Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
19 Aug 2026, 6:00 pm
Executive Engineer Panchayat Road and Building Division, Bhavnagar
Construction of Various Structure of Bhavnagar District Pkg.No./RPC-2/BVN/STRC/MMGSY-NORMAL/2025-26/P.NO.8 Ta. Mahuva Dist.Bhavnagar
330911
12/2026-27 of Bhavnagar Sr. No.4
Open
Civil - All
Works
Bhavnagar
5 documents required · 5 mandatory
₹3,600
Executive Engineer Panchayat R&B Division Bhavnagar
₹1.7 L
3 Aug 2026
3 Aug 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
Name of work:- Construction of Various Structure of Bhavnagar District Pkg.No./RPC-2/BVN/STRC/MMGSY-
NORMAL/2025-26/P.NO.8 Ta. Mahuva Dist.Bhavnagar
BILL OF QUANTITIES
Item Description of Item (With brief specification and reference to Quantity Unit Rate In Amount
No. book of Specification) Figures
1 WBM Grading 2 (By Manual Means) Providing, laying, spreading 96.60 One 1408.49
and compacting stone aggregates of 63 to 45mm sizes to water Cum
bound macadam specification including spreading in uniform
thickness, hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and brooming,
stone screening/binding materials to fill-up the interstices of
coarse aggregate, watering and compacting to the required
2 Rolling of earthwork in layers with power roller including filling 701.80 One 23.17
in depression which occur during the process. Watering of earth Cum
work as directed.
3 Earth work for embankment including breaking clods, dressing 651.80 One 161.67
with all lead and lift. (Excluding watering and consolidation) (C ) Cum
From Borrow area within 1.0 Km lead and should have CBR not
less than 6.00%.
4 Excavation for foundation upto 1.5 m depth including sorting out 539.00 One 259.93
and stacking of useful materials and disposing of the excavated Cum
stuff upto 50 mtr lead. Dense or hard soil.
5 Excavation for foundation upto 1.5m depth including sorting out 460.00 One 442.90
and stacking of useful materials and disposing of the excavated Cum
stuff upto 50 mtr lead. Hard Murrum
6 Excavation of foundation in hard murrum and boulders and very 621.80 One 625.87
stiff or sticky clays and other similar strata including shorting out Cum
and struting and dewatering as necessary and disposing of the
excavated stuff as directed.
7 Excavation in large boulders and soft rock by wedging including 347.60 One 733.62
shoring, strutting and dewatering as necessary and disposing of Cum
the excavated stuff as directed,
8 Providing and fixing Mild steel dowel bar of minimum 32mm dia. 60.00 One 450.06
For anchoring by drilling holes in foundation strata including Rmt.
necessary bending, hooking of dowel bars and grouting the holes
complete as per detailed drawing and as directed.
9 Providing and casting in situ ordinary cement concrete M-150 mix 1416.90 One 3938.30
and providing necessary pin headers including shuttering, Cum
scafilding, laying vibrating, curing and finishing complete
Without V-Grooves. (A) Height from 0.0 m to 5.0m
10 Providing and filling in foundation with ordinary cement concrete 243.10 One 3362.24
M-100 mix and providing necessary vertical pin headers incl. Cum
Formwork, vibrating, ramming and curing complete.
11 Providing parapet of ordinary cement concrete M-200 as per 58.00 One 1089.66
detailed drawing with necessary reqinforcement including Rmt.
shuttering laying vibrating and finishing to line and level
complete (ii) cast in situ.
12 Providing and casting in situ controlled cement concrete M-200 for 578.60 One 5247.04
R.C.C. Return as per drawings including centering shuttering, Cum
scaffolding where necessary, laying vibrating, curing and
finishing complete. (A) Height from 0.0 to 5.0 M. (1) Piers
(2)Abutment (3) RCC return
13 Providing and casting in situ Contolled Cement concrete M 200 37.60 One 5327.23
for R.C.C. works in pier cap, abutment cap, and dirt wall Cum
including controlled cement concrete M 250 bed block or pedestals
for required size below bearings as per detailed drawings,
centering, shuttering, scaffolding wherever necessary laying,
vibrating, curing and finishing complete.
14 Providing and casting in situ Controlled cement concrete M 250 136.40 One 5294.73
for R.C.C. Solid slab including centering, scaffolding, curing and Cum
finishing complete.
15 Providing and casting in situ Contolled cement concrete- M-200 117.90 One 5320.24
for avarage 75 mm thick wearing coat laid as directed incuding. Cum
tamping, vibrating, finishing, curring and filling in joints with
bitumen complete.
16 Providing and casting in situ Contolled cement concrete- M-200 31.10 One 5178.40
for Approach slab including formwork, curing and finishing Cum
17 Providing and casting in situ Controlled cement concrete- M-200 7.20 One 4886.91
Kerb/Kerb blocks including formwork,curing and finishing Cum
18 Providing and laying Weep Hole in Abutments and returns by 394.00 One 62.93
using A.C. pipe of 100mm. Incl. fixing in proper grade and No
jointing the complete as per detailed specification
19 Providing and laying filter media 600mm. thick directed at the 115.00 One 1268.86
back of abutments, returns and wing walls as per detailed Sqm
specifications.
20 Providing and fixing in position Mild steel dowel bars in pier cap 24.00 One 341.28
or abutment caps for anchorage in fixed end as per detailed No
drawings including cutting bending and welding complete.
21 Providing and fixing in position Mild steel dowel bars in pier cap 24.00 One 399.69
or abutment caps for anchorage in free end as per detailed No
drawings including cutting bending and welding complete.
22 Providing and laying in Position FE 500D TMT bar reinforcement 15.690 One 73858.69
including cutting, bending, hooking and tying complete as per MT
detailed drawings for the following (A) Piers (B) Abutments (C)
23 Providing and Fixing in position FE 500D TMT bar reinforcement 16.480 One 73243.01
including cutting, bending and tying complete as per detailed MT
drawaing (A)RCC kerb (B) RCC Footpath (C) RCC App. Slab (D)
24 Providing Pre moulded Asphlat Joint as per drawings (A) 12 mm 29.50 One 703.52
25 Providing G.I. 100mm. Diameter water spouts including necessary 16.00 One 536.02
iron gratings as per drawings. No
26 Providing flood gauge marks on sub structure as per design 6.80 One 160.06
including painting complete Sqm
27 Filling available excavated earth (excluding rock ) in trenches 1794.60 One 137.47
plinth sides of foundation etc. in layers not exceeding 20cm in Cum
depth consolidating each deposited layer by ramming and
28 Supplying and fixing reinforced concrete heavy duty nonpressure 15.00 One 3469.25
pipes with collars for culverts carrying heavy traffic as per IS 458- Rmt.
1991 specifications including setting the pipes in C.M. 1:2
watering and laying (to level or slopes) of class NP3 of following
internal daimeters.I)900mm. Dia
29 Dismantling the existing structure including removing and 213.10 One 933.16
stacking the dismantled materials as and where directed. RCC Cum
30 Dismantling C.I. Pipes G.S.W. Pipes and A.C Rain water pipes 37.50 One 77.04
with fitting and clamps including stacking the materials with all Rmt.
lead and lift (for any dia of pipe)
31 W": Metal Beam Crash Barrier Providing and erecting a "W" metal 155.00 One 3723.46
beam crash barrier comprising of 3mm thick corrugated sheet Rmt.
metal beam rail, 70cm above road/ground level, fixed on ISMC
series channel vertical post, 150x75x5mm spaced 2m centre to
centre, 1.8m high, 1.1m below ground/road level, all steel parts
and fitments to be galvanised by hot dip process, all fittings to
confirm to IS:1367 and IS 1364, metal beam rail to be fixed on the
vertical post with a spacer of channel section 150x75x5mm,
330mm long complete.
32 Numbering the CD work with approved paint including all 4.00 One 58.80
materials for painting etc. complete. No
33 Providing temporary all weather and fair weather diversion 192.00 One 1761.19
suitable for traffic during the construction period of the bridge Rmt.
/slab drain / Causeway / HPD etc. including all safety measures
for traffic etc.
One Crore Sixty Five Lakh Sixteen Thousand One Hundred Ninety Rupees And Eighty Five Paisa.
I \ We am \ are willing to carry out the work at ……………………… % above \ below percent ( Should be written in
figures and words ) of the estimated rate mentioned above. Amount of My \ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
NOTE: Amount Rs 41763 of Dismentalled materials shall be recovered from 1st R.A. bill of Contractor at once.
Signature of Contractor.
Deputy Executive Engineer Executive Engineer
Panchayat R&B Sub Division Panchayat R&B Division
Mahuva Bhavnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GR SBD.pdf
9.Invorement (MMGSY).pdf
Tender Notice No.12 of 2026-27.pdf
BOQ MM-N-CtoB-P.8-Mahuva.pdf
SBD MM-N-CtoB-P.8-Mahuva.pdf
Speci. MM-N-CtoB-P.8-Mahuva.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].