Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹51.9 L
Closing Date
25 Aug 2021, 4:00 pmClosed
THE EXECUTIVE ENGINEER TLMD III AMARGARH
OFFICE OF THE EXECUTIVE ENGINEER TLMD III AMARGARH
LAYING AND CONSTRUCTION OF 02 NO PILE TYPE TOWER FOUNDATIONS FOR TOWER LOCATION NO 19 AND 20 OF 132 KV DOUBLE CIRCUIT DELINA BARAMULLA RAILWAY STATION TRANSMISSION LINE AT KANISPORA BARAMULLA UNDER IRCON
2021_PDD_134320_1
EE/TLMDA/21 OF 2021
Open Tender
Civil Works
Turn-key
25 days
KANISPORA BARAMULLA
AS PER SBD
7 documents required · 7 mandatory
₹3,000
Yes
THE EXECUTIVE ENGINEER TLMD III AMARGARH
Exempted
OFFICE OF THE EXECUTIVE ENGINEER TLMD III AMARGARH
27 Aug 2021
12 Aug 2021
26 Aug 2021
12 Aug 2021
25 Aug 2021
17 Aug 2021
12 Aug 2021 - 16 Aug 2021
17 Aug 2021
Amount
Clerance of site, Spotting of Centre of tower for placing of foundation with the help of total station/Theodolite including pit marking of 132 KV towers and other allied works for placement of piles ( Complete Job)
Construction of pile foundation for 132 kv Tower
Boring, providing and installing bored cast in situ reinforced cement concrete pile of specified grade, con mix diameter and length below the pile cap in M-35 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with casing and / or bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete including removal of excavated earth with lifts and leads (length of pile for payment shall be measured from top of shoe to the bottom of pile cap) 600 mm dia pile by percussion drilling using(DMC) or bailer and chisel technique by tripod and mechanical winch machine all complete.
Providing and laying of broken stone layer under pile caps and foundation rafts-300mm thick. Pile cap -300mm thick
Providing and laying cement concrete of specified grade including curing but excluding the cost of centring and shuttering, finishing and reinforcement all work up to plinth level as mud mat –1:3:6(1 cemnt:3 coarse sand: graded stone aggregate 20mm nominal size) - under pile cap/foundation raft
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering finishing and reinforcement –all work up to plinth level M-30 pile cap/foundation raft
Centering & shuttering including strutting and propping etc. And removal of forms for RCC work as in item "5" & "6" desired height in foundation, foundation beams, plinth beams, lintel beams, all types of suspended floors, soffits of beams ribs, stepped, spiral staircases etc up to desired heights and thickness complete.
Providing and fixing of galvanised Stub legs (min coating 5 micron) Welded in position as per details provided in the drawings for development of anchorage system for the upcoming towers. This includes the embedment of the said/fabricated anchorage system in the pile cap with all required precision for attachment to the up coming tower.
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position, and binding all complete up to plinth level. Thermo-mechanically treated bars of FE-500 For piles , Pile caps & grade beams.
LATIF AHMAD LONE
M/S NEW ALLIED
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .