| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC Agreement execuetd |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 Bidder |
| Sl No | Description | Qty | Unit | Kuriekal Projects And Contractors PVT Ltd L2 | KURIEKAL INFRASTRUCTURE L1 |
|---|---|---|---|---|---|
| 1.00DEMOLITION OF BRIDGE EXTENDING ABOVE CSSD, GMCHT | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 24.61 | cum | 2,650 ₹65,203.25 | 2,645 ₹65,080.23 |
| 1.00 | 15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge. | 6.4 | sqm | 1,150 ₹7,356.55 | 1,145 ₹7,324.57 |
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 14.84 | cum | 1,500 ₹22,257 | 1,495 ₹22,182.81 |
| 1.00 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 39.44 | cum | 163.45 ₹6,446.96 | 163 ₹6,429.21 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 195.72 | sqm | 475 ₹92,969.38 | 472 ₹92,382.20 |
| 1.01 | 26.36.1:Providing, erecting, maintaining and removing temporary protective screens
made out of specified fabric with all necessary fixing arrangement to ensure
that it remains in position for the work duration as required by the Engineerin-
charge.Wooven PVC cloth | 31 | sqm | 100 ₹3,100 | 95 ₹2,945 |
| 1.01 | 26.31.1:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | 2.48 | sqm | 140 ₹347.48 | 130 ₹322.66 |
| 1.01 | 26.32.3:Providing, mixing and applying SBR polymer (of approved make) modified
Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with
polymer minimum 2% by wt. of cement used) as per specifications and
directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be
done just after the surface preparation is completed and Payment under this
item shall be made only after proper wet curing has been done and surface
has been satisfactorily evaluated by sounding / tapping with a blunt metal
instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).50 mm average thickness in 3 layers. | 2.48 | sqm | 375 ₹930.75 | 370 ₹918.34 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 2.48 | sqm | 125 ₹310.25 | 110 ₹273.02 |
Tender Value
₹2.0 L
EMD Value
₹4,985
Closing Date
11 Mar 2026, 11:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer,Medical college subdivision P M G TVPM
Civil works
2026_PWD_843941_1
PWD/BLDG/TR/1135/2026_5_1_1/1
Open Tender
Civil Works - Buildings
90 days
Medical College TVPM
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,985
Yes
13 Apr 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
DEMOLITION OF BRIDGE EXTENDING ABOVE CSSD, GMCHT
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
26.36.1:Providing, erecting, maintaining and removing temporary protective screens made out of specified fabric with all necessary fixing arrangement to ensure that it remains in position for the work duration as required by the Engineerin- charge.Wooven PVC cloth
26.31.1:Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer
26.32.3:Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).50 mm average thickness in 3 layers.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1424714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.64 MB
epaymentform.pdf
Tender Documents • 0.06 MB
BOQ_1424714.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid