| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | FRANCIS PINHERO L1 |
|---|---|---|---|---|
| 1.00Motor Overhauling Works | ||||
| 1.00 | OD57380/2025-2026:Dismantling the 60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 1 | each | 5,658 ₹5,658 |
| 1.00 | OD57383/2025-2026:Dismantling the 160 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 2 | each | 7,000 ₹14,000 |
| 1.00 | OD57381/2025-2026:Dismantling the 190 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 1 | each | 7,000 ₹7,000 |
| 1.00 | OD57382/2025-2026:Dismantling the 120 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 1 | each | 7,000 ₹7,000 |
| 2.00Motor Lowering Works | ||||
| 2.00 | OD57395/2025-2026: Lowering down and erecting 10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 900 ₹900 |
| 2.00 | OD57394/2025-2026: Lowering down and erecting 5 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load | 1 | each | 910 ₹910 |
| 2.00 | OD57392/2025-2026: Lowering down and erecting 60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 5,001 ₹5,001 |
| 2.00 | OD57391/2025-2026: Lowering down and erecting 190 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 8,087 ₹8,087 |
Tender Value
₹3.8 L
EMD Value
₹9,497
Closing Date
26 Feb 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Kanjoor LIS under Electrical irrigation section Kalady- Electrical -General Electrical Work
2025_Irrig_815854_8
PWD/BLDG/ALY/11398/2025-2026
Open Tender
Electrical Works
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹840
₹9,497
1 Apr 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Motor Overhauling Works
OD57380/2025-2026:Dismantling the 60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD57383/2025-2026:Dismantling the 160 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD57381/2025-2026:Dismantling the 190 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD57382/2025-2026:Dismantling the 120 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Motor Lowering Works
OD57395/2025-2026: Lowering down and erecting 10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD57394/2025-2026: Lowering down and erecting 5 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load
OD57392/2025-2026: Lowering down and erecting 60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD57391/2025-2026: Lowering down and erecting 190 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD57390/2025-2026: Lowering down and erecting above 160 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD57393/2025-2026: Lowering down and erecting above 120 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and Supplies
OD57367/2025-2026:Supply and renewal of Multifunction meter to read: multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD in panel board after dismantling the damaged one, L&T or Equivalent make.
OD57366/2025-2026: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD57370/2025-2026:Supply and Installing 20 W LED Tube light.
90.16.3.3:Supply and clamping the following size of strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 X 3 mm GI flat duly painted or heavy duty GI spacer saddles spacing of clamps not exceeding 1 m, making good the damages, colour washing etc. as required ( for horizontal run)25 x 6 mm GI strip
OD57372/2025-2026:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD57373/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 SKF / FAG or equivalent, suitable for 120-190 HP motor / pump set, as per the direction of Departmental staff at site.
OD57365/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6313 , SKF / FAG or equivalent, suitable for 60 HP motor / pump set as per the direction of Departmental staff at site.
OD57368/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6315 , SKF / FAG or equivalent, suitable for 120-190 HP motor / pump set , as per the direction of Departmental staff at site.
OD126272/2025-2026:Supply and fixing 95A 3 pole Power contactor motor starter AC3 rating at415v with Ac coil, Auxiliary contacts 2NO/NC (L&T or equivalent make)
Motor AMC
OD57386/2025-2026:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed
OD57387/2025-2026:Fully Comprehensive Annual Maintenance of 10 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor through out the AMC period whenever necessary (excluding rewinding) repairs of vacuum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pump set, base plate all time during the period of contract and the faults should be rectified with in the time allowed
OD57388/2025-2026: Fully Comprehensive Annual Maintenance of 60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD57385/2025-2026: Fully Comprehensive Annual Maintenance of 190 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD57389/2025-2026: Fully Comprehensive Annual Maintenance of 160 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .( Total 2 motors 12 months each)
OD57384/2025-2026:Fully Comprehensive Annual Maintenance of 120 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Motor Lifting Works
OD57375/2025-2026: Lifting the 10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD57376/2025-2026:Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD57377/2025-2026: Lifting the 60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD57379/2025-2026: Lifting the 190 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD57378/2025-2026: Lifting the 160 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD57374/2025-2026: Lifting the 120 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
Rewinding
OD59350/2025-2026:Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding, power above 120 HP, leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro Conveyance Charges,resetting the rewound motor, refitting the motor on the base plate, couplin with pump in correct alignment, givin wire connection , taking trial run on full load.
OD59352/2025-2026:Charges for rewinding the burnt rotor/stator - separate stater and rotor/stator, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new rotor/stator lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running(Less scrap copper)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1411722.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.37 MB
NIT.pdf
Tender Documents • 0.02 MB
MAKE.pdf
Tender Documents • 0.20 MB
SBD.pdf
Tender Documents • 1.63 MB
BOQ_1411722.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid