Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 1 7 80 TO 87 MITHONA TOWERS 1 PRENDERGHAST ROAD SECUNDERABAD HYDERABAD TELANGANA 500003 | HYDERABAD | TELANGANA | 500003 | Admitted-Finance |
| 3 | Admitted-Finance 0 TOYO HOUSE LBS MARG KANJURMARG WEST MUMBAI MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
20 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
As per LIB
As per LIB
EPCC_5 package_ MS Block and Octamax Unit for LuPech J18 Project
2021_REFHQ_140936_1
077154C/T/ LuPech(J18)/LSTK-5
Limited
Lump Sum TurnKey
Lump-sum
780 days
Vadodara
As per LIB
5 documents required · 5 mandatory
Exempted
Online
3 Feb 2022
17 Sept 2021
21 Dec 2021
17 Sept 2021
20 Dec 2021
1 Dec 2021
17 Sept 2021 - 29 Oct 2021
1 Nov 2021
180 days
Amount
Project Management, Consistency Checks, Residual Process Engineering, Detailed Design Engineering including HAZOP, HAZID, SIL Study & Other Safety Studies as mentioned in Bidding Documents, Site enabling jobs including grade filling and roads, Topography Survey and Soil Investigation, underground scanning, Demolition/ Dismantling of existing structures/Re-routing works mentioned in the bid and co-ordination for the same with OWNER/PMC, Total Procurement (including chemicals, catalysts, first fill of chemicals and lubricants consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation and refractory works, Painting, Fireproofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Precommissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of MS BLOCK (NSU+NHT+ISOM) + OCTAMAX UNIT, Control room, Security Gate houses, interconnection systems as per bidding document, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during Defect Liability Period and supply of Chemicals, Catalysts (other than free issue), Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2] AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder/Indian Member of Consortium/JV, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for DCS/ESD/ PLC System for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Vendor Proprietary PLC / PLC for packages for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for ANALYSERS for MS BLOCK and OCTAMAX UNIT as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for CEMS ANALYSERS SYSTEM FOR MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for GDS system for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for AMADAS for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for MMS/CMS for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance CCTV System for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PAGING System for MS Block as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HVAC System for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for AC UPS system for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DC BATTERY CHARGER for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HEATER CONTROL PANEL for MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VFD for MS BLOCK and Octamax Unit as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Gate House Security System under MS BLOCK as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR EPCC-05 AS PER BIDDING DOCUMENT
NSU - Design Case-1
GUARANTEED POWER CONSUMPTION
GUARANTEED COOLING WATER CONSUMPTION
FUEL GAS CONSUMPTION
NSU - Design Case-2
GUARANTEED POWER CONSUMPTION
GUARANTEED COOLING WATER CONSUMPTION
FUEL GAS CONSUMPTION
NHT UNIT- Design Case-1
GUARANTEED POWER CONSUMPTION
GUARANTEED COOLING WATER CONSUMPTION
FUEL GAS CONSUMPTION
NHT UNIT- Design Case-2
GUARANTEED POWER CONSUMPTION
GUARANTEED COOLING WATER CONSUMPTION
FUEL GAS CONSUMPTION
PENEX Unit - DESIGN CASE-1
GUARANTEED POWER CONSUMPTION
HP STEAM CONSUMPTION
MP STEAM CONSUMPTION
LP STEAM CONSUMPTION
GUARANTEED COOLING WATER CONSUMPTION
PENEX Unit - DESIGN CASE-2
GUARANTEED POWER CONSUMPTION
HP STEAM CONSUMPTION
MP STEAM CONSUMPTION
LP STEAM CONSUMPTION
GUARANTEED COOLING WATER CONSUMPTION
OCTAMAX UNIT - DESIGN CASE-1
GUARANTEED POWER CONSUMPTION
MP STEAM CONSUMPTION
LP STEAM CONSUMPTION
GUARANTEED COOLING WATER CONSUMPTION
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Tata Projects Limited
Toyo Engineering India Private Limited
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Petrofac International (UAE) LLC
Petrofac International (UAE) LLC
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
US Dollar
European Euro
European Euro
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .