| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹10.6 L+₹27,952.46 (2.70%)Admitted-Fee/PreQual/Technical/Finance NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹11.2 L+₹86,394.67 (8.34%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | V. JOY L3 | DAISY JOSE L2 | WILSON THOMAS L1 |
|---|---|---|---|---|---|---|
| 1.00Appendics-A- Suction pit Cleaning | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 356 | sqm | 16.06 ₹5,717.36 | 15.23 ₹5,421.88 | 14.82 ₹5,275.92 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 286.24 | cum | 227.49 ₹65,116.74 | 215.64 ₹61,724.79 | 209.97 ₹60,101.81 Lowest |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 660.48 | kg | 165.17 ₹1,09,091.48 | 156.56 ₹1,03,404.75 | 152.45 ₹1,00,690.18 Lowest |
| 1.00 | OD23734/2026-2027:Supplying and fixing plastic mesh 25x25x2mm for trash rack to to fixing GI pipe
frames including cost and conveyance of all materials and labour charges etc complete | 72 | sqm | 362.07 ₹26,069.04 | 343.2 ₹24,710.4 | 334.18 ₹24,060.96 Lowest |
| 1.00 | OD23733/2026-2027:Labour engaged for clearing blocks in siphons , removal of obstructions and waste etc in canal during the entire periods of water distribution | 67 | each | 955.56 ₹64,022.52 | 905.78 ₹60,687.26 | 881.98 ₹59,092.66 Lowest |
| 2.00Appendics- B- Canal Rectification works | ||||||
| 2.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 22.42 | cum | 1,372.56 ₹30,767.3 | 1,301.06 ₹29,164.56 | 1,266.86 ₹28,397.93 Lowest |
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 39.27 | cum | 227.49 ₹8,933.76 | 215.64 ₹8,468.4 | 209.97 ₹8,245.73 Lowest |
| 2.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 27.24 | cum | 7,004.74 ₹1,90,809.12 | 6,639.83 ₹1,80,868.97 | 6,465.31 ₹1,76,115.04 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,763
Closing Date
23 Sept 2026, 3:30 pmClosed
Assistant Executive Engineer
Office of Assistant Executive Engineer MI SUBDIVISION ALUVA
Annual maintenance
2026_Irrig_871474_1
IRR/IA/TR/3797/2026_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
300 days
Malayattur
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹31,763
Yes
24 Sept 2026
19 Sept 2026
24 Sept 2026
19 Sept 2026
23 Sept 2026
19 Sept 2026
19 Sept 2026 - 23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendics-A- Suction pit Cleaning | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 356 | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 286.24 | cum | - | - |
| 1.003 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 660.48 | kg | - | - |
| 1.004 | OD23734/2026-2027:Supplying and fixing plastic mesh 25x25x2mm for trash rack to to fixing GI pipe
frames including cost and conveyance of all materials and labour charges etc complete | 72 | sqm | - | - |
| 1.005 | OD23733/2026-2027:Labour engaged for clearing blocks in siphons , removal of obstructions and waste etc in canal during the entire periods of water distribution | 67 | each | - | - |
| 2Appendics- B- Canal Rectification works | |||||
| 2.001 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 22.42 | cum | - | - |
| 2.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 39.27 | cum | - | - |
| 2.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 27.24 | cum | - | - |
stage.html
html • 0.02 MB
finance_1477147.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PAY.pdf
Tender Documents • 0.04 MB
Preliminaryagmt.pdf
Tender Documents • 0.06 MB
BOQ_1477147.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 2.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .