| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | L1 | Accepted-AOC L1 Agreement executed | |
| 2 | L2₹12.5 L+₹86,500 (7.44%)Rejected-Finance | L2 | Rejected-Finance Higher rate, hence rejected | |
| 3 | L3₹1.1 Cr+₹1.0 Cr (867.7%)Rejected-Finance | L3 | Rejected-Finance Higher rate, hence rejected |
| Sl No | Description | Qty | Unit | SYNERGY POWER TECH L3 | Best Power Controls L2 | DS3POWERSYSTEMS L1 |
|---|---|---|---|---|---|---|
| 1.00Solar | ||||||
| 1.00 | OD199246/2025-2026:Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 18%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. (This includes all necessary fees towards KSEB Inspectorate etc. for the commissioning and for doing all laison works) | 25 | kW | 4,50,000 ₹1,12,50,000 | 49,960 ₹12,49,000 | 46,500 ₹11,62,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹31,779
Closing Date
29 Oct 2025, 6:30 pmClosed
Assistant Executive Engineer
PWD ELECTRICAL SUB DIVISION,KLC, TVPM
DEPOSIT-Court Complex at Nedumangad, TVM - SITC of Ongrid Solar plant-SolarGeneral Electrical Work
2025_PWD_813769_1
PWD/BLDG/TR/15839/2024
Open Tender
Electrical Works
Item Rate
120 days
NEDUMANGADU
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹31,779
18 Dec 2025
23 Oct 2025
30 Oct 2025
23 Oct 2025
29 Oct 2025
23 Oct 2025
Amount
Solar
OD199246/2025-2026:Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 18%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. (This includes all necessary fees towards KSEB Inspectorate etc. for the commissioning and for doing all laison works)
Best Power Controls (BID ID -2415623)
SYNERGY POWER TECH (BID ID -2415008)
Bidder Name
SYNERGY POWER TECH
Best Power Controls
DS3POWERSYSTEMS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1360755.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1360755.xls
BOQ • 0.30 MB
agree.pdf
Other Document • 0.53 MB
IP.pdf
Other Document • 0.19 MB
affi.pdf
Other Document • 0.47 MB
epayment.pdf
Other Document • 0.38 MB
make.pdf
Other Document • 0.19 MB
viewsbd.pdf
Tender Documents • 2.17 MB
form.pdf
Other Document • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .