Loading…
Loading…
Tender Value
₹6.5 L
EMD Value
₹12,901
Closing Date
3 Sept 2026, 3:00 pm6d left
The Executive Engineer, DWS Division, Sabroom
O/o the Executive Engineer, DWS Division, Sabroom
R/Mtc. of RWS Schemes/S.H Maintenance and repairing of pipeline leakage, washing of pipeline, maintenance of hydrant and sluice valves of existing Water Supply Schemes at different locations of Rupaichari Sector under Rupaichari Block during 2026-27.
2026_CEDWS_76307_1
25/EE/DWS/DIVN/SBM/2026-27
Open Tender
Civil Works - Water Works
Percentage
365 days
Sabroom
Please refer tender documents.
8 documents required · 8 mandatory
₹1,000
₹12,901
25 Aug 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
25 Aug 2026 - 3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Charges for repairing of leakage in UPVC / HDPE pipe line with PVC coupler & solvent cement etc. including necessary earth excavation, backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. complete as per specification & direction of the Engineer-in-charge. | |||||
| 1.1 | i) 90 mm OD | - | No. | 558.1 | - |
| 1.2 | ii) 110 mm OD | - | No. | 623.2 | - |
| 1.3 | iii) 140 mm OD | - | No. | 689.1 | - |
| 2 | Clearing of diposited iron inside of laid PVC pipe line (90 mm/110 mm / 140 mm) excavation trenches for 100.00 mtr laid pipe line of required width and depth at an interval of 2.00 mtr to 3.00 mtr long for every 100.00 mtr. Clearing through UPVC coil pipe and laying same with coupler and cement solvent joint (PVC coupler and solvent cement to be issued at free of cost from the department). | - | Mtr. | 4.51 | - |
| 3 | Clearing of diposited iron inside of laid CI/DI pipe line of different dia. (150 mm/100 mm / 125 mm) and dismantling including trenching, refilling for every 100.00 mtr laid pipe line of required widht and depth, cutting for every 100.00 mtr pipe iron throug PVC coil pipe after clearing washing and laying the same with rubber gusket pipe layed joint as per direction of the Engineer-in-charge. (Pig lead will be issued by the department at free of cost but rubber gusket and other T&P will be arranged by the agency) | - | Mtr. | 13.28 | - |
| 4Providing, fixing and laying fabricated UPVC bend of required degree conforming to IS : 10124 ( part 8 / 9 / 10 / 11 / 12 / 13 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge. | |||||
| 4.1 | i) 90 mm dia. | - | No. | 298.7 | - |
| 4.2 | ii) 110 mm dia. | - | No. | 356.4 | - |
| 4.3 | iii) 140 mm dia. | - | No. | 466.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.47 MB
Appendix.pdf
Additional Documents • 0.40 MB
DNIeT-25.pdf
Tender Documents • 3.04 MB
BOQ_77680.xls
BOQ • 0.33 MB
Annexure-II.pdf
Additional Documents • 0.28 MB
Form-7.pdf
Additional Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].