Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-Finance 874 B GANGA RAM KA BADA SHEETLAMAI GHAMAPUR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹3.7 L+₹7,829.35 (2.16%)Accepted-Finance | L2 | Accepted-Finance Being L2 | |
| 3 | L3₹4.9 L+₹1.3 L (35.1%)Accepted-Finance | L3 | Accepted-Finance Being L3 | |
| 4 | L3₹4.9 L+₹1.3 L (35.1%)Accepted-Finance | L3 | Accepted-Finance Being L3 | |
| 5 | L4₹9.1 L+₹5.5 L (150.6%)Accepted-Finance | L4 | Accepted-Finance Being L4 |
Tender Value
₹9.8 L
EMD Value
₹20,000
Closing Date
5 Dec 2022, 3:30 pmClosed
SUPERINTENDING ENGINEER TandC CIRCLE MPPTCL BHOPAL
BLOCK NO. S-3 , ADMINISTRATIVE BUILDING BIJLI NAGAR COLONY GOVINDPURA BHOPAL
COMPLETE ERECTION WORK OF INSTALLATION OF ADDITION 40MVA (MAKE-ABB) TRANSFORMER WITH 132KV AND 33KV BUS COUPLER BAY AND ITS ASSOCIATED WORK AT SEONI-MALWA 132KV SUBSTATION
2022_MPPTC_233126_1
TS-43/2022
Open Tender
Manpower Supply
Percentage
365 days
SEONI MALWA 132KV SUBSTATION
Please refer Tender documents.
13 documents required · 13 mandatory
₹590
₹20,000
Yes
23 Jan 2023
18 Nov 2022
6 Dec 2022
18 Nov 2022
5 Dec 2022
18 Nov 2022
eProcurement System Government of Madhya Pradesh Created By: PURNIMA KARERA Created Date/Time: 23-Jan-2023 02:53 PM Tender Title: COMPLETE ERECTION WORK OF INSTALLATION OF ADDITION 40MVA (MAKE-ABB) TRANSFORMER WITH 132KV AND 33KV BUS COUPLER BAY AND ITS ASSOCIATED WORK AT SEONI-MALWA 132 KV SUBSTATION Tender ID: 2022_MPPTC_233126_1
Tender Inviting Authority:
Name of Work: Complete Erection of installation of addition 40MVA (make-ABB) transformer with 132KV & 33KV Bus Coupler bay and its associated work at Seoni-Malwa 132KV S/s.
Contract No: (Tender ID Reference No. ) TS-43/2022
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Online Engineers(GSTN-23AXUPS9818D1ZW) 978668.99 -7.28 907421.89 Nine Lakh Seven Thousand Four Hundred and Twenty One
2.00 AMIT PRAKASH TRIPATHI(GSTN-23AGQPT2463C1ZD) 978668.99 -50.00 489334.50 Four Lakh Eighty Nine Thousand Three Hundred and Thirty Four
3.00 S N ENERGY(GSTN-23AIYPY9142K1Z8) 978668.99 -62.20 369936.88 Three Lakh Sixty Nine Thousand Nine Hundred and Thirty Six
4.00 SHRI KRISHNA ASSOCIATES(GSTN-23ABEPL5341A2ZB) 978668.99 -63.00 362107.53 Three Lakh Sixty Two Thousand One Hundred and Seven
5.00 M R ELECTRICAL CONSULTANT(GSTN-NA) 978668.99 -50.00 489334.50 Four Lakh Eighty Nine Thousand Three Hundred and Thirty Four
Lowest Amount Quoted BY: SHRI KRISHNA ASSOCIATES(362107.53)
BOQ Summary Details Tender Title: COMPLETE ERECTION WORK OF INSTALLATION OF ADDITION 40MVA (MAKE-ABB) TRANSFORMER WITH 132KV AND 33KV BUS COUPLER BAY AND ITS ASSOCIATED WORK AT SEONI-MALWA 132 KV SUBSTATION Tender ID: 2022_MPPTC_233126_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SHRI KRISHNA ASSOCIATES 362107.53 L1
2 S N ENERGY 369936.88 L2
3 M R ELECTRICAL CONSULTANT 489334.50 L3
4 AMIT PRAKASH TRIPATHI 489334.50 L3
5 Online Engineers 907421.89 L4
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .