Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.1 Cr+₹20.9 L (4.26%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.2 Cr+₹31.3 L (6.39%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L3₹5.2 Cr+₹31.3 L (6.39%)Admitted-Finance | L3 | Admitted-Finance | ||
| 5 | L4₹5.3 Cr+₹38.7 L (7.90%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹6.3 Cr
EMD Value
₹12.7 L
Closing Date
2 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, PR, Visakhapatnam
OFFICE OF THE SUPERINTENDING ENGINEER, PR CIRCLE, Z.P.COMPOUND, VISAKHAPATNAM
Package No.AP19PVT102 L050 Road from Kondru Road to Thaggupadu in Pedabayalu Mandal of Alluri Sitharama Raju District, Est.Cost.Rs.790.00Lakhs Rs.60.60Lakhs for Routine Maintenance
2025_ENCPR_142216_1
NIT No.83/2025-26/PMGSY-PMJANMAN Batch-I(2024-25)/SE,PR,VSP, Dt.18.06.2025, SE, PR, Visakhapatnam(3r
Open Tender
Civil Works - Roads
Percentage
365 days
Thaggupadu in Pedabayalu Mandal
AS PER SBD
3 documents required · 3 mandatory
₹0
₹12.7 L
OFFICE OF THE SUPERINTENDING ENGINEER, PR CIRCLE,
13 Aug 2025
25 Jun 2025
7 Jul 2025
25 Jun 2025
2 Jul 2025
25 Jun 2025
25 Jun 2025 - 2 Jul 2025
28 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Package No.AP19PVT102-L050- Road from Kondru Road to Thaggupadu in Pedabayalu Mandal of Alluri Sitharama Raju District, | - | - | - | - |
| - | Road Part | - | - | - | - |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD, including Overhead charges & Contractor's profit but excluding GST, etc., complete. | 22,120 | Sqm | 2.45 | ₹54,194 |
| - | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete. | 40,000 | Cum | 96 | ₹38,40,000 |
| - | Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete. | 500 | Cum | 229 | ₹1,14,500 |
| - | Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH, including Overhead charges & Contractor's profit but excluding GST, etc., complete. | 8,050 | Cum | 551 | ₹44,35,550 |
| - | Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete. | 4,740 | Cum | 3,860 | ₹1,82,96,400 |
| - | Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 & 407 MORD, by using machinery, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete. | 4,444 | Cum | 457 | ₹20,30,908 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete. | 4,444 | Cum | 5,070 | ₹2,25,31,080 |
| - | Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including Overhead charges & Contractor's profit but excluding GST, etc., complete. | 29,625 | Sqm | 41.7 | ₹12,35,362.5 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.34 MB
Tenderdocument.pdf
Tender Documents • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .