number of addenda issued, if, any
and acknowledge the receipt of all Addenda in the Tender. Failure to do so
may cause the Tender to be rejected.
9.0 The Bid shall remain valid for a period not less than 120 days from the date of
opening of tender i.e. technical bid (bid validity period). RMC reserves the
right to reject any Bid, which does not meet this requirement. In
exceptional circumstances, prior to expiry of the original Application
Validity Period, RMC may request Applicants to extend the Application
Validity Period for a specified additional period. Applicants not extending
the Application Validity Period when so requested would automatically be
10.0 Earnest Money Deposit (EMD)
11.0 Each Bid shall be accompanied by EMD as Under :
Sr. Name Of Tender EMD Rs.
1 Supply, Delivery, Testing, Commissioning & 7,35,850/-
Comprehensive Operation and Maintenance contract for 5 (Five)
Years of Truck Mounted Mist Machine (with appx. 8000 Ltr.
Tank Capacity) - 03 Nos. As per RMC tender specifications,
scope of work & terms - conditions under 15th Finance
Commission grant.
12.0 The EMD shall be in the form of a crossed demand draft/Pay Order/Bank
Guarantee in favour of The banks as per RMC circular, Municipal
Commissioner, Rajkot on any Nationalised/Schedule bank/Bank as per
RMC circular, Municipal Commissioner, Rajkot on any
Nationalised/Schedule bank/Bank as only, payable at Rajkot.
13.0 The EMD shall be forfeited in the following cases:
(a) If the Tenderer withdraws itʹs Bid during the interval between the Bid Due
Date and expiration of the Bid Validity Period.
(b) If the successful Tenderer fails to provide the Performance Security deposit
within the stipulated time or any extension thereof provided by RMC;
14.0 Performance Security Deposit :
15.0 On award of contract, the successful bidder (Service Provider) will have to
produce an F.D.R. or irrevocable Bank Guarantee of any Scheduled or
Nationalized Bank of 5 % of the supply cost of the work, towards the
security deposit, in favour of Rajkot Municipal Corporation, must be
submitted in the S.W.M. Branch. In case of F.D.R. submission, an agreement
deed in favour of Rajkot Municipal Corporation on the Stamp Paper of
4.90% of FDR amount must be submitted.
16.0 In case of Bank Guarantee submission, an agreement deed in favour of
Rajkot Municipal Corporation on the Stamp Paper of Rs.300/- must be
submitted and if the contractor fails to submit the agreement deed in the
stipulated time limit, the E.M.D. for this contract will be forfeited and the
contractor will be black listed for this work of RMC. This will be returned
only after successful completion of warranty period.
17.0 Formats and Signing of Bid
17.1 The Tenderer would provide all the information as per this TD. RMC
would evaluate only those Bids that are received in the required format
and are complete in all respects. Each Bid shall comprise the following:
(a) Details of the Tenderer in the format set out in Appendix 3‐ Online
(b) Qualification Criteria /Technical bid in the format set out in Appendix 2‐
(c) Financial Quotation/price bid for Supply, Delivery, Testing, Commissioning
& Comprehensive Operation and Maintenance contract for 5 (Five) Years of
Truck Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity) -
Nos. As per RMC tender specification, scope of work & terms - conditions
the format set out in Appendix 4 in online format only.
(d) Tenderer has to submit various other details and formats duly self attested
and signed as per Annexure 1 to
(f) The Bidder shall duly sign all the sheets of the Tender Document
submitted in support of their online tender.
(h) All bidders are requested to submit technical bid documents, physical with
tender technical bid (EMD, Tender fee etc) supporting documents.
18.0 The bidder shall seal the Tender fee, EMD and relevant Tender Document
submitted in support of their online tender in envelopes, which shall be
clearly marked as Supply, Delivery, Testing, Commissioning &
Comprehensive Operation and Maintenance contract for 5 (Five) Years of
Truck Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity) -
Nos. As per RMC tender specifications, scope of work & terms - conditions
along with tender number, due date of tender etc.
19.0 The Tender Document submitted in support of their online tender shall be
initialled by an authorized signatory of the Bidder or an Individual, as
20.0 Sealing and Marking of Bid for submission of Physical Tender
supporting documents:
21.0 The envelope for EMD -Tender fee and relevant supporting documents
must be super scribed with the following information:
(a) Name and Address of Tenderer;
Tender due date and time;
22.0 If the envelope is not sealed and marked as instructed above, RMC assumes
no responsibility for the misplacement or premature opening of the
contents of the Bid submitted and such Bid, may, at the sole discretion of
RMC, be rejected.
Tender shall be submitted through physical only. (On line price Bid is
23.0 RMC reserves the right not to respond to any/all queries raised or
clarifications sought if, in their opinion and at their sole discretion, they
consider that it would be inappropriate to do so or do not find any merit in
it. The response to the queries shall be uploaded only (if found appropriate
and required) on www.tender.nprocure.com & RMC website.
24.0 Bid Due Date: As mentioned in tender.
25.0 Bids should be submitted online as per milestone dates, in the manner and
form as detailed in this PD. Bid submitted by either Hard copy (not as per
format in TD), facsimile transmission or telex or email or in person will not
be accepted and such tender/s will be rejected.
26.0 RMC may, in exceptional circumstances, and at its sole discretion, extend the above
Bid Due Date by issuing an Addendum/corrigendum.
27.0 Opening of Bids and Clarifications
All information must be typed or hand written legibly in English language.
All pages of the pre-qualification document must be initialled by the
applicant. All corrections, erasures or overwriting, therein, must be
initialled by Applicant.
28.0 Technical bid will be opened as per milestone dates. RMC would open the
Bids possibly on Bid Opening Date as mentioned above in the ‘General
Description of Work’ for the purpose of evaluation, if there is any change,
same will be intimated to tenderer.
29.0 RMC reserves the right to reject any or all Bids not submitted on time and
which does not contain the information/documents as set out in tender .
30.0 To facilitate evaluation of Bids, RMC may, at its sole discretion, seek
clarifications in writing from any Tenderer regarding its Bid, and can take
information from past purchasers / customers etc as may be required.
31.0 Evaluation
The details given by the applicants in the pre qualification documents will
be evaluated as per qualifying criteria, given in tender. Rajkot Municipal
Corporation reserves the right to restrict the list of pre-qualified applicant
to any number deemed suitable by it. Rajkot Municipal Corporation’s
decision for interpretation of any term of pre qualification criteria, pre-
qualifying the applicants etc. shall be final and binding to all.
32.0 As part of the evaluation, the Bids shall be checked for responsiveness with
the requirements of the TD and only those Bids, which are found to be
responsive, would be further evaluated in accordance with the criteria, set
out in this TD.
33.0 The Bid would be considered to be responsive if it meets the following conditions:
(a) It is received /deemed to be received by the Bid Due Date including any
extension thereof.
(b) It is signed, sealed and marked as stipulated in tender.
(c) It contains all the information and documents as requested in the TD.
(d) It contains information in formats specified in this TD.
(e) It mentions the validity period as set out intender.
(f) It provides information in reasonable detail. (“Reasonable Detail” means
that, but for minor deviations, the information can be reviewed and
evaluated by RMC without communication with the Supplier). RMC
reserves the right to determine whether the information has been provided
in reasonable detail.
(g) There are no inconsistencies between the Bid and the supporting
documents. A Bid that is substantially responsive is one that conforms to
the preceding requirements without material deviation or reservation. A
material deviation or reservation is one (i.) which affects in any substantial
way, the scope, quality, or performance of the project, or (ii.) which would
affect unfairly the competitive position of other Tenderer/s presenting
substantially responsive Bids.
34.0 RMC reserves the right to reject any Bid, if:
(a) If the tender is incomplete; or
(b) At any time, a material misrepresentation is made or discovered; or
(c) The Supplier does not respond promptly and diligently to requests for
supplemental information required for the evaluation of the Bid.
35.0 In case the Bid is found to be responsive, the Bid would be evaluated in
accordance with the Qualification Criteria as set out in Appendix
36.0 In case the Bid is found to be inadequate, RMC may request the Tenderer
for supplementary information to the Bid submitted. As part of the
evaluation of the Bid, RMC may also request the Supplier to submit
clarifications.
37.0 The Financial Quotations/ Bid of only those Tenderer/s, who meet the
Qualification Criteria, would be opened.
38.0 The Tenderer offering the lowest quotation for the Supply, Delivery,
Testing, Commissioning & Comprehensive Operation and Maintenance
contract for 5 (Five) Years of Truck Mounted Mist Machine (with appx.
8000 Ltr. Tank Capacity) - 03 Nos. As per RMC tender specifications, scope
of work & terms - conditions as per formula given in tender would be
declared as the Preferred Tenderer for the same.
39.0 Tenderer has to submit the technical presentation in support of their
technical bid (if asked by RMC) with all the credentials and salient features
of their Vehicles & proposal to enable the more technical evaluation of the
available proposal, if required RMC can ask the tenderer to show the live
working of the Vehicles and based on the performance, RMC can take the
decision for technical evaluation. This will be binding to the entire bidder.
40.0 Even though agency is qualifying all the above criteria but found to be
poor in performance, in the opinion of Municipal Commissioner of RMC
and above cadre, his price bid will not be opened. It is the discretion of
Municipal Commissioner or the Tender Scrutiny Committee to
qualify/disqualify the agency or to open/not to open the price bid of
41.0 RMC may either choose to accept the Quotation of the Preferred Tenderer
or invite him for negotiations.
42.0 In case there are two or more Tenderer quoting the same price, RMC may
in such case call all such Tenderer for negotiations and select the Preferred
Tenderer on the outcome of the negotiations. The selection in such cases
shall be at the sole discretion of RMC.
43.0 In the event of acceptance of the Preferred Tenderer with or without
negotiations, RMC shall declare the Preferred Tenderer as the Successful
Tenderer. RMC will notify the Successful Tenderer through a Letter of
Award (LoA) / order that its Bid has been accepted.
44.0 This tender / order will be considered as rate contract for one Year for SITC
cum O & M of Truck Mounted Mist Machine from the date of work order
as per tender requirements and technical specifications of RMC as per
tender conditions; as per PD. Rate sanctioned will be fixed for entire one
year RC (Rate Contract) period from the date of work order. During this RC
period if RMC needs more Truck Mounted Mist Machine with O & M
contract; successful bidder has to carry out both SITC & O & M work at the
same approved rates & terms. No price escalation will be given during RC
period. Only change in taxes, duties, govt. levies will be accepted by RMC
& consider for payment. RC period may be extended for further period of
One year by mutual confirmation. Decision of The Municipal
Commissioner Shri, RMC will be final & binding to all. RMC can order for
further / extra quantity, if required during entire RC period.
45.0 Notwithstanding anything contained in this TD, Municipal Commissioner,
RMC reserves the right to accept or reject any quotation, or to annul the
bidding process or reject all quotations, at any time without any liability or
any obligation for such rejection or annulment, without assigning any
reasons thereof.
46.0 Notwithstanding above, the Municipal Commissioner of RMC, at his
discretion, may also split the contract, if require for timely execution of the
work among two of more qualified bidders. Municipal Commissioner of
RMC’s decision in this regard shall be final. Municipal Commissioner of
RMC also reserves right to award the Contract to any of the eligible and
qualified suitable Bidder. Splitting of work will be carried out based
manufacturing capacity, past work experience of the bidder, time frame for
execution of work etc and this shall be binding to all bidders. Parallel
contract, if required, can also be awarded on above basis and will be
binding to all.
47.0 However, if the RMC decide to put an end to the business relations on
breach of any conditions of the contract no such notice shall be necessary
and on event of RMC decided to put an end to the business relations on
breach of any conditions of the contract no such notice shall be necessary
and on event of RMC deciding to terminate the business, and the R.C. shall
stand terminated with immediate effect.
The R.C. can also be terminated by the Municipal Commissioner of RMC
in the following circumstances:
1) If the firm is debarred or disqualified or ceases to exist or convicted of
2) If the quality of the item to be supplied is found not up to the ISI
standard /RMC Specifications (as applicable) and found to be not of
standard quality.
3) If supply position of the firm is not satisfactory.
48.0 Whenever under this contract any sum of money is recoverable from the
RC Holder and payable to the Municipal Commissioner of RMC, Rajkot, or
an officer empowered by him shall be entitled to recover such sum by
appropriating in part of whole the Security Deposit paid by the Contractor,
if a security being insufficient or if no security has been taken from
contractor, then the balance of the total sum recoverable as the case may be
deducted from the sum due to the contractor under this or any other
49.0 If any dispute arises about the contract or any terms of contract, Municipal
Commissioner, RMC shall be the sole arbitration and his decision would be
final and binding to all the parties.
50.0 Vehicles shall be inspected / verified by Environment Engineer-SWM & / or
authorized representative/s of RMC with the specification of RMC (if
required) & on approval same shall be put in working.
51.0 The price escalation or variation clause will not be accepted. Tenderer has
to quote the total price, net including of all taxes & duties etc. and for
evaluation and finalization purpose, the total price will be taken in to
consideration. Transportation, Packing, Forwarding, Insurance charges are
included in the indicated price. However any change in the GST, Govt.
statutory levies and taxes etc. will be considered for payment at actual (for
supply and O & M work both) for which contractor will have to submit
necessary documentary proofs as required by department. No other
change will be accepted. For O & M work fuel rate change will be
considered as per the condition and formula given in the tender O & M
52.0 The technical specification and scope of work for Supply, Delivery, Testing,
Commissioning & Comprehensive Operation and Maintenance contract for
5 (Five) Years of Truck Mounted Mist Machine (with appx. 8000 Ltr. Tank
Capacity) - 03 Nos. As per RMC tender specifications, scope of work &
terms - conditions is given in Appendix
53.0 EXTENSION FOR DELAY.
If the supply is delayed by:
a) Force Majeure.
b) Abnormally bad weather, or
c) Serious loss or damage by fire
d) Civil commotion or strike or lock out of their principal workshop.
Any other cause which is beyond the contractorʹs control then upon the
happening of any such event causing delay, the contractor shall
immediately inform in writing to the Dy. M.C. (SWM) but at the same time
his best endeavours to make good the delay. The Dy. M.C. (SWM) in such
event can take the final decision regarding the late delivery penalty for
54.0 The contractor must follow all the rules and regulations pertaining to the
work, labour etc. Contractor shall have to produce Employee labor license
and P. F. license and must follow rules and regulations as amended in law.
The expense of having the license shall be borne by contractor. Contractor
has to maintain PF, ESIC, Professional tax account of their staff. RMC shall
not be responsible for the same.
55.0 PAYMENTS DUE FROM CONTRACTOR.
The Municipal Commissioner shall be entitled to recover costs, damages,
or expenses for which under the contract, the contractor is liable to the
Rajkot Municipal Corporation from any money due or becoming due to
the contractor under the contract or Municipal Commissioner will have the
liberty to recover the amount from the contractor.
56.0 Payment Terms: ‐
As mentioned in Appendix-1
57.0 PQ criteria are mentioned in Appendix-2.
58.0 The Municipal Commissioner of RMC shall, in addition to his powers
under other clauses to terminate the contract, have powers to terminate his
liability there under of the time by giving one month’s (or such shorter
period as may be mutually agreed) notice in writing to R.C. holder of his
desire to do so and upon expiry of the notice, the contract shall be
terminated without prejudice to the right accrued to the date of the
59.0 Successful bidder has to use all virgin material for fabrication/
manufacturing of the ordered item/material and has to submit all necessary
proofs like Invoice copies of material purchased, test reports etc as per
RMC requirements.
60.0 Contractor shall make payment to their employee/ workers through bank system
61.0 RMC based on prevailing practice of controlling air pollution in the city,
can increase/decrease the work quantum even after award of work & from
the running contract at any time. No compensation for reduction in work
will be given in any way. This shall be binding to the contractor/s.
62.0 No Compensation for Alteration in or Restriction of Work If at any time
after the commencement of the work, the Rajkot Municipal Corporation
shall for any reason whatsoever not require the whole or part of
work/supply thereof as specified in the tender to be carried out, the RMC
shall give notice in writing of the fact to the contractor, who shall have no
claim to any payment or compensation whatsoever on account of any
profit or advantage which he might have derived from the execution of the
work/supply in full, but which he did not derive in consequence of the full
amount of the work/supply not having been by reason of any alterations
having been made in the original specifications, drawings, designs and
instruction which shall not involve any curtailment of the works as
originally contemplated.
63.0 The Municipal Commissioner, Rajkot Municipal Corporation reserves the
right to reject all or any of the tender including the lowest tender or part of
the tender which in the judgment of the Municipal Commissioner, Rajkot
Municipal Corporation does not appear to be in the best interest of Rajkot
Municipal Corporation and the contractor shall have no cause of action or
claim against the Rajkot Municipal Corporation, its officers, employees,
successors, or assignees for rejection of his tender
64.0 The activity is under essential service, contractor is not allowed to stop this
work at any point of time. If the contractor fails to start the work on time
after issue of work order, then EMD of the contractor shall be forfeited and
if the agency is found to be poor in performance for carrying out awarded
work or Notwithstanding, if contractor stop/leave the work by his own
discretion then performance Security Deposit of the contractor shall be
forfeited and additional expenditure for execution of remaining work shall
be recovered through, if be needed, legal proceeding and Agency shall be
debarred / blacklisted subject to approval of competent authority.
65.0 Tenderer has to submit all the relevant information likes;
Company & Model details for Vehicles quoted
Availability of local service point.
Warranty conditions
Detailed client list to which such type of Vehicles / Vehicles have
been supplied by them.
Details of Technical experience of tenderer (Supply and O & M
Performance certificates as per tender requirements.
66.0 Special Conditions
a) The bidder has to make the invoices in the name of RMC.
b) Bidder has to instruct the dealers/ O & M work contractor to
render after sale service for the supplies made, and copy of the
same to be enclosed with bid if service will be provided through
dealer network. Even in such circumstances all liabilities will rest
on supplier only.
c) The tenderer shall be fully responsible for taking delivery of
Vehicles from the manufacturer/dealer of Vehicles and in no way
any kind of relaxation will be given if there is any problem with
the Vehicles received. The tenderer should see that the design of
equipment should be such that which comply all prevailing
RTO/any other Govt authority norms (if any) in Rajkot city for
such type of Vehicles
d) The tenderer must quote for complete job (Supply and O & M).
The tenderer that does not include the complete job as specified in
schedule of tender (specification, scope of work etc.) will be
rejected. The successful bidder shall be responsible for taking
timely delivery of Vehicles from Vehicles supplier if quoted by
service provider. The successful bidder shall be responsible for
any fault, shortfall in the Vehicles proposed in the tender etc or
any other requirement which is mandatory for the completion of
successful equipment manufacturing.
e) It will be the responsibility of the tenderer to collect the
Vehicles/chassis from the regional sales office/ depot / port / doc
etc of the manufacturer & / or their authorized dealer and
transport the same to delivery location. Any charges applicable for
the same shall be included in the tender offer. Chassis shall be
billed on name of Municipal Commissinor, RMC by chassis
manufacturer for which successful tender has to complete
necessary procedure.
f) Tenderer has to design the Vehicles as per the requirements of
RMC; keeping in mind the RTO / other Govt. agencies norms
applicable in City of Rajkot for such type of Vehicles and according
to the same they have to supply the fully built unit to RMC, SWM.
Failure at any part will be contractorʹs responsibility and will have
to bear the cost.
g) The successful tenderer will be fully responsible for the safety and
security of the Vehicles when in their possession during the
delivery, testing, commissioning stage and even during the entire
O & M contract period.
h) Tenderer has to quote for Model having latest emission norms
BS-VI (min). Only those Model will be consider for evaluation for
which any Indian (as per prevailing norms in India for such
Vehicles) approval certificates attached with tender. Decision for
selection of model will be taken by RMC as per the requirements
and will be final and binding to all bidders.
i) Necessary design and final approval from RTO / other govt.
agencies (as required) as per latest norms and rules is tenderʹs
responsibility. If tenderer is failed to comply the rules of RTO
/other govt. agencies (if any) and submit the required documents
for their supplied Vehicles, same will be rejected by RMC.
j) If tenderer is/are company who is operating through authorised
service dealer/ service provider then they have to clearly mention
the order and payment modus of operandi for the tender if
awarded to them ,later on subletting of the work will not be
allowed. Necessary documentary proof/s shall be attached with
k) The contractor shall ensure that the supervisors and cleaners are
all mentally stable, and are able to communicate properly. They
should not pose any hazard to the general public. Contractor must
have to pay the salary through banks to the workers, drivers and
other workforce regularly and contractor shall be fully responsible
l) This is subject to the jurisdiction of the competent court of Rajkot
only. In case of any claim, dispute of difference arising in respect of
a contract, the cause action thereof shall be deemed to have arisen
in Rajkot and all legal proceedings in respect or any such claim,
dispute or difference shall be instituted in a competent court in
jurisdiction of Rajkot city only.
Contractor’s Sign ENVIRONMENT ENGINEER
With seal SOLID WASTE MANAGEMENT
RAJKOT MUNICIPAL CORPORATION
Rajkot Municipal Corporation
Supply, Delivery, Testing, Commissioning & Comprehensive Operation and
Maintenance contract for 5 (Five) Years of Truck Mounted Mist Machine (with
appx. 8000 Ltr. Tank Capacity) ‐ 03 Nos. As per RMC tender specifications, scope
of work & terms ‐ conditions under 15th Finance Commission.
The number of Supply, Delivery, Testing, Commissioning & Comprehensive
Maintenance contract for 5 (Five) Years of Truck Mounted Mist Machine (with
appx. 8000 Ltr. Tank Capacity)-03 Nos. As per RMC tender specification, scope of
work & terms - conditions. However, actual number which will be ordered will be
at the sole discretion of RMC.
Tender Validity period
The Validity period is 120 days from the date of technical bid opening.
Tenderer has to carry out Design of Vehicles on Minimum BS - VI chassis/ as per
the latest applicable norms of RTO at the time of delivery of completed Vehicles
and other govt. agencies (as required) in Rajkot and Gujarat, keeping in mind the
requirements- specifications of RMC; otherwise it will not be accepted.
Procurement period (i.e. Delivery Period)
The total procurement period is 90 (or as per delivery schedule mentioned in
supply order) days. However, delivery period will commence from the date of
invoice of chassis to the unit (rear Mist Machine unit) manufacturer by chassis
supplier. However unit manufacturer must have to issue complete procurement
order (as per the requirement of chassis supplier) to the chassis supplier
immediately within 7 days from the date of receipt of RMC order. Otherwise late
delivery will be considered for such delay period.
Delivery Schedule
As per requirement, RMC will give delivery schedule (if delivery required in
staggered manner/delay) to the successful bidder. The price quoted as per
Appendix 4, will be valid for the entire rate contract period, which will be binding
to the Tenderer.
Delivery location: Rajkot, Gujarat at site specified by RMC
For Supply part:
(1) For Chassis: 100% of the Chassis payment as per the invoice (as per the
approved rate in the tender) of Chassis manufacturer / debit note of dealer
will be issued to successful tenderer on receipt of chassis at fabricatorʹs
Factory premise against debit note / invoice and all supporting documents
submission by contractor. (chassis shall be directly procured on name of
Municipal Commissioner, RMC) Tenderer has to submit necessary
documents as required by department. Chassis Invoice shall be on name of
Municipal Commissioner, RMC, Rajkot only.
(2) For supply of equipment (for rear Mist Machine unit); preferably after
Delivery at our SWM Store; RMC, preferably within 45 days.
For Operation and Maintenance contract :
Every monthly against satisfactory work, as per certificates of various
authorities as mentioned in the tender.
The Security Deposit for supply part will be paid back only after the
completion of supply warranty period and O & M contract part after successful
completion of contract period without any interest.
Transit Insurance
The Supplier is responsible for transit and all other insurances (as / if required) till
the tools/ Vehicles and equipment are delivered at the location mentioned in the
Procurement Order.
The Supplier warrants that the Goods supplied under this Contract are new,
unused, of the most recent or current models and those they incorporate all recent
improvements in design and materials unless provided otherwise in the Contract.
The Supplier further warrants that all Goods supplied under this Contract shall
have no defect arising from design, materials or workmanship (except when the
design and/or material is required by the Purchaserʹs Specifications) of from any
act or omission of the Supplier, that may develop under normal use of the supplied
Goods in the conditions prevailing in the country of final destination.
This supply warranty shall remain valid for 12 months after the Goods or any
portion thereof as the case may be, have been delivered to and accepted at the final
destination indicated in the Contract or as specifically mentioned in the work order.
The Purchaser shall promptly notify the Supplier in writing of any claims arising
under this warranty. Upon receipt of such notice, the Supplier shall, within 15 days
and with all reasonable speed, repair or replace the defective Goods or parts
thereof, without cost to the Purchaser.
If the Supplier, having been notified, fails to remedy the defect(s) within the period
specified above, the Purchaser may proceed to take such remedial action as may be
necessary, at the Supplierʹs risk and expense and without prejudice to any other
rights which the Purchaser may have against the Supplier under the Contract.
Items supplied by contractor must have minimum warranty of 12 months from the
date of delivery against any manufacturing defects etc.
Tender Evaluation for Lowest Bidder:
The decision of lowest rate will be on the basis of sum of rates quoted for Supply
part A and O & M work Part B for all 03 (Three) Machines.
Total Cost A=Net cost of each machine X 03 machines
Cost of O & M work will be calculated on the basis of total 365 days working for
(Five) years contract period with following formula:
Per Shift (8 Hours Rate of tenderer)
Total Cost B=Per Shift Rate per machine of tenderer X 365 days X 5 (Five) years x
COMBINE COST OF A + B =…………..
The tenderer whose total cost/Combine cost (A+B) (based on above formula) will
be lowest will be considered as first lowest tenderer.
PERFORMANCE SECUTRITY GUARANTEE
for Supply of Vehicles:
As a contract performance security, the contractor shall furnish performance
guarantee for supply part in the form of Bank Guarantee (as per RMC rules) or by
Demand draft/ pay order within 15 days from the date of order for the amount at
least 5 % of the ordered amount from any Nationalized Bank/Schedule bank/Banks
mentioned in RMC circular and made payable to the ʺMunicipal Commissioner,
Rajkot Municipal Corporationʺ payable at Rajkot. If any delay, necessary action will
be taken by RMC and will be binding to successful tenderer.
The performance guarantee shall be returned to the contractor without any interest
on the successful completion of the warranty period, when the contract ceases to be
under any obligation.
Vehicles supplied by contractor must have warranty of 12 months from the date of
delivery against any manufacturing defects etc.
For O & M contract work:
For Operation and maintenance contract work, Contractor has to submit
performance security deposit which shall be 5% of the one year O & M contract
work amount based on daily 8 hrs working shift approved rate as a contract
performance security. This guarantee (BG) shall be renewed timely (every yearly)
till expiry of contract. The contractor shall furnish performance guarantee in the
form of Bank Guarantee (as per RMC rules) or by 5% of the one year O & M
contract work amount based on daily 8 hrs working shift approved rate as a
contract performance security in form of FDR for 5 (Five) Years within 15 days from
the date of order from any Nationalized Bank/Schedule bank/Banks mentioned in
RMC circular and made payable to the ʺMunicipal Commissioner, Rajkot
Municipal Corporationʺ. Payable at Rajkot which shall be released after the
successful completion of the contract period, subject to no due certificate from the
Corporation, if any amount is due from the contractor even after adjusting from
monthly bills, the same will be recovered from this amount. If any delay, necessary
action will be taken by RMC and will be binding to successful tenderer.
‐ Forfeiture of Security money: ‐ Security amount in full or part may be forfeited
in the following cases:‐
When any terms and conditions of the contract are breached
When tenderer fails to make complete supply, installation, commissioning and
testing of the equipments/Vehicles and carry out o & m work satisfactorily as
per scope of work and conditions.
The decision of the Municipal Commissioner, RMC in this regard shall be final.
Notwithstanding the provisions of tender, the Supplier shall not be liable for
forfeiture of its performance security, liquidated damages or termination for
default, if and to the extent that, its delay in performance or other failure to
perform its obligations under the Contract is the result of an event of Force
For purposes of this Clause, ʺForce Majeureʺ means an event beyond the control of
the Supplier and not involving the Supplierʹs fault or negligence and not
foreseeable. Such events may include, but are not limited to, acts of the Purchaser
either in its sovereign or contractual capacity, wars or revolutions, fires, floods,
epidemics, quarantine restrictions and freight embargoes.
If a Force Majeure situation arises, the Supplier shall promptly notify the Purchaser
in writing of such conditions and the cause thereof. Unless otherwise directed by
the Purchaser in writing, the Supplier shall continue to perform its obligations
under the Contract as far as is reasonably practical, and shall seek all reasonable
alternative means for performance not prevented by the Force Majeure event.
TAXES AND DUTIES: ‐
Prices quoted must be inclusive of all & all taxes.
GST (Goods & Service Tax) has come in existence from 1st July, 2017. Contractor/
successful bidder is bound to pay any amount of GST prescribed by the Govt. Of
India as per the terms of contract agreed upon during the course of execution of
During the course of execution of contract, if there is any change in rate of GST
(Goods and Service tax) by the government, the same shall be
reimbursed/recovered separately by RMC, subject to the submission of original
receipt /proof for the amount actually remitted by the successful Tenderer/
Contractor to the competent authority along with the certificate from Chartered
Accountant of contractor/successful bidder certifying that the amount of GST paid
to the government and the same shall be intimated/ submitted/ claimed within
(thirty) days from the date of payment.
Remittance of GST within stipulated period shall be the sole responsibility of the
successful bidder/contractor, failing which, RMC may recover the amount due,
from any payable dues with RMC and decision of Municipal Commissioner shall
be final and binding on the contractor/successful bidder in this regards.
Further, the non‐payment of GST to the government may lead to the termination of
contract and forfeiture of Security deposit/performance guarantee amount.
2% TDS will also be deducted as GST TDS, as per prevailing rules/norms.
If imposition of any new taxes/ duties/levies/cess or any other incidentals etc or any
change in the existing taxes/ duties/levies/cess or any other incidentals etc
(Including GST) and imposed during the course of the contract, the same shall be
considered at actuals for payment purpose. Necessary documents shall be
submitted by tenderer as required by RMC.
Taxes and duties
Shall be included in the indicated price. Tenderer has to quote the one unit price,
net including of all taxes, GST & duties etc. and Per Shift Per Machine Rate for O &
M including G.S.T (If Applicable) for evaluation and finalization purpose, the total
price will be taken in to consideration. Transportation, Packing, Forwarding,
Insurance charges, third party inspection fee (0.45 % of total supply cost+ G.S.T.)
and RTO Charges are included in the indicated price. However any change in the
GST, govt. statutory levies will be considered at actual for which contractor will
have to submit necessary documentary proofs as required by department.
The bidder will have to make arrangement including lodging, boarding,
Transportation for inspection of the Vehicles by Third Party along with RMC
Official, before delivery, at factory site as required. Inspection of the Vehicles
system will also be carried out at RAJKOT at delivery site specified by RMC. If any
discrepancy is found in the material supplied and technical specifications
approved, the same lot shall be rejected and bidder will collect rejected material
within seven days. No claim for the rejected material shall be entertained.
Truck Mounted Mist Machine‐will also be carried out at Rajkot at site specified by
RMC (if required). If any discrepancy is found in the material supplied and
technical specifications approved, the same lot shall be rejected and bidder will
collect rejected material within seven days. No claim for the rejected material shall
be entertained.
Liquidated damages for delay
Supplier in accordance with the schedule specified in the tender shall make
delivery of the equipments.
An unexcused delay by the supplier in the supply of its delivery obligations,
supplier will be hold liable and RMC can take actions to forfeit of his performance
security, imposition of liquidated damages and/or termination of the contract by
If the supplier fails to deliver any or all of the equipments within the said period,
RMC shall deduct from the contract price as liquidated damages (Late delivery
penalty) will be calculated on the basis of delayed days for delayed quantum
(delayed work amount) of work and rate of calculation will be 2% per month of
delivery price will be recovered from the supplier without any reference to the
supplier. The amount of Liquidated damages will be however subject to the
maximum of 10% of the total contract sum.
However, Delay in excess of one hundred (100) days after completion of delivery
period may be cause for termination of contract and forfeiture of all security for
performance. Decision of Municipal Commissioner, RMC in this regard will be
final and binding to successful tender/ contractor.
Contractor’s Sign ENVIRONMENT ENGINEER
With seal SOLID WASTE MANAGEMENT
RAJKOT MUNICIPAL CORPORATION
Rajkot Municipal Corporation
Technical specifications
Truck Mounted Mist Machine
Truck Mounted Mist Machine (Mist Spraying) for Dust Suppression & other
Municipal utility like Air Quality Control, Public Health, C & D Waste
Management & Sanitation related work having – Appx. 8000 Ltr. tank Capacity
& other attachments.
The equipment shall be designed, fabricated, mounted and integrated to the chassis
EURO VI/BS‐ VI norms & matching all requirements of various govt. agencies/RTO
rules/ norms & the following technical specification as the minimum requirement
Functional Requirements: The Vehicle shall be rugged and shall incorporate latest
technological features offered by the manufacturer. The vehicle shall be suitable for
use as Mist spraying unit at various sites conveniently.
Working Principle
Mist sprayer is required for spraying mist in Large area, trees, plants etc for
controlling the dust in air & there by prevention of air pollution. High pressure
water fogging which creates an ultra‐fine fog consisting of very fine water droplets
(less than 20 to 25 micron size), with the rotation system left to right (0° ‐ 360°
automatic) and raising (0° ‐ 60° automatic). Wireless remote control for automatic
operation which can adjust the throw angle, oscillation, and start/stop. Electric
control panel with on/off command of the blower, emergency stop, overload
protection, phase protection, dry run controller.
All steel fully forward control driverʹs cab. Cabin should have minimum two nos.
foam padded adjustable seats with seat belts. Cab should have all standard
accessories provided by truck chassis manufacturer and shall confirm to
requirements of Latest Motor Vehicles Act.
The truck chassis shall be suitable to handle the specified load, provide satisfactory
service envisaged and shall comply with all provisions of latest Motor Vehicles Act.
The equipment shall confirm to the following minimum
requirements/specifications
Specifications for driver cabin (If cabin not provided by chassis manufacturer,
otherwise as per the standard dimensions, materials and design of chassis
Driver Cabin: All steel welded full forward driversʹ cabin with steel structure and
M.S. Panelling should be provided. It should be dust and water sealed and with
sound and heatproof treatment.
For clear visibility both side wind screen glass with wiper motor/s should be
provided, wind up type front door on both sides should be provided with heavy
duty hinges and locking arrangements. It should be fully painted with glass finish,
All‐steel full‐forward control driver’s cab having easy maintenance facility and
provision for maintenance of various engine, electric, chassis related parts.
Necessary controls and other provisions as per latest RTO rules must be provided
inside the driver cabin. Proper lighting and seating arrangements for driver and co
driver with metallic pouch for keeping log diary should be provided. The chassis
must have following minimum technical specification:
1. ENGINE: Six cylinder, water cooled diesel engine having
engine capacity minimum of 180 PS @ 2400 rpm
or as per CMVR/ARAI approval with turbo
charger with intercooler. It must have EURO‐ VI
/ BS‐VI emission norms.
2. MIN.TORQUE: 700 N‐m at Rated RPM as per CMVR / ARAI Approval.
3. AIR FILTER: Oil bath type, remote mounted or dry type its equivalent / as per
CMVR / ARAI Approval.
4. CLUTCH: Single plate, dry friction type and outside diameter of clutch lining
350 MM minimum.
5. GEAR BOX: Synchromesh Min. 5 forward and 1 reverse.
6. FRONT AXLE: Heavy duty, forged I beam, Reverse Elliot type or semielliptical / as
per CMVR / ARAI Approval.
7. REAR AXLE: Single reduction, hypoid gears, and fully floating
axle shafts / as per CMVR / ARAI Approval.
8. STEERING: Power assisted – Hydraulic type
9. BRAKES: Pneumatic foot operated. Parking brake‐spring
actuated parking brake acting on rear wheels /
as per CMVR / ARAI Approval.
10. FRAME: Ladder type frame with riveted/bolted cross
members side members are of channel section /
as per CMVR / ARAI Approval.
11. SUSPENSION: Semi elliptical leaf spring at front and rear / as per CMVR /
12. WHEEL & TYRES: Min. Tyres‐11.00 X 20 ‐ 16 PR Number Of wheels:
Front: 2, Rear: 4; Spare: 1 / as per CMVR / ARAI
13. FUEL TANK: 150 litres capacity minimum.
14. CAB: All‐steel full‐forward control driverʹs cab
15. ELECTRICAL SYSTEM: System voltage‐12 Volts / 24‐ Volts.
16. WHEEL BASE: Suitable with system design
17. GVW: more than 16,000 Kg
Water Sprinkler (Mist spraying) Unit :‐
Water Sprinkler (Mist Spraying) unit on above Cab ‐ Chassis is required to design
& install for Spraying water / Mist as per site requirement for Dust Suppression in
the air. It shall have throw capacity of > 30 meter for 20 to 25 micron size droplet (In
no wind condition). Following are the minimum requirements.
Running Time Water : Full Flow 55LPM
(Appx. Requirement ‐ not more than) Low Flow 15LPM Misting Option 8LPM
Control Panel Following operations shall be controlled from control
panel for ease of operation & better control. Start/Stop,
Tilt Up/Dn, Left/Right, On/Off Auto turn
Automatic turning rotation system left to right ( 0° ‐ 360° automatic) and
raising (0° ‐ 60° automatic)
Operation Temperature : +10C to + 500 C
No.of Nozzles (Appx.) : 20 / as per system design.
Special Features shall be required in the unit.
Booster Pump of reputed make with 4 to 6 Bar pressure shall be provided.
Automatic water valve Between Tank & Cannon shall be provided
Automatic Turning System shall be provided for cannon.
Water Drain Valve also shall be provided.
Filter System with 500 micron filtration capacity shall be provided between
tank and system to avoid dust , waste etc. entering in to the system.
Pressure Gauges shall also be provided to monitor system pressure etc.
Water Tank &Generator :‐
Robust tank with appx. 8 CuM Capacity (for 8000Ltr ) shall be designed, fabricated
& mounted. Truck Mounted Water Tanker shall be fabricated from minimum 4mm
Thickness with 2 Baffles and 3 Filling Points on the Top. All necessary support etc
for the tank shall be provided for proper mounting. The Water Tank shall be
designed According to Truck Chassis & rest system requirements & designed.
STANDARD FITMENTS IN VEHICLE :‐
- A) FOOT STEP (OUT SIDE)
- B) LADDER PIPE ON THE SIDE WALL (LEFT).
- C) TAIL LAMP GUARD
- E) RADIUM TAPE AT SIDE AND REAR FOR SAFETY.
Suitable hook at front & rear shall be provided for toeing purpose.
Painting: The body should be sand blasted prior to coating/painting. The body
shall be coated with one coat of zinc rich primer & then with two coats of synthetic
enamel paint to ensure long lasting structure suitable for use under hostile
conditions. Colour shade shall be as specified by the RMC. The logo/ message of,
capacity of equipment and any other information asked by the RMC shall be
painted on the body. The paint shall be of good quality and of ICI / Asian / Johnson
& Nicholson / Burger / Nerolac make.
The supplier should paint/ provide number and messages on the body as per RMC
o All welding work must be MIG welding only. All necessary finishing shall
be carried out prior painting. Welding wire shall be of ESAB/ADOR/L&T
o All angle and channels and other raw materials are as per Indian standard.
o All MS material shall be of Tata / SAIL/ Indalco / Jindal / Vishakhapatnam
steel/ Essar /Ispat/ (for angle/ channel if not available of above brand then it
shall be of IS/ISO approved make) only.
Inspection of the fully built unit will be done by Exen. mechanical
department or his representative and during inspection if any minor
modification/suggestion recommended for better working of the system,
same shall be implemented by contractor.
All required safety & warning control system & mechanism should be provided in built.
Party has to submit the latest test certificate/report for quoted model of
ARAI / CMVR / approved authority confirming BS‐VI / BS‐VI as
applicable, along with its technical bid.
Tenderer has to furnish the following details.
Engine H.P. at RATED R.P.M.
Transmission details.
Specification & details of Generator / Prime Mover / Suitable system which
shall be provided by tenderer for Mist spray operation.
Gross and net load capacity.
Party has to submit the list of their authorised service centres in the Rajkot,
Any other relevant technical details.
OTHER INSTRUCTIONS:
The tenderer shall offer the Model which is current standard model of
production, also which is substantially the same as one proved in
successful use.
A standard and recommended tool kit shall be supplied along with the Truck for
regular maintenance of the vehicle and all fittings and attachments.
INSTRUCTION MANUAL:
Copies of each operation instructions manual, service manual and spare
parts list shall be supplied with each Vehicle.
The successful tenderer shall make arrangement for testing/
demonstration of the Truck Mounted Mist Machine both at the works of
manufacturer (if required) and at the Municipal site (as may be required).
The tenderer shall issue a test certificate for the performance of the Truck
Mounted Mist Machine.
Contractor’s Sign ENVIRONMENT ENGINEER
With seal SOLID WASTE MANAGEMENT
RAJKOT MUNICIPAL CORPORATION
Rajkot Municipal Corporation
APPENDIX ‐ 1 (Continue)
Scope of Work For O & M Contract
The scope of work is Comprehensive, Operation & Maintenance Contract of Truck
Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity) - 03 Nos. of RMC for
the period of 5 years as per specification and conditions mentioned in the tender
document. The contractor shall have to commence the work within 7 days from the
date of issuance of Vehicles to them by RMC and shall have to scale it up to the
expected level within 15 days. The O & M Contract will be for a period of 5 years
from the date of commencement of work subject to annual renewal as mentioned in
the document. The same can be extended for a further period of 2 (Two Years)
Years by the corporation and on the terms and conditions mutually agreed upon in
Contractor has to every day provide vehicles to SWM dept. in various zone / area
of RMC. These Vehicles will be deployed with staff of SWM dept for and other
garden work related activities as informed by officer of SWM dept of RMC timely
and efficiently on 24 x 7 basis throughout the year as per the RMC requirement
during the contract period. These vehicles will be provided either at SWM
department or will be distributed through Zone of RMC based on work
requirement. Contractor has to shuttle the vehicles between various locations/
gardens/ parks / areas as defined by officer of SWM dept. of RMC timely and
efficiently. Contractor has to operate the all vehicles for water spray/mist spray to
control the dust in the air promptly and with necessary care. All instructions given
by officer in charge of SWM dept. for proper recording of work done in each
shift/trip etc. shall be implemented by contractor. Every day vehicles shall be
cleaned by contractor, so that no bad smell or odour should come out from the unit.
He has to keep vehicles neat and clean. Contractor has to provide one skilled driver
and one labour with each Vehicle during the entire working time.
The operation of vehicles shall be confirming to Operation manual of the Vehicles
manufacturer. The repairs & maintenance shall be carried out, as per the practice
prescribed by manufacturer/instructed by RMC.
The Contactor shall ensure that his personnel report work every day at designated
time and continue working throughout the day. The contractor shall make
provision for presence of requisite manpower during national holidays and
festivals so that the work is not affected at any site in the Rajkot city. The
corporation for working on holidays, national holidays and festivals will make no
separate payments. The Contractor should ensure presence of his workforce at the
specified time. The contractor shall not be paid for any overtime charges for
working at late hours so as to complete the scope of work and maintain the
cleanliness at various locations.
The corporation has the right to charge the contractor for any damage caused to
corporation assets and the same shall be recovered from the contractor with
immediate effect. Contractor has to keep enough spare/stand by units for
preventive and breakdown maintenance of all the equipments as per the
unit/equipment manufacturer’s guideline and this will be verified by the Engineers
of SWM, at any time for smooth and uninterrupted working of machines.
It is unlawful for the contractor to dump/Spray Water upon any street, alley or
other publicly owned property unless expressly authorized by the corporation for
special collection programs.
Contractor has to submit daily/weekly/monthly report of their work to the
respective RMC department
• Providing 03 Nos. Truck Mounted Mist Machine as per the specifications &
requirement given in the tender document and daily operation and
maintenance of these vehicles for complete duration of the contract period.
• Procure, provide, and maintain necessary tools, equipment machinery,
manpower, fuel etc. for Truck Mounted Mist Machine.
• Water/Mist Spray work related work through these Vehicles shall be done
on Designated site as instructed by RMC officials.
• The monitoring of the complete system will be done by SWM Dept. of
RMC. The GPS system shall be integrated with central command centre
other location (As per RMC requirement) as instructed by RMC.
• The work with Truck Mounted Mist Machine shall be done at least 8 hours
a day by each Vehicle. However the actual timing may be reduced or
extended by RMC as per the requirement site conditions and need of work.
• Contractor should procure/maintain/keep in stock, necessary tools,
equipment, machinery, manpower, fuel, spares etc for the Truck Mounted
Mist Machine in use. NO extra payment for these shall be made.
The scope of work shall consist of operation and maintenance of Truck
Mounted Mist Machine owned by Rajkot Municipal Corporation including
supply of all spares and include the following;
1. Services of an operator cum driver - labour (one each on vehicle) and other
manpower if required for O & M including technical support of service
engineer / technical person from successful bidder’s office as per
requirements and to carry out operation of Vehicle and related activities in
RMC as per the direction of Rajkot Municipal Corporation on a normally
Hours shift which may be in day or as per the RMC’s requirement.
2. The quoted rate are based on a 8 hours operation of the Vehicle, which
a. The time taken for spraying water/mist at the site,
b. Moving the vehicle from one place to another,
c. Moving the vehicle from parking place to other areas and back,
d. Lunch break of operation (not included) - time will be decided &
Communicated by Zonal SWM dept. officer as per work and route
e. Water/Mist spray work &/or other official activity on road/on site.
Successful bidder shall make the arrangement of Operator, Cleaner per
machine & 1- Supervisor for 3 machines accordingly.
3. The bidder shall have to submit schedule of maintenance and carry out the
general daily preventative maintenance as recommended by OEM in
addition to minor break downs as per the schedule of maintenance. Major/
Break down maintenance, if required/incises will be permitted on written
instruction to SWM-RMC. Daily preventative maintenance shall also
include oiling, greasing, etc of all movable parts.
4. Routine maintenance and servicing of Vehicle including replacement of
Hydraulic oil, engine oil, other oil and coolant liquid etc. Same shall in the
scope of Contractor and remains to be kept in stock according to the
requirement and maintenance schedule as recommended by OEM.
5. Vehicle shall be cleaned daily and service once in a month.
6. Routine consumable spares inventory shall be provided by bidder and
maintain minimum inventory to avoid any hassle in operation of Vehicle.
The list of routine consumable spares shall be submitted along with this
7. All running/major repairs and break down repairs of entire Vehicle shall be
in scope of work including all necessary spares/accessories etc required for
smooth and uninterrupted operation of Vehicle.
8. The equipments (Vehicle) shall be parked at any locations suggested by
Zonal SWM dept on day-to-day basis and shall be operated under the
supervision of SWM dept. User department. Parking facility shall be
provided by the RMC Zonal SWM dept. The Vehicle shall be parked
during the non-working hours at the place directed by Zonal SWM dept or
Officer-in-charge. Safety & Security of Vehicle at non operative hours shall
be ensured by contractor at their own cost.
9. All safety equipments required on Vehicle like Fire extinguishers,
emergency rechargeable torch, anchor etc shall be provided by supplier
before starting of contract and kept on Vehicle during operation and
maintenance period.
10. Day to day report/log sheet/computer record of operation and maintenance
shall be filled in by the bidder staff and same shall be submitted to Zonal
SWM Dept operation in charge on next day. The design of report shall be
given by RMC operation in charge and same shall be followed by bidder.
11. Bidder shall depute one person between all Vehicle as supervision to
synchronize day to day routine work management, repairing of Vehicle
and follow up the instructions given by user department. Further, bidder
must visit as per as per requirements of RMC for synchronies the O & M
activity at his own cost.
12. The bidder shall also maintain register/ record for consumable, spare
maintenance in appropriate formats.
13. The bidder shall make every effort for complete safety of the RMC’s
equipments while performing the operation and maintenance at site.
14. Corporation will not be responsible for any accident/hazard during
operation and maintenance of the equipments. All responsibility shall rest
with the contractor. Contractor must take all precautionary/safety
measures to avoid accident/ hazards etc.
15. During maintenance of Vehicle, for repairing of any parts/spares,
equipments installed in Vehicle, necessary machinery such as extra man
power, etc shall be arranged by the successful bidder at his own cost and
included in the scope of work.
16. During contract period, if Vehicle fails to work because of Vehicle is under
maintenance or lack of man power, the cost being paid towards operation
and maintenance will not be paid (in short” No work done- no payment”
shall be given). In addition to that necessary penalty as mentioned in
tender towards minor & major repair work time period for additional time
taken for repairing in addition to the no work-no payment will be
recovered as penalty.
17. The bidder shall submit GPS data to the Zonal SWM dept Officer in charge
at zonal level for work carried out certification.
18. All required statutory & Govt. formalities (if any) for carrying out such
type of work shall be complied by contractor & it is their responsibility.
Contractor has to submit daily/weekly/monthly report of their work to the
respective RMC department as required & asked by RMC.
RMC reserves the rights to terminate the Contract for Deficiency of Service.
Contractor has to carry out washing of all the Vehicles and equipments at
least once a week.
(A) Comprehensive Operation:
i) As the operation of the Vehicle on everyday basis is required, it would be
the responsibility of the successful bidder to provide 1 skilled operator
having valid driving license known to all operational activities of the
Vehicle and one Labour on each Vehicle per shift (8) hours or as may be
required on all the 365 days of the calendar year. There would not be any
services to be rendered on national holidays i.e. 26th January, 15th August
& 2nd October. Further each Vehicle’s operation shall be stalled for 2 days
in a month for routine maintenance or as per the work requirements and
instructions by SWM dept., RMC.
ii) Planning of rendering the services shall be based on 8 hours operational
shift. However based on SWM department requirement contactor has to
provide Vehicle for actual work requirement. Daily route plan will be
given by SWM dept of respective Zone / Officer in charge of work.
iii) During situations such as visits of VIPs successful bidder will be require to
render operational service even on National holidays. No extra payment
(Other than one which is approved) would be payable to the contractor
form rendering operational services on these events which is required to be
noted by the successful bidder.
iii) Successful bidder will have to ensure that each and every Vehicle must be
covered with their comprehensive insurance per year and that the next
year’s insurance shall be done before the expiry of the earlier year’s
insurance. It may be noted that the successful bidder will be paid as per the
tendered offer sanctioned only. Necessary documents shall be submitted
iv) To maintain the disciplined and efficient services, it would be necessary to
appoint at least one supervisor for this tender work better coordination in
addition to operators and provide them uniforms, safety gears & mobile
v) As far as parking arrangement of the Vehicles are concerned, the parking
place shall be made available by RMC, in respective zone by SWM dept.
officer incharge.
vi) If due to less work &/or for any reason, RMC do wish to run the vehicle/s
for more than 8 hrs. shift then contractor will be paid on pro-rata basis for
actual working hours on that day. RMC decision & rate calculation in such
event/s will be final & binding to all.
vii) Shift timing will be calculated (started) from start of Vehicle from parking
area & end will be when vehicle come back again to parking area which is
provided / identified by SWM dept. officer in charge. However; contractor
has to ensure fast & efficient movement of Vehicle/s in all the case. If RMC
finds any inefficiency; can take necessary actions including payment
deduction for such time & will be binding to contractor.
xi) A successful bidder shall maintain log sheet/Computer Record to enter the
information about the day to day works allotted to them by the
representative of their concerned SWM dept of the zone / Officer in charge
xii) For any default of service performance a penalty of amount equivalent or
not more than to the O & M cost of the specific vehicle and the length of
the default area (at the rate approved by RMC) shall be deducted /charged
from the running bills. The details of the events of default and the exact
rate of penalties shall be as specified in tender terms.
xiii) As a disciplinary measure, following penalties would be liveable so that
the defaults are not recurred as per the penalty shown in the penalty table.
Notwithstanding the provisions of tender, the contractor shall not be liable for
forfeiture of its performance security, liquidated damages or termination for
default, if and to the extent that, its delay in performance or other failure to
perform its obligations under the Contract is the result of an event of Force
For purposes of this Clause, ʺForce Majeureʺ means an event beyond the control of
the contractor and not involving the contractorʹs fault or negligence and not
foreseeable. Such events may include, but are not limited to, acts of the Purchaser
either in its sovereign or contractual capacity, wars or revolutions, fires, floods,
epidemics, quarantine restrictions and freight embargoes.
If a Force Majeure situation arises, the contractor shall promptly notify the
Purchaser in writing of such conditions and the cause thereof. Unless otherwise
directed by the Purchaser in writing, the contractor shall continue to perform its
obligations under the Contract as far as is reasonably practical, and shall seek all
reasonable alternative means for performance not prevented by the Force Majeure
Taxes and duties
It shall be included in the indicated price. Tenderer has to quote the total price, net
including of all taxes & duties , GST (if applicable) etc. and for evaluation and
finalisation purpose, the total price will be taken in to consideration. However any
change in the GST tax, govt. statutory levies will be considered at actual for
payment purpose for which contractor will have to submit necessary documentary
proofs as required by department.
TOOLS & TACKLES
The successful tenderer shall provide all the required tools and tackles for the
operation maintenance of the equipments. SWM department time and again during
contract period will verify this.
WORKS TO BE CARRIED OUT
The works to be carried out under this contract shall except or otherwise provided
in these conditions include all labour, materials, tools, plant, equipment and
transport which may be required for preparation of and for the full and entire
execution and completion of the works. The description given in the
schedule/scope of works shall unless otherwise stated be held to in and for the
entire execution and completion as aforesaid in accordance with good practice and
recognized principles.
CONTRACTOR’S SUPERVISION
The contractor shall himself supervise the execution of works or shall appoint a
competent person to actin his stead. If in the opinion of the Corporation the
contractor has himself not sufficient knowledge and experience to be capable of
receiving instructions or cannot give his full attention to the works, the contractor
shall at his own expense employ or his accredited person, having experience in
the field of Operation and Maintenance of Truck Mounted Mist Machine deployed
for such activities. Orders given to the contractor’s person shall be considered to
have the same force or if these had been given to the contractor himself. At least
one common supervisor for all the Vehicles shall be deployed by contractor for
better coordination of work.
SAFETY PROVISIONS
The contractor shall at his own expenses arrange for the safety and security
precautions as required by the Corporation/necessary for such services, in respect
of all labor directly or indirectly employed for performance of the works and shall
provide all facilities in connection therewith. In case the contractor fails to provide
such facilities, the Corporation shall be entitled to do so and recover the costs
thereof from the contractor. Contractor has to manage for his own security (if he
require) for safety of the Vehicle &/or its any part thereof, even if parked at RMC
MATERIAL AND WORKMANSHIP
The tenderer shall at his cost provide all materials required for the works. All
materials to be provided by the tenderer shall be in conformity with the
specifications laid down in the tender/as per the Vehicle manufacturerʹs
specification/instruction, the contractor shall if requested by the Head, SWM
Department or his authorized representative furnish proof to the satisfaction of the
Engineer or his authorized representative that the materials so comply. All charges
on account of outcry, terminal or GST (If Applicable) and other duties on material
obtained for the works from any source shall be borne by the tenderer.
The RMC or his authorized representative shall be entitled to have tests carried out
for any material supplied/used by the contractor other than those for which as
stated above, satisfactory proof has already been produced, at the cost of the
contractor and the contractor shall provide at his expense all facilities which the
Corporation may required for this purpose.
If no tests are specified in the Contract and the Corporation requires such tests, the
tenderer shall provide all facilities required for the purpose and the charges for
these tests shall be borne by the contractor.
In order to maintain high standard of workmanship, the successful tenderer shall
fix a schedule for cleanliness and maintenance of the equipments. Sanitary
conditions shall be maintained throughout the period, with hygiene and
environment getting the top priority.
The successful tenderer shall provide small size plantations wherever possible
inside the area allotted for Parking/ maintenance under O & M work to them.
OPERATION AND MAINTENANCE INCLUDING VEHICLES AND
EQUIPMENT/MACHINARIES:
The contractor shall be responsible for smooth and satisfactory operation and
maintenance of the Vehicles for 365 days round the year for a period of 5 (Five)
Years from the date of start of work.
More specifically, the contractor shall be responsible for the following: ‐
(1) To operate and maintain the Vehicles in accordance with manufacturerʹs
(Truck Mounted Mist Machine) guideline. The Vehicles attended to, by the
contractor including any ʺTrouble shootingʺ to ensure smooth and trouble
free operation.
(2) The contractor shall prepare and implement, an effective operation and
maintenance programme in consultation with SWM Department, RMC.
RMC will not provide any skilled or unskilled work force, machinery or
equipment other than that specified in the tender document. It is absolute
responsibility of contractor to look after all sorts of maintenance whether
preventive or breakdown.
(3) The contractor shall determine operating parameters for work
mentioned above in scope of work.
(4) For the smooth operation of the Vehicles all the required equipment,
machineries, units, accessories, consumables including Fuel (Diesel),
grease, lubricating oils, cleaning agents, all types of epoxy paint, material
required for housekeeping and cleaning etc. are to be brought by the
contractor. The quality of all consumable and spare as per manufacture
recommendation shall be made available at site/workshop all the time and
will be verified by SWM department.
(5) The contractor shall be responsible for keeping up‐to‐date record of
documents including day to day log sheet of all the Vehicles. The
contractor shall maintain and update logbook / computer record in which
details of operational parameters are recorded in every shift and at
regular interval or as decided mutually.
The Contractor shall maintain separate checklist register for daily, weekly,
fortnightly, monthly, quarter yearly, half yearly and yearly activities.
(6) The contractor shall be responsible to carry out day‐to‐day as well as
periodic maintenance, necessary to ensure smooth and efficient
performance/running of all equipments as per manufacturer’s specification
and maintaining the record of the same. This will be verified by SWM
Department official, RMC.
(7) The contractor shall have to issue identity cards with photographs,
the staff employed for Operation and maintenance contract work.
It will be the responsibility of the successful tenderer to have
comprehensive insurance coverage of all Vehicles, equipments etc along
with their operating staff at their cost. They are requested to note that there
will not be any reimbursement in this regard by RMC. In case any
mishap/accident occurs on the road or at site, the successful tenderer will
have to shoulder the complete responsibility of the same, right from
registration of Police complaint, lodging/follow up of the insurance claim
and facing the court trials etc. It shall be the responsibility of successful
tenderer to set right the Vehicle without raising any extra bills/claim
against the same for reimbursing the same from RMC. However, they shall
be liable to receive all the payments received by RMC (if claim amount
issued to RMC by insurance company.) against the settlement of insurance
claims from the Insurance Institutions/it can be directly reimbursed to the
contractor by Insurance company. RMC authorities shall give the full
cooperation to the successful tenderer by signing the requisite documents
necessary for raising the insurance claim up to settlement of the same.
PROVISION OF GPS MECHANISM
Contractor as per the requirements of RMC, for effective communication shall
provide like communication system/equipments including GPS system with
suggested software, latest computer systems with multifunctional printer at his
cost, as per the RMC policy.
IMPORTANT NOTE:
The contractor shall employ all required staff including operation Supervisor,
technical experts, skilled and unskilled labours, drivers etc. required for such
Contractor shall comply with all safety rules and regulations and all inter
disciplinary measures as followed by the RMC and required for such services
The RMC shall not be responsible for any accident /injury to the staff of the
contractor. It is contractor’s responsibility to take insurance of his employee,
medical facility, work compensation etc. as per workman compensation act and all
other relevant laws. Further the RMC will not provide any insurance, medical
facility, workman compensation, etc. to the staff of contractor.
Due to strike by the contractorʹs employees, the operation and maintenance of
Vehicles must not be affected and the property of RMC should not be damaged. In
such case any dispute/discrepancy occurs the decision of Dy. Municipal
Commissioner (SWM) will be final and will be binding to the contractor. Also if any
expense is required to be made on this account by RMC, it will be deducted from
Contractorʹs bill/SD.
All Central/State Government/Semi‐Government/Local Bodyʹs Rules and
Regulations pertaining to this contract & / or services shall be strictly followed
and observed by the contractor without any extra cost to the RMC.
Payment will be made every monthly against satisfactory work, as per certificates
of various authorities as mentioned in the tender.
The Security Deposit will be paid back only after the completion of entire Contract
period without any interest after deducting dues if any to be recovered from
The duration of the contract shall be for 5 years from the date of commencement of
O & M work. However RMC reserves the right to terminate the contract at any
time by giving 1 months (30 days) notice to the contractor.
At the end of O & M contract period, contractor shall hand over Truck Mounted
Mist Machine in satisfactory working conditions acceptable to Municipal
Commissioner &/or SWM Department / their authorized representative. Otherwise
penalty equivalent to the cost of repairs will be imposed by RMC at the discretion
of Municipal Commissioner & shall be binding to the contractor. This will be even
recovered from the contractor from any of his dues &/or security deposit with
AGREEMENT WITH MANUFACTURER FOR TECHNICAL BACKUP.
In case the tenderer is not the manufacturer/authorized
dealer/agent/distributor/autho. service dealer/ provider as mentioned in the tender,
then the tenderer shall have proper tieup agreement with the
manufacturer/authorized dealer/agent/distributor for such Vehicles duly registered
in India for the entire contract period, clearly stating that the
manufacturer/authorized dealer/agent/distributor will supply the spare parts,
provide technical support and services and with backup guarantee of the
manufacturer/authorized dealer/agent/distributor to RMC during the entire
contract period.
This work is also inclusive of painting of Vehicles at the regular interval of two year
(if Vehicle found dirty) in normal case and as and when required in
accidental/repairing situation. The SWM department will verify this. However, if
any unit/mechanism will found to have some defect in paintwork at any time, the
Contractor has to repaint the same under the instruction of SWM Engineer.
The contractor shall not employ guilty person or indiscipline person.
The Contractor shall have to take valid labour license & any other relevant license
from statutory bodies as required for this type of contract / services.
Successful bidder will have to follow all the provisions of, Labour laws, P.F. Act,
E.S.I. Act, Minimum Wages Act, workman compensation act etc. & have to
incorporate changes made if any during contract period also.
Contractor will have to strictly follow the provisions of Factory Act 1947, wages
Payment Act1936, Bonus Act 1965, Employees Provident Fund & Miscellaneous
Provisions Act 1952 & other Industrial & Labour Laws with latest amendments in
act / rules related to this Operation & Maintenance Work. Contractor will not be
given any relaxation regarding these provisions.
Routine / preventive / break‐down maintenance of Vehicles including all work that
has to be perform with such Vehicles are in the scope of Contract
Upon failure of the Contractor to comply with any instructions given in accordance
with the provisions of this contract, the RMC has the alternative right, instead of
assuming charge of entire work, to place additional labour force, tools, equipments
and materials on such parts of the works, as the RMC may designate or also engage
another Contractor to carry out the work. In such cases, the RMC shall deduct from
the amount which otherwise becomes due to the Contractor, the cost of such work
and materials with 10% added to overall departmental charges and should the total
amount thereof exceed the amount due to the Contractor, the Contractor shall pay
the difference to the RMC. It should be specifically noted that wherever bank
guarantee is required to be submitted, it should be from Nationalized
Banks/scheduled bank / RMC approved bank list only.
CONTRACT PERIOD
The successful tenderer on award of contract shall have to commence the O & M
work within 7 days from the receipt of Vehicles.
The Contract will be for a period of Five years from the date of commencement of
O & M work subject to annual renewal as under. The same can be extended for a
further period of 2 (Two Years) Years by the corporation and on the terms and
conditions mutually agreed upon in writing.
The Contract will be renewed automatically at the end of each year subject to the
Contractor scoring at least a score of 75 under the following heads
PERFORMANCE POINT CERTIFICATE TABLE: =
Sr. Head Maximum Score of the
No Score Contractor
1 Punctuality in providing Truck Mounted Mist
Machine and overall efficiency of working
2 Behavior and discipline of the staff with RMC
officers and employee during working
3 Maintenance of Truck Mounted Mist Machine
4 Maintenance of GPS system with
related infrastructure
5 Maintenance of Other infrastructure /facility for
repair and maintenance of Truck Mounted Mist
Machine as per scope of work
6 Maintenance of extra fast moving spares and
consumable spares
The above score will be calculated at the end of each year. The performance shall be
reviewed and reported by SWM Department (for Sr.no.3, 5 and 6) and Zonal SWM
dept (Sr.no.1, 2 & 4) of RMC (based on service requirement certification method can
be changed by RMC ‐ even can be judged based on monthly penalty statement) and
at the end of the year it will be reviewed by Environment Engineer (SWM) (even
from monthly penalty statement it will be concluded). If the average monthly score
is above 75, the Contract will get automatically renewed.
For O & M Contract Price will be as per the bid in the Annexure 4 and will be
inclusive of all expenses necessary for the continuance of the O & M services under
the contract. Such expenses shall include but not restricted to payments to RTA,
Labor Authorities, Local and Municipal Authorities, Semi Govt., or any charges,
deposits, fuels, taxes, oil, lubricants, levies, toll taxes, GST tax (if any) etc.,
connected with the service. The all‐inclusive rate should be filled up in the
respective column.
Rates quoted by tenderer shall be inclusive of GST and other terminal or tax etc. as
may be applicable and will be fixed for entire contract period. Only fuel price
variation/change will be applicable as per the condition and formula given in the
tender document.
The corporation reserves the right to increase or decrease the scope of work by
25%. Contractor shall have to carry out 25% extra work at the same rate, terms and
conditions if asked to do so.
On specific occasions, the corporation reserves the right to ask the contractor to
provide additional services. The Contractor is bound to provide the same at a short
notice of few hours. The rates for additional services requested by the
commissioner will be mutually agreed upon between the Contractor and the
The contractor shall provide well‐trained, disciplined, honest and sincere
workforce, throughout the contract period and supervise their work regularly.
They should not pose any problem, nuisance to the general public. The contractor
shall be solely responsible for the behaviors and honesty of its workforce.
The contractor shall appoint one supervisor to ensure that services are rendered
effectively. He must be available on site/at office during the working hours. At least
one common supervisor for the entire 3 Vehicle shall be deployed by contractor for
better coordination of work in the field.
The maintenance supervisor shall be qualified person, and with experience and
competent and authorized by the contractor to take decisions at site. Such
supervisor shall be deemed to have full authority of the contractor and any
instructions given to him by the corporation officers shall be deemed to have been
given to the contractor. The supervisor should be easily accessible at all times and
should have a mobile phone with them at all times. The Contractor shall ensure
that the supervisor or any other authorized representative shall invariably be
available either in person or over the telephone within the city every day for taking
necessary instruction and for proper co‐ordination.
The tenderer shall indicate the manpower including supervisor & their labors he
proposes to deploy and the methodology to be adopted. No decrease in the
workforce shall be done once notified without prior written approval of the
Municipal Commissioner / officer incharge of work. The commissioner may
deduct suitable payments to the contractor if it is noticed that the workforce is
reduced without prior approval.
Contractor shall provide suitable uniform to all their staff including shoes and
photo identity card.
The contractor must verify antecedents of the employees to be provided by the
contractor before deployment. The contractor shall engage no person having
criminal record or who is not the citizen of India.
The contractor may, at his own cost and responsibility, consider increasing his
workforce, equipments, and materials in order to discharge contractual obligation.
The Municipal commissioner reserves the right to ask for the replacement of the
personnel not found fit or suitable for undertaking the task assigned. The
contractor shall do replacement without any extra cost to the corporation within
one week of the order.
Contractor shall pay salaries /wages etc. through bank to his workforce adhering to
the laws in force & all liabilities and responsibilities in respect of persons engaged
by him shall lie with the contractor.
To avoid mishap or accident during the operation, the Contractor shall ensure that
only skilled staff / drivers with sufficient experience in their respective trade and
physical fitness are deployed on the job and are not put to over exertion as per
prevailing labor laws of the State and / or Central Governments.
The staff/drivers deputed by the contractor during the course of contract must
behave decently with the corporation’s officer and staff. The Contractor shall
withdraw such person who is found to be indiscipline, misbehaving, under or the
influence of any intoxicant or whose services are considered detrimental to the
corporation’s Interest. On giving intimation to do so by the Municipal
Commissioner or his authorized representative. The corporation will serve a Notice
to the contractor if he fails to comply. Failure to replace the personnel after
issuance of notice by the corporation will be considered to be is sufficient ground
for termination of the contract. It will not be binding to the corporation to justify
the reasons to the Contractor for advising such withdrawal of staff.
The Drivers/operators of the contractor must be in possession of a valid
professional driving license and the driving license should be at least three years
The contractor shall ensure that his personnel report to work every day at
designated time and work sincerely throughout the period prescribed in the
contract with RMC. The staff so deployed shall be given the statutory weekly off.
The contractor shall make provision for substitute manpower during weekly off of
the staff and statutory holidays so that the work is not affected at any site in the
City. The corporation will not pay any extra payment for making substitute
arrangements on weekly off and other holidays.
The contractor shall not be paid or reimbursed by the RMC for any overtime work
done by his staff to complete the task and for maintaining the cleanliness at various
locations. The Contractor, through his supervisor, shall submit a report to
corporation about number of workforce which have reported to work as against the
agreed workforce (if asked by RMC).
OPERATIONS AND USE OF VEHICLES & EQUIPMENTS
The Contractor shall be fully conversant with all the laws applicable to the work
under the contract including Motor Transport Work’s Act 1961 and even any
amendment thereof.
The contractor shall submit a detailed Operations and Maintenance schedule at the
time of starting of work. The Contractor shall submit within four weeks of award of
work. All Preventive Maintenance procedures and Corrective Maintenance
procedures described in the Operations and Maintenance Manual shall be followed
by the contractor.
The corporation shall have a right to charge the contractor for any damage caused
to corporation assets during the performance of contract by the contractor and the
same shall be recovered from the contractor in a month or from the amount
payable to him.
Contractor shall keep enough spares for units for replacement during breakdown
or preventive maintenance.
Materials used for Hydraulic units should be of standard make & as per instruction
/ specifications of SWM of RMC.
It shall not be permissible for the contractor to dump or dispose of solid waste,
garbage, or recyclables waste on any street, alley or other publicly owned property
unless expressly authorized by the corporation.
Contractor shall submit daily/weekly/monthly report of the work done to the
officer of concern deptt. and SWM department; RMC from time to time in the
Performa that may be prescribed.
The contractor shall be liable for penalty as under if he fails to perform his
contractual obligations besides any other action; the Municipal Commissioner may
decide to take as per the terms of the contract.
‐ All minor repairing & preventive maintenance shall be carried out within 24 Hrs.
otherwise penalty will be imposed as per penalty shown in penalty table below,
which will be deducted from the monthly bill of the contractor. Preventive
maintenance schedule shall be prepared in coordination with SWM department.
All major repairing shall be carried out within 7 days (however shall be confirmed
by Engineer of SWM, RMC) otherwise penalty will be imposed as per penalty shown
in penalty table, which will be deducted from the monthly bill of the contractor.
The penalty will be deducted from the monthly bill of the contractor. Further in
above circumstances RMC will be at liberty to use vehicles with an alternate
arrangement. During such circumstances if any damage occurs to the vehicle, same
also must be set right by the contractor for which no extra payment / claim will be
reimbursed to the contractor by RMC. This shall be binding on the contractor.
Sr. Type of default Penalty to be impost
1 If Mist Spraying etc is not done properly (i.e. Entire shift work will be deducted
Vehicle does not work properly) on road. for such event.
2 In case the contractor fails to paint the Vehicle at RS.200/‐ per vehicle per day till the
every 24 months (if original color found same are painted.
3 The vehicle shall be exclusively used for RMC Rs. 5000/‐ for first such incidence
service only. Any deviation from this shall and then after Rs. 10,000/‐ for such
attract penalty incidence.
4 Non use of mobile by any of Rs. 50/‐ for each of such event.
Supervisor/Manager &/Or Operator.
5 Not keeping valid driving license Rs. 200/‐ for each such event.
6 If any of the contractorʹs staff at the Vehicle is Rs. 100/‐ per person for that
found to be working without the prescribed Shift/event.
safety gear, uniform etc.
7 If contractor fails to provide the driver/operator Rs. 500/‐ per person for that
as per the requirement of RMC shift/event.
8 If contractor fails to provide the Labour as per Rs. 400/‐ per person for that
the requirement of RMC Shift/event.
9 If the supervisor is not found on the work Rs. 500/‐ per such incidence
during the prescribed working hours (At site /
at their office)
10 If Water Tanker of vehicle found open / leakage Rs. 100/‐ per such event
during transportation
11 If the minor and major repairing work is not Rs. 500/‐ per such vehicle per day.
carried out as per the schedule given in tender
12 If the Vehicle bodywork is found damaged and Rs. 100/‐ per day till it is repaired
13 If GPS system is found not working Rs. 100/‐per day till it starts
The penalty will be deducted from the monthly bill of the contractor. Further in
above circumstances (Sr.No. 7) RMC will be at liberty to use Vehicle/s by an
alternate arrangement and during such circumstances if any damage occurs to the
Vehicle same also must be set right by the contractor for which no extra payment /
claim will be reimbursed to the contractor by RMC. This shall be binding on the
The tenderer / contractor shall keep the Vehicles in perfect working condition to the
satisfaction of SWM Dept. RMC.
PAYMENTS FOR O & M WORK
The contractor shall raise monthly bills to the Solid Waste Management for O & M
contract work at the rate agreed and approved under the contract.
Contractor shall submit his monthly bill in the 1st week of every month to the Solid
Waste Managaement From time to time along with duly certified work certificates
as by respective department and work done certificate as per the format given by
RMC, from Director (SWM dept) &/or his autho. Representative / concern deptt.
Officer in charge of work
For O & M contract payment will be made only for those shifts/ working for which
work has been carried out by contractor and approved by zonal concern deptt
officer incharge of work on the basis of per 8 hour shift rate approved in tender.
Contractor will be paid on a monthly basis subject to his producing satisfactory
performance certificate for work carried out from various departments as
mentioned in the tender.
Income Tax as per statutory provision shall be borne by the Contractor. The
corporation shall deduct all statutory taxes like advance Income Tax, GST ‐ TDS etc
from monthly payments being made to the Contractor.
Corporate Tax / any tax assessed on the income of the Contractor, GST (if any) shall
be the responsibility and payable by the Contractor
In case the contractor decides to stop the work during the continuance of the
contract or withdraws from the work without at least 60 days prior notice or if
services are terminated by the RMC on account of Deficiency in Service, the 5%
Security Deposit (performance security) amount shall be forfeited and the
contractor shall have no claim on the same. Further, the corporation reserves the
right to make alternative arrangements until new agency takes over. The additional
cost incurred on the same shall have to be borne by the contractor
The Contractor shall ensure timely payments to his workforce and meet all the
contractual commitments in terms of payments, insurance, safety of its workforce.
All statutory payments to the workforce shall be done immediately upon becoming
due. The proof of payments made and any statutory deductions from the wages of
the workforce shall be submitted within one week of making payments as and
when required by RMC.
If due to less work &/or for any reason, RMC do not wish to run the Vehicle/s for
hrs. shift then contractor will be paid on prorate basis for actual working hours on
that day. RMC decision & rate calculation in such event/s will be final & binding to
Shift timing will be calculated (started) from start of Vehicle from parking area &
end will be when Vehicle come back again to parking area which is
provided/identified by Director SWM dept. officer incharge of work However;
contractor has to ensure fast & efficient movement of Vehicle/s in all the case. If
RMC finds any inefficiency; can take necessary actions including payment
deduction & will be binding to contractor
ACCIDENT / DAMAGES / CLAIMS / LIABILITIES
In the event of any accident/damage to third party by any the Vehicle of the
corporation operated by the contractor, the corporation shall be completely free
from any liability of any nature occurred on account of the accident. The
Contractor will be fully and exclusively responsible for the liabilities arise on
account of accident and damage to the vehicle, manpower or to the third party.
The Contractor will be fully and solely responsible for any death or bodily injury to
his staff member or any other person in the employment of the contractor or to any
other person during the performance of the contractual services to the RMC. This
includes any third party claims also.
The Contractor will be solely responsible for any consequences under various laws,
arising out of any accident caused by Vehicles, equipments or his employees to the
property or personnel of the corporation.
The corporation shall not be responsible for any claim / compensation that may
arise due to death / injury / damage caused by municipal vehicle used by the
contractor to any third party or his own staff while providing services to RMC
under the Contract.
INDEMNIFICATION
The Contractor shall bear responsibility for loss of or damage to the property,
suffered by RMC, death or injury to person (or any claim against RMC in respect
thereof and all expenses relating thereto) in connection with the services provided
under the Contract resulting from any negligent act or omission of the Contractor.
The Contractor will hold the RMC fully indemnified in respect thereof.
The indemnified party shall have the right, but not the obligation, to contest,
defend, and liquidate any claim, action, suit or proceeding by any third party
alleged or asserted against RMC in respect of, resulting from, related to or arising
out of any matter for which the RMC is entitled to be indemnified there under, and
the reasonable costs and expenses thereof shall be subject to the indemnification
obligations of the Contractor there under. The Contractor shall be liable for all
payments, proceedings, and liabilities including payment of counsel fees.
The Contractor shall at all times indemnify the Municipal Corporation against all
claims, damages or compensation under the provisions of Payment of Wages Act
1936, Minimum Wages Act 1948, and Departments Liability Act 1938, The
Workmen’s Compensation Act 1923, Industrial Dispute Act 1947, Indian Factories
Act 1948 and Maternity Benefit Act 1951 or any modifications thereof and rules
made there under from time to time or as a consequence or any accident or injury
to any workmen or other persons in or about the works, whether in the
employment of the contractor or not, save and except where such accident or injury
have resulted from any act of the Municipal Corporation, their agents or servants
and also against all costs, charges and expenses of any suit, Action or proceedings
arising out of such accident or injury and against all sum or sums which may
with the consent of the contractor be paid to his obligations and liabilities as
above provided. The Contractor shall insure against all claims, damages or
compensation payable under the various acts mentioned above or any
modifications thereof or any other law relating thereto.
Income Tax as per statutory provision shall be borne by the Contractor. The
corporation shall deduct all statutory taxes like advance Income Tax, GST TDS (if
any) etc from monthly payments being made to the Contractor.
Corporate Tax / any tax assessed on the income of the Contractor, GST tax (if any)
shall be the responsibility and payable by the Contractor.
In case the contractor decides to stop the work during the continuance of the
contract or withdraws from the work without at least 60 days prior notice or if
services are terminated by the RMC on account of Deficiency in Service, the 5%
Performance Security deposit amount shall be forfeited and the contractor shall
have no claim on the same. Further, the corporation reserves the right to make
alternative arrangements until new agency takes over. The additional cost incurred
on the same shall have to be borne by the contractor.
LIABILITY FOR DAMAGES AND RISKS
The Contractor shall be responsible for all risks to the work and shall make good at
his own cost, all loss or damage, whether to the works themselves or to any other
Municipal property, or third party or to the lives, persons, or property of others,
from whatsoever cause, arising out of, or in connection with the works, either
during their progress or during the defects liability period, and this although all
reasonable and proper precautions may have been taken by the Contractor, and
in case the Commissioner or the Corporation shall be called upon to make good
any such costs, loss or damages, or to pay compensation (including that payable
under the provisions of Workmen’s Compensation Act ) to any person or persons
sustaining damage as aforesaid by reason of any act or of any negligence or
omissions on the part of the Contractor, the amount which the
Commissioner may pay in respect thereof and the amount of any costs or charges
(including law costs and charges ) in connection with legal proceedings which he
may incur in reference thereto, shall be charged to the Contractor. The
Commissioner shall have full power and right at his own discretion to pay or to
defend or compromise any claim which may be made against the Corporation for
damage or in case of threatened legal proceedings, or in anticipation of legal
proceedings being instituted, consequent on the action or default of the Contractor,
to take such steps as he may consider necessary or desirable to ward off or
mitigate the effect of such proceedings charging to the Contractor, as aforesaid, any
sum or sums of money which he may pay and any expenses, whether for
reinstatement or otherwise which he may incur and the propriety of any payment,
defense or compromise, or of the incurrence of any such expense shall not be
called inquestion by the Contractor and will be recovered from the contractor.
The Contractor shall be held responsible for any obligations, damages and fines
etc. arising out of or in connection with the works either during their progress
or during the defects liability period and shall indemnify the MUNICIPAL
CORPORATION or the Commissioner against them and make good any such
damages, fines and dues arising out of noncompliance of any regulation by the
Contractor which may develop on the Corporation or the Commissioner.
The Contractor shall ensure timely payments to his workforce and meet all the
contractual commitments in terms of payments, insurance, safety of its workforce.
All statutory payments to the workforce shall be done immediately upon becoming
due. The proof of payments made and any statutory deductions from the wages of
the workforce shall be submitted within one week of making payments.
The commissioner reserves the right to carry out inspection, as and when required
without intimating the contractor, of the various locations where work is in
progress. Any shortcoming found during inspection will be intimated to the
contractor or his supervisor orally or in written which shall have to be attended
immediately by the contractor or his supervisor. The penalties imposed on the
contractor from time to time, shall be recovered from the Monthly Bill or adjusted
against the 5% SD amount. The corporation reserves the right to treat continuous
shortcomings as “Deficiency of Service” and terminate the Contract after giving
one month notice.
i) Notwithstanding the provisions of above, the contractor shall not be liable for
forfeiture of its Performance Security/ Contract Deposit, liquidated damages or
termination or other failure to perform its obligations under the contract is
result of an event of force Majeure.
ii) For purposes of this clause, “Force Majeure” means an event beyond the
control of the Contractor and not involving the Contractor’s fault or negligence
and not foreseeable. Such events may include, but are not restricted to, acts of
the Purchaser either in its sovereign or contractual capacity, wars or
revolutions, fires, floods, epidemics, quarantine restrictions and freight
iii) If a force Majeure situation arises, the Contractor shall promptly notify the
Purchaser in writing of such condition and the cause thereof. Unless otherwise
directed by the Purchaser in writing, supplier shall continue to perform its
obligations under the contract as far as is reasonably practical, and shall seek
all reasonable alternative means for performance not prevented by the Force
Force Majeure shall mean such an Event or Circumstance or combination of Events
and Circumstances which are beyond the reasonable control of the Affected Party
and which the affected party could not have prevented by Good Industry Practice
or by the exercise of reasonable skills and care for the purpose of discharging its
obligations under the Contract. The Force Majeure will tend to have material
adverse effect on the performance of such affected party.
Following shall be the events and circumstances of Force Majeure:
Act of War (whether declared or undeclared), invasion, armed conflict or act of
foreign enemy, blockade, revolution, riots, insurrection, civil commotion, act of
terrorism, or sabotage
The expropriation or Compulsory acquisition or seizure of the assets of The
Contractor by any Governmental Instrumentality, provided that this clause shall
not apply where such Act constitutes a remedy or sanction lawfully exercised as a
result of a breach by the Contractor of any Indian law or Indian Directive but
excluding any change in law.
Act of God epidemic, lightning, earthquake, cyclone, whirlwind, flood, tempest,
storm, drought, lack of water or other unusual or extreme adverse weather or
environmental conditions, action of the elements, meteorites, fire or explosion to
the extent generated from the source external to the Contractor or his assets due to
reasons other than, those caused by negligence of the Parties, chemical or
radioactive contamination or ionizing radiation.
Procedure for Calling Force Majeure: The affected party shall notify to the other
party in writing of the occurrence of the Force Majeure as soon as reasonably
practicable, and in any event within 24 hours (Twenty Four hours) after the
Affected Party knew, or ought reasonably to have known, of its occurrence and that
the Force Majeure would be likely to have a material impact on the performance of
its obligations under the Contract.
The notice shall include full particulars of the nature of Force Majeure event, the
effect it is likely to have on the Affected Party’s performance of its obligations and
the measures, which the Affected Party is taking, or proposes to take, to alleviate
the impact of the Force Majeure Event and restore the performance of its
obligations. When the affected Party is able to resume performance of its
obligations under this Contract, it shall promptly give the other party written
notice to that effect provided that in no event shall the suspension of performance
be of greater scope and of longer duration than is necessitated by Force Majeure.
The rights and obligations of the Affected Party shall be suspended to the extent
they are affected by the Force Majeure. RMC shall not be liable to make any
payments to the contractor for it being affected on account of Force Majeure.
RMC reserves the right to terminate the contract if the Force Majeure continues for
more than 15 (Fifteen) days at a stretch.
CANCELLATION OF CONTRACT IN FULL OR IN PART
a. If the Contractor at any time makes default in proceeding with the work
with due diligence and continues to do so after notice in writing of
fourteen days from the Dy. Municipal commissioner (SWM dept / Garden);
b. Commits default in complying with any of the terms and conditions of
contract and does not remedy it within fourteen days after a notice in
writing is given to him in that behalf by the Dy. Municipal commissioner
(SWM dept / Garden);, or
c. Fails to complete the works or items with individual dates completion, on
or before the date(s) of completion and does not complete them within the
period specified in a notice given in writing in that behalf by the Dy.
Municipal commissioner (SWM Dept.), or
d. Shall offer or give or agree to give to any person in MUNICIPAL
CORPORATION service or to any person on his behalf any gift or
consideration of any kind as an inducement or reward for doing or
forbearing to do or for having done or forborne to any other contract for
the MUNICIPAL CORPORATION, or
e. Shall obtain a contract with the MUNICIPAL CORPORATION as a result
of ring tendering or other non bonafide methods of competitive
f. Being an individual or a firm, any partner thereof, shall at any time be
adjudged insolvent or have a receiving order or order for administration
of his estate made against him or shall take any proceedings for
liquidation or composition (other than voluntary liquidation for the
purpose of amalgamation or reconstruction) under any Insolvency Act
for the time being in force or make any conveyance of assignment of his
effects or composition or arrangement for the benefit of his creditors or
purport so to do, or if any application be made under any insolvency
Act for the tile being in force for the sequestration of his estate or if a trust
deed be executed by him for his creditors; or
g. Being a company, shall pass a resolution or the court shall make an order
for the liquidation of his affairs, or a receiver or a manager on behalf of
the debenture holders shall be appointed or circumstances shall arise
which entitle the court of debenture holders to appoint a receiver or a
h. Shall suffer an execution being levied on his goods and allow it to be
continued for a period of 15 days, or
i. Assigns, transfers, sublets (engagement of labour on a piece work basis or
labour with materials not to be incorporated in the work, shall not be
deemed to be subletting) or attempts to assign, transfer or sublet, the
entire works or any portion thereof without the prior written approval of
the Commissioner; the Commissioner may without prejudice to any other
right or remedy which shall have accrued or shall accrue thereafter to
the MUNCIPAL CORPORATION by written notice cancel the contract as
a whole or only such items of work in default from the contract.
The Commissioner shall on such cancellation have powers to;
(a) Take possession of site and any materials, constructional plant,
implements, stores, etc., thereon and/or
(b) Carry out the work by any means at the risk and cost of the contractor.
On cancellation of the contract in full or in part the RMC shall
determine what amount, if any, is recoverable from the contractor for
completion of works or in case the works or part of works is not
completed, the loss or damage suffered by the MUNICIPAL
CORPORATION, in determining the amount, credit shall be given to the
contractor for the value of the work executed by him up to the time of
Any excess expenditure incurred or to be incurred by the
MUNICIPAL CORPORATION in completing the works or part of the
works or excess loss or damages suffered or may be suffered by the
MUNICIPAL CORPORATION as aforesaid after allowing such credit shall
be recovered from any money due to the Contractor on any account and if
such moneys are not sufficient the Contractor shall be called upon in
writing to pay the same within thirty days. If the Contractor shall fail to
pay the required sum within the aforesaid period of thirty days, the RMC
shall have right to sell any or all of the Contractor’s unused materials,
constructional plant, implements, temporary buildings etc. And apply the
proceeds of sale thereof towards the satisfaction of any sums due from
the Contractor under the contract, and if thereafter there be any balance
outstanding from the Contractor it shall be recovered in accordance with
provision of the contract.
Any sums in excess of the amounts due to the MUNICIPAL
CORPORATION and unsold materials, constructional plant etc. shall be
returned to the Contractor, provided always that if cost or anticipated cost
of completion by the MUNICIPAL CORPORATION of the works or part
of the works is less than the amount of which the Contractor would have
been paid had he completed the works or part of the works, such benefit
shall not accrue to the Contractor.
Without prejudice to the generality of the foregoing, the Contractor shall
deposit the amount, as security deposit shall be absolutely forfeited to the
MUNICIPAL CORPORATION for such failure, or breach or determination
FORECLOSURE OF CONTRACT IN FULL OR IN PART
If at any time after acceptance of the tender the Commissioner shall decide
to abandon or reduce the scope of the works for any reasons whatsoever
and hence not require the whole or any parts of the works to be carried out,
he shall inform the Contractor in writing to that effect and the Contractor
shall have no claim to any payment or compensation or otherwise
whatsoever, on account of any profit or advantage which he might have
derived from the execution of the works in full but which he did not
derive in consequence of the foreclosure of the whole or part of the works.
Provided always that nothing herein contained shall be deemed to render
the Contractor liable for or in respect of or to indemnify the Municipal
Corporation against any compensation or damage causes by the Excepted
TERMINATION OF CONTRACT
The Contract shall stand terminated at the end of the Contract period unless
extended by the corporation in writing. However RMC reserves the right to
terminate the contract at any time by giving 1 month (30 days) notice to the
GENERAL CONDITIONS OF CONTRACT
The Vehicles shall be operated & maintained by the successful contractor with his
personnel for a period of three years from the date of initial execution of the work,
SEVEN days a week for one shift and if required for two or three shifts. The tenderer
has to quote for one shift of 8 hour per day as per price format. The contractor shall
employ required supervisor, mechanics, technicians, one driver cum operator, and
skilled / unskilled labour per Vehicle. The contractor shall arrange for fuel, lubricant,
tools, spares and all consumables and all other related materials & expenditures for
smooth and uninterrupted working of Truck Mounted Mist Machine during the
period of contract.
‐ The contractor shall have to maintain logbooks & shift register, present register of
the staff / has to show certificate for work done. Contractor has to get work done
certificate from the concerned deptt./officers of RMC where/ under whom Vehicle/s
put in use in the Vehicle Log diary / certificate & copy of same must be enclosed
along with monthly bill submitted to Solid Waste Managaement deptt ; (as per RMC
instruction) RMC for payment procedure.
‐ For operating contract payment will be made only for those shifts for which work has
been carried out by contractor on the basis of rate quoted &/or sanctioned in tender.
‐ For comprehensive maintenance contract penalty will be imposed on the contractor
for delay work &off road period of the Vehicle if it is delayed beyond reasonable
time as mentioned below;
‐ All minor repairing & preventive maintenance work shall be carried out within
Hrs. otherwise penalty will be imposed & will be deducted from the monthly bill of
the contractor for the days for which Vehicle remain out of order as mentioned in
‐ All major repairing shall be carried out within 7 days otherwise penalty will be
imposed will be deducted from the monthly bill of the contractor for the days for
which Vehicle remain out of order as mentioned in penalty table.
‐ Minor work Includes: Routine service, Hose replacement, electrical work, external
leakages (oil/water/diesel), mechanical / hydraulic settings, radiator work, general
bodywork, clutch repairing, gear /transmission repairing minor work, filter repair /
replacement, tank repairing, Generator repairing etc. These shall be carried out at
site or at RMC’s parking place or as the case may be and allowed by RMC.
Major work Includes: Structural damages, Engine o/h related , Gearbox / clutch
related major work , major hydraulic repairing like Cannon damage, major
body work / chassis (structure) repairing work, Blower unit work for
Truck Mounted Mist Machine etc.
‐ If contractor fails to provide the driver cum operator as per the requirement of RMC
penalty will be imposed as mentioned in the penalty table & which will be deducted from
the monthly bill of the contractor. Further in such circumstances RMC is at liberty to use
the Vehicle with alternate arrangement & if any damages occur to the Vehicle, same also
must be set right by the contractor for which no extra payment / claim will be reimbursed
to the contractor by RMC and this shall be binding on the contractor.
The contractor shall be required to take comprehensive insurance for all the Vehicles
during the contract period. It will be the responsibility of the successful tenderer to have
insurance coverage of their operating staff also. They are requested to note that there will
not be any reimbursement in this regard by RMC. As regards any mishap / accident
happened on the road or at site, the successful tenderer will have to shoulder the
complete responsibility of the same, right from registration of Police complaint, lodging /
follow up of the insurance claim and facing the court trials etc. It shall be the
responsibility of successful tenderer to set right the Vehicle without raising any extra bills
/ claim against the same to RMC. However, they shall be liable to receive all the payments
received by RMC (if issued to RMC by insurance company) against the settlement of
insurance claims from the Insurance Institutions as per rules / they can get reimbursement
directly from the insurance company. RMC authorities shall give the full cooperation to
the successful tenderer by signing the requisite documents necessary for raising the
insurance claim up to settlement of the same.
The work force provided by the contractor shall have to be properly dressed in uniform
and shoes, safety gears for work requirement all the time. Each person provided by the
contractor shall have to display the Identity Card on the uniform, with photo.
‐ Contractor has to arrange for all drivers, Mechanics, labour, etc. & incur their salaries,
wages, etc. as per the prevailing rules and regulations & all liabilities and responsibilities
also lies with him.
‐ The Contractor shall ensure that his personnel report to works everyday at designated
time and continue working throughout the day. The Contractor shall make provision for
presence of requisite manpower during national holidays and festivals etc. as per RMC
requirement. The corporation for working on holidays, national holidays and festivals
will make no separate payments. The Contractor shall ensure presence of his workforce at
the specified time and place.
‐ The Contractor will be solely responsible for any consequences under laws, arising out of
any accident caused by his Vehicles, equipments &/or his employees to the property or
personnel of the corporation &/or third party under this contract.
‐ The corporation shall not be responsible for any claim / compensation that may arise due
to damages / injury / death pilferage to the Contractor’s Vehicles, equipments, property,
staff and any third party or the property, under any circumstances while providing
services under the Contract.
‐ Force Majeure shall mean such an Event or Circumstance or combination of Events and
Circumstances which are beyond the reasonable control of the Affected Party and which
the affected party could not have prevented by Good Industry Practice or by the exercise
of reasonable skills and care for the purpose of discharging its obligations under the
Contract. The Force Majeure will tend to have material adverse effect on the performance
of such affected party.
The Contract shall stand terminated at the end of the Contract period unless extended by
the corporation in writing. In case if R.M.C. found continuous shortcomings in the
services of the contractor, which will be treated as “Deficiency of Service” and RMC in
such event can terminate the Contract with prior notice of 30 days.
‐ The contractor shall obtain all necessary approvals, permits and licenses to operate the
said service. The corporation shall in no way be responsible for the loss occurring to the
contractor on this count.
‐ The commissioner reserves the right to impose additional financial penalty not exceeding
10% of the monthly bill in a month in case the work is not found up to the mark, during
the routine inspection carried out by the corporation’s staff ( if required, in case of
continuous lapses). The decision on amount of penalty within the above limit is at sole
discretion of the Municipal Commissioner and shall be binding on the contractor. This
penalty will be over and above the routine penalties as mentioned earlier for
non‐performance as per the conditions.
The Contractor shall indemnify the corporation and its employees against any penalties as
PRINCIPAL EMPLOYEER, for any failure of the Contractor to honor various State Laws /
Enactments / Contract Labour (R&A) Act 1970 (C) / Minimum wages Act / Bonus Act /
EPF & MP Act etc. and any other law prevailing during the entire contract period.
The operation & maintenance contract rate quoted by tenderer will be fixed for entire
years contract period. Only diesel price variation during the contract period will be
considered for which tenderer must have to clearly specify the % loading towards diesel
part in the operation contract without fail , which will be considered for diesel price
variation. Fuel cost increase or decrease will be allowed every quarterly & rate applicable
in the first week of new quarter will be taken in to consideration. Base rate will be the rate
applicable on the date of commencement of work. The formula for determining the
increase or decrease in the rate from the base rate will be as under;
Change in Diesel Part (E) Rs. = A x B (C÷D-1)
New Rate of operation contract for quarter = A± E
A = current rate of operation contract
B = % age loading of diesel part in operation contract
C = Rate of diesel in this quarter
D = Rate of diesel in previous quarter
E = Change in diesel part
New rate will be sum of Maintenance contract rate and new rate of op. contract for the
- During the contract period, necessary infrastructure like parking / repairing
plot/area, water, drainage, electricity will be provided by RMC. However if any
temporary storage / repairing facility required to be created, same will be carried out
by contractor at their own cost with prior approval of concerned RMC authority. At
the end of / as per the direction of RMC even during the contract period, contractor
has to vacate the place allotted to them & remove the facilities if any created by them
without any delay.
- The Contractor has to arrange for O & M of Vehicles outside of Rajkot city as and
when required by RMC.
- Mobile phone and other communication equipments shall have to be provided for
each Vehicle and to the supervisors for effective communication. Contractor has to
arrange for 24 hrs. Complain register phone No. For effective communication.
- At the end of O & M contract period, tenderer has to hand over the Vehicles in
satisfactory working conditions acceptable to Municipal Commissioner &/or his
authorized representative/s of SWM deptt. Otherwise penalty will be imposed by
RMC at the discretion of Municipal Commissioner & shall be binding to the
- All financial arrangement for this work shall be arranged by the Contractor. RMC
shall not be responsible for the financial constraints of the contractor.
- Contractor shall provide labor, semi skilled and skilled staff for operating the project
during the period of contract. The salary of staff and all other expenses shall be
borne by the contractor.
- Contractor shall have to depute sufficient staff for monitoring / reporting of various
activities related to contract.
- The Contractor shall be responsible for any damage occurring to the corporation’s
property and general public, in case the cause is attributed to the
cleaners/supervisors. The contractor shall have to get the same rectified at his own
cost and risk, or
otherwise, the corporation at the risk and cost of the contractor shall attend
- The Contractor shall ensure, at all times that his supervisors/cleaners do not
misbehave with the corporationʹs staff or general public while on duty. The
personnel found misbehaving shall be immediately removed from the work at the
risk of the contractor.
- The corporation shall not be responsible for any injury/death to the any staff of
contractor including drivers, supervisors, cleaners etc deployed by them. It is the
responsibility of the contractor to ensure that his personnel follow the safety
regulations strictly, which is in force from time to time.
- The Contractor shall obtain all necessary approvals, permits and licenses to operate
the said service. The corporation shall in no way be responsible for the loss occurring
to the contractor on this count.
- Contractor shall take all necessary insurances for the said work and workforce.
Insurance for Third Party Liability arising out of Contractorʹs vehicle, equipment,
cleaning agents or workforce shall also be taken from the first day of operation.
Corporation shall not be responsible for any losses occurring to the Contractor or
third party on this count.
- The commissioner reserves the right to impose financial penalty not exceeding 10%
of the monthly bill over and above the penalty mentioned for various defaults in
penalty clause in a month in case the work is not found up to the mark during the
routine inspection carried out by the Municipal Commissioner or corporation’s staff.
The decision on amount of penalty within the above limit is sole discretion of the
commissioner and shall be binding on the contractor.
- The Contractor shall maintain a First Aid Kit and other necessary medicines
including bandages, antiseptic creams/liquid, anti burn cream/powder as required to
attend to any emergency situations.
- The Contractor shall indemnify the corporation and its employees against any
penalties as PRINCIPAL EMPLOYEER, for any failure of the Contractor to honors
various State Laws / Enactments / Contract Labor (R&A) Act 1970 (C) / Minimum
wages Act / Bonus Act / EPF & MP Act / any laws affecting such services etc.
- The tenderershall note that MUNICIPAL COMMISSIONER OF RAJKOT shall not
be responsible for any mishap or accident to workmen of the contractor or
MUNICIPAL CORPORATION OF AHMEDABADʹs employee working at site,
while performing these jobs and no compensation shall be payable by
MUNICIPAL CORPORATION OF RAJKOT. In case of mishap or accident, the
amount of compensation decided by the concerned authorities will be kept in
deposit from contractor’s bills/ will be paid by contractor. The successful tenderer
shall take all the precautions to avoid any damages to municipal property while
working. If any damage is noticed, the charges for setting right the same will be
recovered from their bills.
i) In case the successful bidder fails to deliver the services as stipulated in the
tender, the Commissioner reserves right to get it done from alternate
sources at risk, cost and responsibility of successful bidder.
ii) If it is observed that the Contractor carrying out the work fail to comply
with instructions given by the authorities at the Dy. Municipal
Commissioners/Municipal Commissioner’s level during execution of work
thrice, the work will be terminated and will be carried out at the risk and
cost of the contract & penal action will be taken against them. This decision
will not be arbitrable at all.
iii) The above condition will be in addition to the relevant condition in General
Conditions of Contract regarding cancellation of full or part of the work,
finality of the decision of the disputes, differences or claims raised by the
contractors relating to any matter arising out of the contract
The successful Contractor shall have to enter in to an Agreement with Rajkot
Municipal Corporation.
This is subject to the jurisdiction of the competent court of Rajkot only.
Tenderer’s Sign ENVIRONMENT ENGINEER
With seal SOLID WASTE MANAGEMENT
RAJKOT MUNICIPAL CORPORATION
INFRASTRUCTURE & UTILITIES
The corporation shall provide locations for parking, minor repair and maintaining
the Vehicles. Necessary energy charges, water charges, property tax (if any, when
separate plot for regular parking and repair ‐ maintenance is given to contractor
by RMC, based on RMC policy‐ norms) and other govt. levies etc will be borne by
All necessary infrastructure shall be developed by contractor at their own cost after
permission from the RMC, zonal SWM dept for O & M contract work, (when
separate plot for regular parking and repair ‐ maintenance is given to contractor
by RMC) and such infrastructure shall be a removed at the end of contract / as per
the direction of RMC even during the contract period by contractor and contractor
has to vacate the place allotted to them & remove the facilities if any created by
them without any delay.
Contractor’s Sign ENVIRONMENT ENGINEER
With seal SOLID WASTE MANAGEMENT
RAJKOT MUNICIPAL CORPORATION
QUALIFICATION/ELIGIBILITY CRITERIA
• Similar Contract Work means : Manufacturer &/or Supplier of such & / or other
type of mist canon related vehicles or its authorized dealer / distributor or service
provider of liquid management based chassis mounted vehicles for Municipal
Utility work either on rental basis by providing his own Vehicles & / or under O &
M contract basis by using department / authorityʹs Vehicles & / or under integrated
waste management work by using such Vehicles can take part in the tender for
which necessary documentary proof should be enclosed with tender. If the tenderer
is Authorized dealer/ Distributor of the manufacturer, a latest Authority letter
should be submitted. If tender is quoted by Municipal utility service provider then
he has to submit the details of Truck Mounted Mist Machine he quote along with
latest agreement for this tender with its original Vehicle manufacturer &/or supplier
as per tender requirements to qualify in the tender. However original Vehicle
manufacturer/ supplier must possesses requisite quantity and other criteria for
Vehicle supply and performance as mentioned in the experience clause. Necessary
documentary proof shall be attached with the tender.
• Note: No JV will be Allowed.
Financial Criteria
A. Turn Over: The minimum annual Turnover of the Truck Mounted Mist Machine
Manufacturer/OEM/Supplier should be 340.77 Lakhs in any one year over last 7 years.
Separate Chartered Accountant’s certificate shall be attached along with the Bid by
B. Working Capital: The bidder should have to undertake that he has access to or has
available, liquid assets (aggregate of working capital, cash in hand and uncommitted
bank guarantees) and /or credit facility more than or equal to Rs. 85 Lakh. Separate
Chartered Accountant’s certificate shall be attached along with the Bid by Tenderer.
Experience Criteria:
A. Only duly registered firm/company can submit bids.
B. Provide certificate of GSTIN Registration.
C. Registration
The bidder shall have the following registrations and details of the same be
provided in the Technical Bid :
i) PF registration.
ii) Labor Licence/ESIC Registration
D. The tenderer shall furnish a satisfactory performance certificate from Government or
semi-government or ULB in India from any one similar contract work as mentioned
above of Rs. 136.30 Lakhs of Truck Mounted Mist Machine 8000 Liters capacity for
machine supply & its O & M in last seven financial years, with self-attested copies of
purchase orders received from those clients.
E. Non‐Black Listing Bond:
The Tenderer ( both Supplier and Service Provider) has to furnish the undertaking
on the non-judicial stamp paper of Rs.300/- duly Notarized regarding his firm is not
black listed in anywhere in India at the time of e-tendering. This undertaking should
be submitted during the physical submission of Qualification documents.
(A) Disqualification
Even though the Applicants meet the above criteria, they are subject to be
disqualified and forfeiture of EMD (with approval of competent authority)
and agency will be debarred from RMC, if Applicant or any of its
constituent partners/consortium members has:
Made misleading or false representation in the forms, statements, and
attachments submitted; or
Been debarred by Central govt. organization/State govt.
organization/RMC or any other Agency of Government of India or any of
the State Governments/ULBs.
In case of a proprietary firm, partnership firm the following are the
disqualification criteria:
(i) If, any of the member/partner or the proprietor is debarred by Central
govt. organization/
State govt. organization /RMC or any other Agency of Government of
India or any of the State Governments/ULBs.
(ii) If, any of the partners or the proprietor has a criminal history or has been
convicted by any court of law for any of the offenses under any Indian
iii) If, any criminal proceeding is pending in any court of law in India against
any of the partner or a proprietor and if any such proceeding culminates
into conviction in last seven years.
Note: The experience as sub contractor shall not be considered
Contractor’s Sign ENVIRONMENT ENGINEER
With seal SOLID WASTE MANAGEMENT
RAJKOT MUNICIPAL CORPORATION
Details of Tenderer
Submit details of all members of association partners)
1. (a) Name of firm :
(b) Address of the office(s)
(c) Date of incorporation and/or commencement of business
Brief description of the Tenderer.
2. Details of individual(s) who will serve as the point of
contact/communication for RMC with the Tenderer / contractor:
(b) Designation:
(c) Company/Firm:
(e) Telephone number:
(f) E-mail address:
(g) Fax number:
(h) Mobile number:
4. Name, Designation, Address and Phone Numbers of Authorized Signatory
(b) Designation:
(c) Company/Firm:
(e) Telephone number:
(f) E-mail address:
(g) Fax number:
(h) Mobile number:
5. Details of Principal Manufacturer/supplier
(b) Designation:
(c) Company/Firm:
(e) Telephone number:
(f) E-mail address:
6. Details of the equipment supplied as per Clause 1.0, Appendix
• Specification
• Brief description
• Delivery Schedule
S.No Details Action Remarks
1 Whether tendering firm/company is duly Say Yes/No
registered? Name of the registering
authority.(attach certificate)
2 Whether the tenderer is the Manufacturer Put ‘X’ or ‘V’
of the Vehicles/ Equipment proposed to Manufacturer
be supplied or is he the Authorized • Authorised dealer.
dealer/ Distributor of the manufacturer? • Distributor
(Attach certificates)
3 Details of Vehicles /Equipment (as Say Yes / No.
mentioned in the tender) supplied in the
preceding five years Attach separate sheet
4 Attach performance certificates from the Say Yes / No.
past purchasers together with attested Attach Certificate
copies of purchaser order received from
those clients as mentioned in the
qualification criteria.
5 Whether the tenderer and / or his Say Yes / No.
authorized dealer / service provider have
been black listed / work terminated by
any civic authority/department / any
govt. or semi govt. authority?
6 Details of / O & M contract basis /
integrated project basis work for Garden
work related / Municipal utility
FINANCIAL QUOTATION
COMPULSORY ONLINE
Financial Quotation for the Tender for Supply, Delivery, Testing, Commissioning
& Comprehensive Operation and Maintenance contract for 5 (Five) Years of
Truck Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity) ‐ 03 Nos. As
per RMC tender specifications, scope of work & terms ‐ conditions.
The Municipal Commissioner
Rajkot Municipal Corporation.
. Rajkot -390001
Sub: Financial Quote for Tender for Supply, Delivery, Testing, Commissioning &
Comprehensive Operation and Maintenance contract for 5 (Five) Years of Truck
Mounted Mist Machine (with appx. 8000 Ltr. Tank Capacity) ‐ 03 Nos. As per
RMC tender specifications, scope of work & terms ‐ conditions.
Dear Sir/Madam,
We, hereby, having reviewed and fully understood all the terms and conditions of
this Tender Document, submit our financial quote for the supply of following
equipment and its O & M work as per the tender terms and scope of work for your
evaluation. The price quoted includes packing, forwarding charges, insurance, all
taxes and duties etc. Delivery will be made at Rajkot, Gujarat at site specified by
RMC and will be as per Appendix 1 of the Tender Document.
Notwithstanding any qualifications or conditions, whether implied or otherwise,
contained in our Quotation we hereby represent and confirm that our Quotation is
unconditional in all respects and we agree to the terms of this Tender Document.
RAJKOT MUNICIPAL CORPORATION
SCHEDULE OF PRICE (A)
OF 03 NOS. TRUCK MOUNTED MIST MACHINE UNDER 15TH FINANCE
COMMISSION AS PER TECHNICAL SPECIFICATIONS & TERMS.”
Sr. Quantity in
Description of Item (In Rupees)
SUPPLY, DELIVERY, TESTING &
COMMISSIONING OF 03 NOS.
TRUCK MOUNTED MIST
MACHINE UNDER 15TH
FINANCE COMMISSION AS PER
TECHNICAL SPECIFICATIONS &
Quoted price (CAB Chassis with
1 PTO + Equipment) should be Price to be
inclusive of all taxes and duties
like GST, To & Fro, Transportation Online
charges, Transits Insurance, entry
taxes, other applicable levies, third
party insurance, TPI fee, RTO
passing charges and F.O.R. at
SWM Store RAJKOT MUNICIPAL
CORPORATION, RAJKOT.
Sign of e-Tenderer
SCHEDULE OF PRICE (B)
contract of TRUCK MOUNTED MIST MA CH IN E S - 0 3 N OS . as
per specification, scope of work and conditions mentioned in
Sr. working per
Particulars Qty.
No. machine per
CO M PRE H E NS I VE O PE R A T I O N
1 M A CH I NE S- 03 NO S. AS P E R 03 Nos. Quoted
SPE C IF I C AT IO N, S CO PE OF Online
WORK A ND C O N DI T I O N S
Please provide information on applicable fields.
Yours faithfully,
For and on behalf of (Name of Supplier)
Duly signed by the Authorized Signatory of the Supplier
(Name, Title and Address of the Authorized Signatory)
Sign of e-Tenderer
I / We agree that all the clause, information mentioned in this tender document are correct as
per my knowledge and I / We have read and understood all the terms and conditions
mentioned in document carefully. I / We abide to agree and follow to the terms and
conditions stated in the tender.
I/We agree that we have no objection if inquiries are made about our works, its related areas
and any other inquiry regarding all details, projects and works listed by us in the
prequalification document at any state.
Date:- Name of Tenderer:-
Place:- Sign / Stamp
General Information:
All individual firms are requested to complete the information in this form. Individual
information should be provided for all owners, directors or applicants that are partnerships
public / Pvt. Ltd. or individually owned firms.
1 Name of firm:
2 Type of firm: Proprietary/ Partnership/ Pvt. Ltd./Public Ltd/NGO
3 Head office address:
4 Local office address (if any):
5 Authorised Person :
6 Mobile: Contact:
7 Landline: Contact:
8 Facsimile: Fax:
10 Place of incorporation / registration: Year of incorporation / registration:
11 Main lines of business:
Financial statements:
‐ Bidder shall furnish Turnover certificate for Last Seven financial years
separate CA certificate shall be submitted.
History of litigation & Black listing ,Debarring :
Applicant should provide information on any history of litigation or arbitration & Black
listing, Debarring resulting from contracts with Any Municipal corporation, ULBs, Central
Govt, State Govt, Govt Authority etc..
Year Award for / or Name of Client, cause Disputed Validity Period
Against applicant of Litigation and amount in
matter of dispute & Rupees
Note: If the information to be furnished in this schedule is not given and come to the
knowledge of RMC subsequently it will result in disqualification of the bidder.
Also submit latest status along with documentary evidences.
Photographs of Partners / Managing Director / Proprietor / Directors / Power of attorney
1 I/We agree that the decision of the Rajkot Municipal Corporation in pre-
qualification/selection of applicants/contractor, Phasing of work and in any other
project related matter, will be final and binding to the me/us.
2 All the information and date furnished herewith are correct to my/our best of
3 I/We agree that I/we have no objection if inquiries are made about our works, its
related areas and any other inquiry regarding all details, projects and works listed
by us in the pre-qualification document at any state.
Signature with seal of the company
DECLARATION OF THE CONTRACTOR :
I / We hereby declare that I / We have made myself /ourselves thoroughly conversant with
the local conditions regarding scope of work, all materials and labour on which I / We have
based my / our rates for this tender. The specifications and leads on this work have been
carefully studied and understood before submitting this tender. I / We undertake to use only
the best materials approved by the Engineer in charge or his duly authorized representative
during execution of the work and to abide by the decision of RMC.
Signature of Applicant
AFFIDAVIT * Rs. 300 Stamp / Value as per new norms :
DECLARATION OF THE CONTRACTOR:
1.0 I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct. I also understand that in case of wrongful/false
information, corporation is entitled to take any civil & criminal punitive action
2.0 The undersigned also hereby certifies that neither our firm M/s
_______________________ _____________________ nor any of its constituent
partners, directors etc have abandoned any work in India nor any contract awarded
to us for such works has been rescinded. Our firm is also not black listed by any
Central govt. organization / State Govt. organization / ULB / Any Municipal
Corporation / RMC or any other Agency of Government of India or any of the State
3.0 The undersigned hereby authorize(s) and request(s) any bank, person, authorities,
Government, or public limited institutions, firm or corporation to furnish pertinent
information deemed necessary and requested by the RMC to verify our statements
or our competence and general reputation.
4.0 The undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the RMC.
5.0 The RMC and its authorized representatives are hereby authorized to conduct any
inquiries or investigations to verify the statements, documents, and information
submitted in connection with this application and to seek clarification from our
bankers and clients regarding any financial and technical aspects. This Affidavit will
also serve as authorization to any individual or Authorized representative of any
institution referred to in the supporting information, to provide such information
deemed necessary and requested by you to verify statements and information
provided in the Tender or with regard to the resources, experience and competence
of the Applicant.
I / We hereby declare that I / We have made myself / ourselves thoroughly conversant with
the local conditions regarding scope of work, all materials and labour on which I / We have
based my / our rates for this tender. The specifications and leads on this work have been
carefully studied and understood before submitting this tender. I / We undertake to use only
the best materials approved by the Engineer in charge or his duly authorized representative
during execution of the work and to abide by the decision of RMC.
Signed by the Authorized signatory of the firm
Title of the office
Name of the firm
Note: The affidavit format as indicated above to be furnished on non-judicial stamp Paper of
amount as per latest rules and duly notarized.
Format for Bank Guarantee
B.G. No. Dated:
1. In consideration of you, *****, having its office at *****, (hereinafter referred to as the
“Authority”, which expression shall unless it be repugnant to the subject or context
thereof include its, successors and assigns) having agreed to receive the Bid of
…………………… (a company registered under the Companies Act, 1956) and
having its registered office at……………………… (hereinafter referred to as the
“Bidder” which expression shall unless it be repugnant to the subject or context
thereof include its/their executors, administrators, successors and assigns), for the
***** Project on basis (hereinafter referred to as “the Project”) pursuant to the
Document dated …………… issued in respect of the Project and other related
documents including without limitation the draft concession agreement (hereinafter
collectively referred to as “Bidding Documents”), we (Name of the Bank) having our
registered office at……………………… and one of its branches at ……………………..
referred to as the “Bank”), at the request of the Bidder, do hereby in terms of Clause
of the Tender Document, irrevocably, unconditionally and without reservation
guarantee the due and faithful fulfilment and compliance of the terms and
conditions of the Bidding Documents (including the entire tender Document) by the
said Bidder and unconditionally and irrevocably undertake to pay forthwith to the
Authority an amount of Rs. ***** (Rupees ***** only) (hereinafter referred to as the
“Guarantee”) as our primary obligation without any demur, reservation, recourse,
contest or protest and without reference to the Bidder if the Bidder shall fail to fulfil
or comply with all or any of the terms and conditions contained in the said Bidding
2. Any such written demand made by the Authority stating that the Bidder is in default
of the due and faithful fulfilment and compliance with the terms and conditions
contained in the Bidding Documents shall be final, conclusive and binding on the
3. We, the Bank, do hereby unconditionally undertake to pay the amounts due and
payable under this Guarantee without any demur, reservation, recourse, contest or
protest and without any reference to the Bidder or any other person and irrespective
of whether the claim of the Authority is disputed by the Bidder or not, merely on the
first demand from the Authority stating that the amount claimed is due to the
Authority by reason of failure of the Bidder to fulfil and comply with the terms and
conditions contained in the Bidding Bid Document - for . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . .Tender Name . . . . . . . . . . . . . . . . Documents including failure
of the said Bidder to keep its Bid open during the Bid validity period as set forth in
the said Bidding Documents for any reason whatsoever. Any such demand made on
the Bank shall be conclusive as regards amount due and payable by the Bank under
this Guarantee. However, our liability under this Guarantee shall be restricted to an
amount not exceeding Rs. ***** (Rupees ***** only).
4. This Guarantee shall be irrevocable and remain in full force for a period of 180 (One
Hundred eighty days) days from the Bid Due Date inclusive of a claim period of
(sixty) days or for such extended period as may be mutually agreed between the
Authority and the Bidder, and agreed to by the Bank, and shall continue to be
enforceable till all amounts under this Guarantee have been paid.
5. We, the Bank, further agree that the Authority shall be the sole judge to decide as to
whether the Bidder is in default of due and faithful fulfilment and compliance with
the terms and conditions contained in the Bidding Documents including, inter alia,
the failure of the Bidder to keep its Bid open during the Bid validity period set forth
in the said Bidding Documents, and the decision of the Authority that the Bidder is
in default as aforesaid shall be final and binding on us, notwithstanding any
differences between the Authority and the Bidder or any dispute pending before any
Court, Tribunal, Arbitrator or any other Authority.
6. The Guarantee shall not be affected by any change in the constitution or winding up
of the Bidder or the Bank or any absorption, merger or amalgamation of the Bidder
or the Bank with any other person.
7. In order to give full effect to this Guarantee, the Authority shall be entitled to treat
the Bank as the principal debtor. The Authority shall have the fullest liberty without
affecting in any way the liability of the Bank under this Guarantee from time to time
to vary any of the terms and conditions contained in the said Bidding Documents or
to extend time for submission of the Bids or the Bid validity period or the period for
conveying acceptance of Letter of Award by the Bidder or the period for fulfilment
and compliance with all or any of the terms and conditions contained in the said
Bidding Documents by the said Bidder or to postpone for any time and from time to
time any of the powers exercisable by it against the said Bidder and either to enforce
or forbear from enforcing any of the terms and conditions contained in the said
Bidding Documents or the securities available to the Authority, and the Bank shall
not be released from its liability under these presents by any exercise by the
Authority of the liberty with reference to the matters aforesaid or by reason of time
being given to the said Bidder or any other forbearance, act or omission on the part
of the Authority or any indulgence by the Authority to the said Bidder or by any
change in the constitution of the Authority or its absorption, merger or
amalgamation with any other Bid Document- for . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . .Tender Name . . . . . . . . . . . . . . . .in the State of Gujarat person or any
other matter or thing whatsoever which under the law relating to sureties would but
for this provision have the effect of releasing the Bank from its such liability.
8. Any notice by way of request, demand or otherwise hereunder shall be sufficiently
given or made if addressed to the Bank and sent by courier or by registered mail to
the Bank at the address set forth herein.
9. We undertake to make the payment on receipt of your notice of claim on us
addressed to [name of Bank along with branch address] and delivered at our above
branch which shall be deemed to have been duly authorised to receive the said
notice of claim.
10. It shall not be necessary for the Authority to proceed against the said Bidder before
proceeding against the Bank and the guarantee herein contained shall be enforceable
against the Bank, notwithstanding any other security which the Authority may have
obtained from the said Bidder or any other person and which shall, at the time when
proceedings are taken against the Bank hereunder, be outstanding or unrealised.
11. We, the Bank, further undertake not to revoke this Guarantee during its currency
except with the previous express consent of the Authority in writing.
12. The Bank declares that it has power to issue this Guarantee and discharge the
obligations contemplated herein, the undersigned is duly authorised and has full
power to execute this Guarantee for and on behalf of the Bank.
13. For the avoidance of doubt, the Bank’s liability under this Guarantee shall be
restricted to Rs. *** (Rupees ***** only). The Bank shall be liable to pay the said
amount or any part thereof only if the Authority serves a written claim on the Bank
in accordance with paragraph 9 hereof, on or before [*** (indicate date falling
days after the Bid Due Date)].
Signed and Delivered by ………………………. Bank
By the hand of Mr./Ms. …………………….., its ………………….. and authorised official.
(Signature of the Authorised Signatory)
(Official Seal)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
e-Tender-SITC-O and M Truck Mounted Mist Machine-2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .