EXECUTIVE ENGINEER VADODARA IRRIGATION DIVISION
Carring out Repairing of spillway upstream Remaining portion of piers of Deo Dam by Grouting Ta.Halol Dist.Panchmahal
284586
Tender Notice No 30 of the year 2025-26
Open
Civil Works - Water Works
Vadodara
6 documents required · 0 mandatory · 6 optional
₹1,500
Yes
Executive Engineer, Vadodara Irrigation Division, Vadodara
₹48,000
Yes
10 Mar 2026
10 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
Name of Work : Carring out Repairing of spillway upstream Remaining portion of piers of Deo Dam by Grouting
Ta.Halol Dist.Panchmahal
Item Rate (Without
Item Description Qty Unit Amount
1 Nipple fixing including drilling the holes of diameter 22mm.(minimum 15mm 957 Nos. 201
internal diameter of nipples ) and 20cm in depth in RCC/PCC irrigation
structure's components incl fixing of nipple by applying prime coat done with
BIS standard quality material of Resin+Hardner mixing material & quality that
works in wetted condition. Pointing done with water plugging BIS standerd
quality material in first coat and after that second coat done with epoxy base
putty of Resin+ Hardener mixing ( 1part Resin+1part Hardener ,+8part Silica ).
and sealing the nipple hole with appropriate material and process after
2 Grouting done by injection process in RCC/PCC irrigation structure's 18400 1 Kg of Dry 49
components through Nipples with pressure 3 to 7 kg/cm2 and as per Cement
instruction, with materials(1bag cement of 50kg of 53 grade with Sika latex or
FBR or equivalent quality 2Lit + Sika 4A or equivalent quality 1Lit +FL 40 or
equivalent quality 8kg + Fair add or Intra plast or equivalent quality
grams with sufficient water for easy grout ).The rate includes cost of
materials,labours scaffolding, equipments etc. and material to be used of BIS
3 Grouting done by injection process in RCC/PCC/Masonary irrigation/Dam 552.5 Kg 3278.8
structure's components through Nipples with pressure 1 to 1.5 kg/cm2 and as
per instruction, with materials (101h injection grout + 201ce polyurethen two
componant resin permanent watertight sealing ). The rate includes cost of
aterials, labours scaffolding, equipments etc. and material to be used of BIS
4 Dismantling the R.C.C. work and disposing off the stuff including stacking of 192 Cum 1732.8
the useful materials etc. complete as directed.(a)Light Reinforcement ( Main
bar upto 16 mm. dia. )
5 Removal of defective concrete, cleaning the surface thoroughly, as per directed 576 Sq.mt 68.68
as per engineer incharge
6 Epoxy bonding of new concrete to old concrete / Rubble masonary 576 Sq.mt 529.24
7 Providing and laying cement concrete of specified grade by using cement, sand 192 Cum 5071.9
and coarse aggregate incl. Necessary form work, centring, mixing, laying,
vibrating, finishing, curing etc. complete. Excluding cost of reinforcement.
CM-28(L)M-20 grade for : Block out for embedded parts
8 Crack filling in RCC/PCC irrigation structure's components with epoxy based 1500 Rmt 151
putty incl racking the cracks cleaning curing etc complete.Prime coat done
with material of Resin+Hardner mixing of BIS standerd quality material &
quality that works in wetted condition. Pointing done with water plugging BIS
standerd quality material in first coat and after that second coat done with
epoxy base putty of Resin+ Hardner mixing ( 1part Resin+1part Hardener
,+8part Silica ). The rate includes cost of materials labours scaffolding
equipments etc.
Deputy Executive Engineer
Irrigation Project Sub division no.23
I / We am/are willing to carry out the work at............................ % above/ below percent ( should written in figure and words )
of the estimated rate mentioned above.Amount of my/our tender works out as under
Estimated amount Put to tender Rs.__________ Estimated amount Put to tender Rs__________
Net Rs. ______________ Net Rs.
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-InCharge for which no extra payment
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills.
4. GST Will be paid Sepretely.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me and found order.
Divisional Accountant Executive Engineer
Vadodara Irrigation Division Vadodara Irrigation Division
Vadodara Vadodara
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Grouting DTP 2026.pdf
Item Wise Technical Specification.pdf
BOQ Grouting.pdf
spillway section Deo Dam drawing_compressed (1).pdf
Download all tender documents and submit your bid