Loading…
Loading…
Tender Value
₹17.4 L
EMD Value
₹34,758
Closing Date
7 Aug 2026, 2:00 pm6d left
Ex. Engineer R and B Division Shopian
RnB Division Shopian
C/O Road from HO Mohd Iqbal Naikoo to the Orchard of Mohd Ayoub Malik at Meemander, Phase I.
2026_PWDJK_318076_3
32/3475-85/RnB/SPN/e-tender of 27-07-2026
Open Tender
Civil Works
Percentage
60 days
Shopian
Please refer Tender documents.
5 documents required · 5 mandatory
₹800
Bearing No 0470010200000099
₹34,758
27 Jul 2026
27 Jul 2026
8 Aug 2026
28 Jul 2026
7 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation all kinds of soil by mechanical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge complete. | - | Cum | 0.2 | - |
| 2 | Providing and laying stone soling duly hand packed in maintaining level and section including all carriages complete. | - | Cum | 0.8 | - |
| 3 | Providing and laying in position cement concrete 1:4:8 (1 Cement : 4 Coarse Sand : 8 Grade Stone Aggregate 40 mm nominal size crushed) including curing but excluding the cost of centering and shuttering. All work upto plinth level including all carriages complete. | - | Cum | 0.2 | - |
| 4 | Providing and laying in position cement concrete 1:2:4 (1 Cement : 2 Coarse Sand : 4 Grade Stone Aggregate 20 mm nominal size crushed) including curing but excluding the cost of centering and shuttering. All work upto and above plinth level including all carriages complete. | - | Cum | 0.6 | - |
| 5 | Centering and shuttering (fresh kit ply) including strutting, propping etc. and removal of form work including applying of shuttering oil: Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | 0.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1045970.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].